Reduction in Downtime via Interlocking

Slides:



Advertisements
Similar presentations
B757 Review Questions.
Advertisements

Electrical Systems Chapter 9.
Daikin Altherma™ Troubling Shooting
GE job title/1 GE internal information - Not for external distribution 1 GE Security EMEA NPI template – v1 1X Series (phase 1) Conventional Fire Panel.
Uninterruptible Power Supply (UPS)
Introduction Since the beginning of the oil crises, which remarkably influenced power development programs all over the world, massive technological and.
Reliability of present dc system is high, but could increase if a redundant battery or a redundant battery system were put in parallel with present system.
Team BUSS Backup Storage Source. Team BUSS Idaho Power Company Backup Storage Source Project Title Extra High Voltage (EHV) Station Second DC Storage.
Electrical Fundamentals
Lesson 15: Dc Motor Control Components and Diagrams
Solar Home UPS 850VA & 1400VA India’s first Sine wave inverter with in built Solar Charge Controller and Controlled DC Load Output. Simultaneous Charging.
Freedom Combi Inverter
The First Central Emergency & Standby Lighting System Combining Storage Batteries & Generator Input 1 1.
Overview of the 1.
Lesson 9: Electrical Components
Left Side Equipment Stack with HPA Inverter at bottom. Set the inverter to Mode 2. Right Side Equipment Stack with modems with Inverter at bottom. Set.
POWER PLANT USED IN TELECOM
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
1 Verizon Technology California Public Utilities Commission Rulemaking Backup Power at the Customer Premises Technical Workshop June 5th, 2007.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
ELECTRONIC IDEAS UPS INNOVATIVE ALTERNATE POWER TECHNOLOGY DAWN – ELECTRONIC IDEAS INNOVATIVE ALTERNATE POWER TECHNOLOGY ELECTRONIC IDEAS.
CLIQ unit Integration. General view: -Schroff rack 19’’ 25U (500mm x 600mm x 1120mm). -2 fixed wheels +2 castor wheels with brake ⦰100mm. Capacitors Capacitors.
ADT490 Panel Theory. 2 System Power Supply Grounding ‣ Circuit separates positive / negative from Ground ‣ Ground fault - resistance to ground ≤ 10 kΩ.
SmartMQn Motor Horner APG, LLC September 9, 2008.
ENERGY: PHONE CHARGER Input, Output, Process, Feedback.
A Presentation On 132 KV GSS BEHROR
C-12 ELECTRICAL CW3 RIESE 18 APRIL DC SYSTEM -24V, 34 AMP HOUR NICKEL CAD BATTERY A 30V DC STARTER/GENERATORS -AN EXTERNAL DC POWER SYSTEM.
Installing a servo-stabilizer in Woodland Guest House  A servo-stabilizer installed Woodland Guest House lighting load.  Date: 24 th February 2012 
18240 Element two - Components INPUTS OUTPUTS PURPOSE TYPICAL USE.
Puissant Panel User Training Esc.. 09:11:35 ACTIVE # * 3 6 RESET SYSTEM CLEAR DISPLAY TEST DISPLAY SILENCE BUZZER ESCAPE ENTER SILENCE.
Regenerative braking system
UH-60 IPC/MOI CW2 JAMES THOMAS.
IEA INTERNATIONAL ENERGY AGENCY PHOTOVOLTAIC POWER SYSTEMS PROGRAMME Overview 1.Introduction / Summary 2.PV-diesel hybrid systems 3.Measurement equipment.
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
CGS Ground School Technical The Vigilant Electrical System © Crown Copyright 2012 No Part of this presentation may be reproduced without the permission.
BUILDING LOAD NORMAL OPERATION 1. ATS are in normal position connected to utility source 2. All generator set paralleling circuit breaker open.
© Copyright 2016 OGF - Polling – Breakers, Relays, and Disconnects Components Breakers, Relays, and Disconnects.
Practical Testing Issues Real Life Issues Bob Beavers June 12,
VMCL ELECTRONIC DIVISION.
Less power consumption than running a light bulb.
Uninterruptible Power Supply (UPS)
Presentation On Office security system
Directional control valves
AA/S 4.1 Analogue Actuator AAM/S 4.1 Analogue Actuator Module
Summary Rich Bauer, Senior Reliability Engineer
TURBINE CRANES NEA36 Turbine Crane.
HV Battery Assembly.
NERC Published Lessons Learned Summary
YEARLY MAINTENANCE. CLEANING OF CHARGER.
TPS - Thyristor Power Supply for Resistive/Inductive Loads
Show Video:
Connections Topology of Apollo ACS.
PLC BASED AUTOMATION OF FUEL OIL PUMP HOUSE DRIVES IN TPS-2
Uninterrupted Power Supply
Birla Vishvakarma Mahavidyalaya (Electrical department) Topic:- Laboratory setup for Numerical Protection of transformer Group No. : 17 Sr no. Name Enrolment.
Presented by: LADWP November 14, 2017
FEEDER PROTECTION UNIT
HVI HIPOT TEST SET Pft sERIES.
Universal I/O Concentrator UK/S 32.2
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
The key to comfort and efficiency for heating and air-conditioning
More and more power failures are being experienced through the Republic of South Africa. It is clear that this situation is not improving, nor will it.
Uninterruptible Power Supply
AVIATION 325 ELECTRICAL SYSTEM.
Accelerator PSS Radiation Monitoring
Programmable Logic Controllers (PLCs)
Zener Diode.
Backup Power supply for Electrical substations Overview 01/2012
Presentation transcript:

Reduction in Downtime via Interlocking Date: 3rd March 2012 A tripping occurred since the Areva panels had a tripping command system if the DC supply failed. This was removed by removing that function from the panel and a alarm using a contractor with a reset operation was made For future purposes a downtime of 60 minutes was avoided.

How did the failure happen? DC Input to the battery charger failed The auxiliary to the Panels was now supplied by Battery storage No DC failure sign was indicated The Charge at Battery tank finished after sometime There was now no DC supply to the panels The Master relay of Areva Panels Tripped since the battery voltage was reduced Incomer no. 3 and Unit 5 (south) tripped Load now concentrated only on Dhaula Bus coupler Tripped due to interlocking to avoid overloading of Dhaula power There was no supply to Unit 1, 2, 5 (south) and Gyaanpeeth While Unit 3, Unit 4 and Unit-5(North) operated normally on Dhaula How did the failure happen?

SLD of the Hooter Circuit K1 MCB Output K1 (N.C.) K2 (N.C.) e f e1 f1 Fed by UPS Power Hooter K2 (N.O.) K1 (N.C.) a1 b1 g h Push Button (N.O) Fed by UPS Power K2

Savings Calculations Now if the DC fails the Hooter will show the fault. There is also a ‘Reset Button’ to accept the fault and bring it back to normal condition. This is not a one time saving it is applicable for the future also. Load loss per hour 70,000 INR Breakdown on transmission line will create breakdown for hours: 60 minutes   Total savings 70,000.00 Now Downtime of Unit 1, 2, 5 and Gyaanpeeth from DC failure can be avoided. Hooter would run and action can be taken in time. *This is not a one time saving. For future there will be no downtime due to this reason.