STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE

Slides:



Advertisements
Similar presentations
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Advertisements

Construction Engineering 221 Cost Estimating and Bidding II.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 8 Pricing General Expenses. Introduction The direct costs of a building project include the cost of labor, material, equipment, and subtrades.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
The Risks and Rewards of Contractor Bids and Proposals.
Chapter 5 Construction Tools and Equipment. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Differentiate.
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Welcome to Financial Series #1 The Income Statement.
ESTIMATING By Laith Jacob.
 At least 5 years experience as a worker  Must pass the state exam.
EM15 – Contractors COST MANAGEMENT
Economics of Food Hubs Smithson Mills May 6, 2014.
Economics – Why Today? Collecting data Additional information for request –Single vs multiple units –Quantity –Quality Future decisions Economic analysis.
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Kuliah Ekonomi Teknik JTK FT UGM Total product cost  Total product cost: costs for operating the plant and selling the products.  Total product.
การออกแบบ โรงงานทาง วิศวกรรมเคมี (Chemical Engineering Plant Design) 3(3-0-6)
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
1 The George Washington University School of Engineering & Applied Science Department of Electrical & Computer Engineering Engineering Economic Analysis.
April 11, 2007 Strengthening Communities Conference Managing Your Risks Ron Dennill Northern Communities Insurance Program.
Manufacturing vs Non-Manufacturing Costs
Technical Manager; Bechtel Oil, Gas & Chemicals.
Costs Associated with Owning and Operating a Small Business.
S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE BY Awad S. Hanna Associate Professor Department of Civil and Environmental Engineering The University.
CHAPTER 9 BUDGETS. Financial management 1.Is the aim to make a profit? 2.How much will the event cost? 3.What are the revenue sources? 4.How many tickets.
Production, Marketing and Administrative costs Manufacturing companies convert materials into finished goods. There are two type of costs involved here:
Cash Flow (Pro Forma statement)
Chapter1Chapter1 ACCOUNTING FOR MANUFACTURING OPERATION.
Barnhart Community Development Jacob Lawrence Ryan Lawrence Mike Schweppe Brad Bartlett James Stamps Brookee’ Adams.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
COVER YOUR BASES By: Pete Spatara By: Pete Spatara Director of Public Works Director of Public Works City of West Palm Beach City of West Palm Beach.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Horticulture CD-Rom Illinois CORE Curriculum. Unit C Nursery, Landscaping, and Gardening.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Lesson 8 Pricing the Landscape Plan. Next Generation Science/Common Cores Standards Addressed! n CCSS.Math.Content.7.R P.A.3 Use proportional relationships.
Budgeting and Cost Estimation Objective: – Introduce some simple concepts regarding developing project budgets and cost projections.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Construction Auditing Tuesday, September 15, :00-5:15 pm Presented By: John Humphries Kelly Business Consultants 8084 Watson Road, Suite 200 St Louis,
Cost Estimating and Budgeting. Cost Estimating Initial Cost Estimate Initial Cost Estimate Underestimates are Initially a Big Problem Underestimates are.
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
Markup vs. Margin Margin is the amount of gross profit, net profit, or overhead, compared to volume of work. (Expressed as a percentages) Markup is the.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 4 STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE.
4. Price Labor, Materials, and Equipment Ⓒ. L ABOR C OST Six Components to the Labor Cost: 1. Wages 2.Worker's Compensation Insurance 3.FICA Tax, Federal.
Bus Program Operating Costs TRANSPORTATION POLICY COMMITTEE July 2, 2003.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
Lesson 8 Pricing the Landscape Plan Reminder: student learning activities are at the end of this power point.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Is There a Proper Accounting for Indirect Costs?
Cannask Limited Truly Organic.
Tavis Karnes.
Process Economics Factors that affect profitability
Equipment Costs and Sources of EQUIPMENT COST
Costs and Economics of Construction
(Additional materials)
Financing Land Development Projects
9/18/2018 Bids CONTRACTING Khamis…..
BUSINESS INCOME COVERAGE EXPENSE CHART
CIVL 493 CONSTRUCTION MANAGEMENT
Estimating – Overhead, Profit, Margins, & Markups workshop
ARCH 435 PROJECT MANAGEMENT
Manufacturing Cost Elements 1. Cost Concepts Cost refers the amount of expenses spent to generate product or services. Cost refers expenditure that may.
ESTIMATE TAKE-OFF & RELATED MATH WORKSHOP - Part 2
Basic Principles of Estimating
© 2004 Ewing Marion Kauffman Foundation
Presentation transcript:

STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE DR. Nabil Dmaidi DR. Nabil Dmaidi

1. Study project documents 2. Develop Work Breakdown Structure (WBS) and Cost Code 3. Determine quantity take off 4. Price materials, equipment and labor 5. Define work done by others and obtain quotations DR. Nabil Dmaidi

6. Determine Job Overhead Cost Indirect Job Labor Project manager and/or Superintendent Project engineer Draftsman Timekeeper Office manager and/or secretary Safety engineer and/or first aid attendant Watchmen Indirect Job Equipment Project manager’s vehicle Pickup truck Site maintenance Site Facilities Construction Sign Job site fence Construction access/entrance Portable toilets Office trailers: contractor’s,engineer’s, first aid, change room and lockers Telephone service Temporary electric utilities Shop or maintenance facility Fuel for general job vehicles Materials Handling and Storage Material storage area & bins Warehouse facility Subcontracted Indirect Cost Disposal services Soil or rock borings Laboratory tests Soil samples Rock samples Concrete samples Surveying service CPM scheduling services Job photographs Models Artist renderings Bonds and Insurance Performance bond Builders rick Insurance Contractor’s liability insurance Permits Building Site improvement Road or entrance Additions for Remote Sites Communications Living quarters for workmen Kitchen and food service Entertainment Transportation Temporary power Water supply Waste disposal DR. Nabil Dmaidi

7. Determination of Markup Markup is an allowance for: a. Home Office overhead b. Contingency c. Profit Markup ranges from 5% to 20% of the total project costs DR. Nabil Dmaidi

a. Home Office Overhead Salaries Executive staff marketing staff Accounting staff Estimating staff Legal staff Support staff: clerical, data processing, etc. Facilities Office purchase or rental Furniture purchase or rental Data processing equipment Utilities Telephone, fax, etc. Heating & air conditioning Illumination Water Taxes Company Income Property Insurance Company policies not chargeable to projects Benefits Pension & retirement program Profit sharing & bonus plans Health insurance plan Transportation Company aircraft Company automobiles Company trucks Commercial travel Marketing Advertising Estimating Other promotional costs Maintenance Maintenance& overhaul, not just chargeable DR. Nabil Dmaidi

b. Contingency To cover unexpected risk, error and omission, and contract risk DR. Nabil Dmaidi

c. Profit Profit varies from 1% to 10% or more Factors affecting profit Need for work Contract type Total bid value Risk Competition Economic Condition DR. Nabil Dmaidi

8. Determination of Contract Bond Cost The contract document usually requires as a minimum a “performance bond” and a “payment bond.” Bond cost ranges from 0.5 % to 1% of the total contract price. DR. Nabil Dmaidi

Example of Determining Total Contract Price Assumptions 1. Sales Tax = 6% of Direct Material Costs 2. Job Overhead Labor Costs = 25% of Direct Labor Costs 3. Job Overhead Management Costs = 10% of Direct Labor Costs 4. Markup = 20% of Total Project Costs Office O.H. = 10% Contingency = 2% Profit = 8% 5. Bond = 0.5% of 1% of Total Project Costs DR. Nabil Dmaidi

Example of Determining Total Contract Price (cont.) Estimated Directed Job Costs 1. Direct Labor Costs $25,670 2. Direct Material Costs 15,000 3. Direct Equipment Costs 13,000 (Owning & Operating Costs) 4. Subcontract Costs 20,000 5. DIRECT COST SUBTOTAL $73,670 DR. Nabil Dmaidi

Example of Determining Total Contract Price (cont.) Job Overhead Costs 6. Sales Tax [6% of (2)] $ 900 7. Job O.H. Labor [25% of (1)] $ 6,418 8. Job O.H. Management $ 2,567 [10% of (1)] 9. Total Job Overhead Costs $ 9,885 10. Total Estimated Job Costs $ 83,555 [(5) + (9)] 11. Total Cost [(10) x 1.2] $ 100,266 12. Bond [0.005 x (11)] 501 13. TOTAL CONTRACT COST $ 100,767 [(11) + (12)] DR. Nabil Dmaidi

Example of Determining Total Contract Price (cont.) TOTAL CONTRACT COST 100,767 Bid Factor = = = 1.368 73,670 DIRECT COST SUBTOTAL 14. Markup [(11) - (10)] $16,621 Breakdown of Markup 14a. Office O.H. [0.10 x (10)] $ 8,356 14b. Contingency [0.02 x (10)] 1,671 14c. Profit [0.08 x (10)] 6,684 DR. Nabil Dmaidi

Total Components of Cost within a bid Insurance Training Salaries Etc. Office equip. Testing Parking lot Access road Project office Janitors Portable toilets Support constr. Guard Materials Labor Installed Constr. Equip. markup Bid Price Project Cost Overhead structure Subcontractors Force account executed Work packages Direct costs Job indirects + = Main Office Job DR. Nabil Dmaidi