KMCO CAPA System Training

Slides:



Advertisements
Similar presentations
Checking & Corrective Action
Advertisements

Quality Management System Corrective and Preventive Actions Argenis Osorio – Manager, Quality Assurance 19 September 2013 FACULTY MANAGEMENT.
[Organisation’s Title] Environmental Management System
Environmental Management System (EMS)
 Contracts  Subcontracting  Suppliers  Complaints  Corrective and preventive actions (CAPA)  Internal audits  Management reviews Management requirements.
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
ISO 9001 : 2000.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
The ISO 9002 Quality Assurance Management System
Quality Management System
ISO General Awareness Training
ENERGETIC MATERIALS Co. Root Cause Analysis Guidelines 1.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
ISO 9000 Certification ISO 9001 and ISO
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
5.2 Personnel Use competent staff Supervise as necessary
Training.
Five Star Quality Consultants Implementing ISO 9001 Corrective and Preventive Action.
Visit us at E mail: Tele:
Fundamentals of ISO.
University of Sunderland CIFM03Lecture 3 1 QMS / Standards CIFM03 Lecture 3.
13th &14th July 2010 Gaelle Rousseau-Lamour
Environmental Management System: Corrective and Preventive Action August 2005.
Ship Recycling Facility Management System IMO Guideline A.962
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Basics of OHSAS Occupational Health & Safety Management System
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
Creating a Risk-Based CAPA Process
ISO 14001:2004, Environmental Management System
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
4.3 Document control 4.4 Review of requests, tenders and contracts
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
ISO, QMS & CIR Awareness 2013.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
A QUALITY IMPROVEMENT TOOL
Corrective and Preventive Action
2016 MFRPS: Changes To Standard 10 Guy F. Delius, R. S. CSO Food and Drug Administration Office Of Partnerships Standards Implementation Staff February.
Visit us at E mail: Tele:
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
Quality Management: Mutually beneficial supplier relationships.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Quality System Deployment in a Clinical Trials Vendor Environment Jeffrey Brandt Quality Assurance Manager Rocky Mountain Poison and Drug Center First.

UNDERSTANDING ISO 9001:2008.
Project Quality Management
ISO/IEC
Awareness program on ISO/TS16949:2002
Fundamentals of ISO.
UNIT V QUALITY SYSTEMS.
4.5 Checking and Corrective Action Monitoring and Measurement
Quality Management Systems – Requirements
Achieving ISO Compliance
ISO 9001 Awareness Training.
Director, Quality and Accreditation
Agenda Who are we? 1 Introductions Journey so far 2
Audit Findings Process
AS 9100 Awareness Training.
Company Name Date By Whomever
All non-conformances must be resolved by identifying the root cause and defining the action(s) taken to prevent recurrence. In addition, the immediate.
ISO 9001:2000 Management System Overview
ISO 9001:2000 Awareness Training
QMS Deployment Kickoff Meeting
Nonconformity Writing
Company Name Date By Whomever
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Presentation transcript:

KMCO CAPA System Training QA030

Corrective Action/Preventative Action CAPA SYSTEM Training Objectives KMCO CAPA Procedure-QA030 Responsibilities How to use the New Corrective Action Preventive Action System Quiz

Corrective Action/Preventative Action (CAPA) System A CAPA system is used to address problems in processes. It gives every employee a means to identify areas that need improvement. Starting a CAPA starts an investigation to find the Root Cause of the problem. Once the Root Cause has been identified, it can be corrected to stop the problem from occurring again.

CAPA System The Corrective/Preventive Action System will be the primary tool for the documentation, investigation and disposition of Corrective and Preventive Action, and will describe the steps taken in alleviating present and future non-conformances in products and systems.

Corrective Action/Preventative Action Procedure One of the most important requirements of the ISO 9001:2008 Standard Serves as the Basis of Quality Management System (QMS) Improvement Serves as a tool for Continual Improvement

CAPA-ISO 9001:2008 Requirement ISO 9001:2008 8.5.2 “The organization shall take action to eliminate the cause of nonconformities in order to prevent recurrence.” ISO 9001:2008 8.5.3 “The organization shall determine action to eliminate the causes of potential nonconformities in order to prevent their occurrence.”

KMCO Quality Policy Our Commitment at KMCO is to partner with our employees, our suppliers and our customers to consistently provide products and services that meet or exceed our customers’ requirements, to ship products in a timely manner, and to continually improve the effectiveness of our quality management system through the assurance of conformity to customer requirements.

KMCO Quality Policy KMCO continually improves the effectiveness of it’s Quality Management system through the use of the Corrective Action/Preventive Action (CAPA) process.

RESPONSIBILITY All employees are responsible for recognizing and reporting non-conformances, either existing or potential, within the KMCO Quality System. The CAPA System Administrator is responsible for administration and maintenance of the CAPA System.

CAPA Procedure SCOPE Applies to all areas of the KMCO Quality Program. Includes all departments responsible for compliance to the Quality Manual.

Corrective Action Corrective Action: (non-technical terms): Definition Corrective Action: (non-technical terms): “Action to be taken when a non-conformance occurs and following the existing procedure as written could not have a stopped it.” The procedure – which defines how a system works or how a task is completed – must be corrected.

Preventative Action Preventive Action: (non-technical terms): Definition Preventive Action: (non-technical terms): “Action to be taken when a non-conformance has not occurred but can if this action is not implemented” The procedural change can prevent a non-conformance and is typically a new procedure or a new section within a procedure.

QA030-Corrective Action Inputs may include: Non-conformances resulting from customer or third party audits Findings or non-conformances resulting from internal audits Laboratory Quality Assurance testing results that indicate a problem exits Initiated supplier corrective actions from either KMCO or external sources Customer complaints or suggestions

QA030-Preventative Action Inputs may include: Observations or suggestions arising from Internal or External Audits Observations from periodic review of batch data or lab data Customer Complaint that reveals trends KMCO employee ideas for improvement

Corrective Action Procedure Record the Nonconformity-Write CAPA Administrator appoints Owner for each Corrective Action Determine the Root Cause of the Nonconformity (Manager or Supervisor) Owner will investigate to Identify Root Cause within thirty (30) days Owner will develop an action plan to correct the root cause within ten (10) days of the investigation When Owner and Administrator agree that the Root Cause has been eliminated, The CAPA will be closed out

Preventative Action Procedure Record the Potential Nonconformity-Write CAPA Administrator appoints Owner for each Preventative Action Owner will investigate the suggestion to determine if Preventative Action is need and feasible. Owner will develop an action plan within ten (10) days of the investigation When Owner and Administrator agree that the possible Root Cause has been eliminated, the CAPA will be closed out

QA030-CAPA If a non-conformance requires immediate action to prevent a more serious problem, it must be performed immediately and then recorded in the CAPA system.

KMCO CAPA Timeline

HOW TO CREATE A CAPA

HOW TO VIEW A CAPA

HOW TO MODIFY A CAPA