Advanced systems for prevention & early detection of forest fires (ASPires) KICK OFF MEETING Call for proposals for prevention and preparedness project.

Slides:



Advertisements
Similar presentations
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions ECHO. C4 – Civil protection prevention and preparedness 2010 Kick off meeting – Brussels.
Advertisements

Gesundheits- und Soziale Dienste Charlotte Strümpel PrepAGE – Enhancing disaster management and preparedness for the older population in the EU Kick-off.
PROFORCE Bridging of Probabilistic Forecasts and Civil Protection Yong Wang, Clemens Wastl, Franziska Strauss (ZAMG)
Re silience of C ritical I nfrastructure P rotection in E urope (RECIPE) PhD Robert Mikac, RECIPE Project Manager Head of Sector for Civil Protection,
Networking with Southeast Europe SEE-ERA.NET Pilot Joint Call for Research Proposals Southeast European Era-Net.
FROM GAPS TO CAPS Risk Management Capability on Gaps Identification in the BSR Neringa Brogaitė-Karvelienė Fire and Rescue Department under MoI of Lithuania.
Enhancing Volunteer Awareness and education against Natural Disasters through E-learning (EVANDE) Dr C. Fassoulas, Project Coordinator Natural History.
An Integrated Methodological framework for Emergency Logistics - MELOGIC Dr Georgios Boustras Associate Professor in Risk Assessment Dean of the Ioannis.
Action of Contrast to Contrast to Hydraulic Hydraulic Emergency in Emergency in LOcal LOcal Urban Urban Site SiteACHELOUS.
MATILDA Project Bruxelles, 20 January 2015 Kick off meeting for the selected projects under the 2014 Call for proposals for prevention and preparedness.
ALPINE SEARCH AND RESCUE FOR SLOVENIA AND ITALY. ALPSAR IN SHORT  Budget: € ,00  EC Contribution: € ,25 (75%)  Duration: 24 Months 
Enterprise Directorate General European Commission Regional Innovation Strategies in Associated States in Associated States Dr. Michael Busch DG ENTERPRISE.
SEE-ERA.NET Initiatives Pilot Joint Call for Research Proposals IGLO Open Session, Southeast European Era-Net Florian Gruber, Dissemination and.
Multilateral Project for Transfer of Innovation Project Duration: 24 months Partners’ Kick-off Meeting, November 2009, Sofia Tanya Pancheva/University.
FINAL FORUM of the Project „through pREvention to Preserve the natural beauty Of the Rhodope mounTain” REPORT Smolyan, ΕΛΛΗΝΙΚΗ ΔΗΜΟΚΡΑΤΙΑ ΠΕΡΙΦΕΡΕΙΑ.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
Rome, 15 May hrs 4th ODS3F Progress Meeting, 15 May 2014, Rome ODS3F project overview Giovanni Laneve DIAEE – Università di Roma ‘La.
Disaster Preparedness and Prevention Initiative for South Eastern Europe DPPI SEE Seminar on Strengthening Cooperation with Candidate Countries and Western.
E-PreS: Monitoring and Evaluation of Natural Hazard Preparedness at School Environments Stathes Hadjiefthymiades National Kapodistrian University of Athens.
E-Learning: Fight Against Oil Spills Kick off meeting Brussels 22 january 2014 Call for proposals for prevention and preparedness projects.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
RECALL Resilient European Communities Against Local Landslides KICK OFF MEETING Projects selected under the 2014 Call for Proposals for Prevention & Preparedness.
RISK AWARE TITLE : RISK – Advanced Weather forecast system to Advise on Risk Events and management ACRONYM : RISK AWARE Duration: 36 months Status: Running.
Application number: 2(4.i) MIS-ETC Code: 774 EMERSYS Toward an integrated, joint cross-border detection system and harmonized rapid responses procedures.
European policy perspectives on social experimentation Antoine SAINT-DENIS and Szilvia KALMAN, European Commission - DG Employment, social affairs and.
1 Joint Research Centre (JRC) Annual Meeting of the EGTC Platform The EGTC-ready to use - Beyond cohesion policy Ulla Engelmann Interinstitutional and.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
SEARCH AND RESCUE IN CASE OF FLOODS. SEARCH AND RESCUE IN CASE OF CATASTROPHS.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Operational tools for improving efficiency in wildfire risk reduction in EU landscapes (FIREfficient) CIVIL PROTECTION FINANCIAL INSTRUMENTS 2013 CALL.
Improvements of Shorelines Defences Against Marine Pollution ISDAMP+ project 2012/PREP/17 Frédéric MUTTIN (EIGSI La Rochelle) Kick-off meeting selected.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Information Society Technologies in the 6th Framework Programme Information Society Technologies in the 6th Framework Programme IST Call 6 January 2006.
Crop monitoring as an E-agriculture tool in developing countries (E-AGRI) Summary of the second Periodic Review FP7 STREP Project (GA ) Final Meeting.
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
Community for Risk Management & Assessment Kick-off January 20 th Brussels N. van Os Veiligheids Regio Zuid-Holland Zuid (Safety Region South-Holland South)
WP7Joint and sustainable transport in health and care Action plan for the period July-December Dr Snežana Manić AdriHealthMob, Steering Committee.
National Protection and Rescue Directarate EU PROMETHEUS 2014 KICK OFF MEETING 9-10 April, Brussels.
20 September 2006, SofiaARC FUND, Bulgaria1 Related Ministry: The energy sector is connected to the Ministry of economics and energy – and State.
Federal Ministry for the Environment, Nature Conservation and Nuclear Safety, Germany Environment Agency (UBA), Germany Federal Agency for Nature Conservation.
Public Administration Capacity Building
Kick-off meeting DG ECHO 20 January 2015, Brussels
Dr. Stelios Panagiotou, Dr. Stelios C.A. Thomopoulos
Crisis management related research at
Duration of the project: 01/04/2016 – 30/09/2017
MEFISTO Mediterranean Forest Fire Fighting Training Standardisation
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
Climate Change & Environmental Risks Unit Research Directorate General
SPI activity ( ) – Final phase (Avril to June 2012)
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
Project Results New Projects
project results and conclusions
Common Standard Operational Procedures for the Union Civil Protection Mechanism Modules and Teams (UCPM SOPs) – UCPM SOPs – UCPM-2017-PP-AG This.
Dr. Stelios Panagiotou, Dr. Stelios C.A. Thomopoulos
Project Activities – State of the Art
Risk Management Capability on Gaps Identification in the BSR
Strengthening Early Warning Systems in Europe
Inclusive Disaster Resilience Index (INDRIX)
EuropeAid F3 Roberto Ridolfi, Head of Unit F3
DIRECT – DIsaster REsilient Communities and Towns
MERCI - Multi-site Events Response and Coordinated Intervention
DG AGRI, Unit F6 Bioenergy, biomass, forestry and climatic changes
European policy perspectives on social experimentation
IONAS Project Next Steps Andrea Del Mercato, City of Venice, 2nd IONAS project Mtg. Brindisi January 2005.
SWIFTERS: Safe and Rapid Evacuation Facilitated by UAV Swarms
iCoast integrated Coastal Alert System Kick off meeting
Background CRiteria for the IDentification of Groundwater thrEsholds: BRIDGE Co-ordinator: BRGM (Fr) Groundwater Characterisation workshop, 25 June 2004.
PACES Preparedness for Appropriate accommodation in Emergency Shelters
EUROPEAN CIVIL PROTECTION Preview of the meeting on
Presentation transcript:

Advanced systems for prevention & early detection of forest fires (ASPires) KICK OFF MEETING Call for proposals for prevention and preparedness project 2016 Brussels, 18 January 2017 ECHO/SUB/2016/742906/PREV03 Coordinator: Prof. Dr. Rumen Stainov, Fulda University of Applied Sciences (DE) 9/19/2018

Partners Fulda University of Applied Sciences (DE) Military Academy Skopje (MK) Comicon Ltd (BG) InterConsult Bulgaria Ltd (BG) Cluster NCITES (BG) 9/19/2018

End Users FYR of Macedonia: Bulgaria: Ministry of Environment and Physical planning Ministry of Agriculture, Forestry and Water Crisis Management Center National Park Mavrovo and National Park Pelister Bulgaria: Fire Safety and Civil Protection Directorate, Ministry of Interior Germany: Bundesministerium des Innern 9/19/2018

Costs Total eligible cost € 829.523,00 EC co-financing € 622.142,00 Duration: two years WEB Page: www.ASPires.eu 9/19/2018

Early detection of Forest fires Area of activity Early detection of Forest fires    Priority Our system will help all Crisis Management Information Systems in Europe to develop and to implement different methodologies for initial stage warning, localization and organization of the firefighting teams and tactics to suppress the disaster. 9/19/2018

Summary Early detection systems of forest fires that integrates sensor networks and mobile (drone) technologies for data collection and acquisition of those data at existing Crisis Management Information Systems (CMIS). The mobile (drone) technologies will allow covering much larger areas in order to raise the percentage of forest fires detections in area of particular importance, to monitor area with high fire weather index, and to monitor areas already affected by forest fires. Although initially implemented in our test bed in fYR of Macedonia and in our end-users, e.g. Bulgarian Ministry of Interior, our system will be open to all European countries. 9/19/2018

Deliverables and deadlines A. MANAGEMENT AND REPORTING TO THE COMMISSION, M1 - M24 A.1. Management and Coordination A.2. Financial Management A.3. Evaluation and feedbacks B. PUBLICITY, M1 - M24 B.1. Preparation of publicity material, establishing a web-site B.2. Dissemination events and workshops B.3. Advocating and Networking - at both bilateral and regional levels 9/19/2018

Deliverables and deadlines C. SYSTEM DEFINITION, M1 - M20 C.1. Conduct comparative analysis with other models of information systems for detection and monitoring forest fires C.2. Conduct comparative analyzes of occurred forest fires in fYR of Macedonia in period of 2006-2015 C.3. System design of advanced systems for prevention and early detection of forest fires C.4. Research of existing interfaces for forest fires (prediction and behaviour) C.5. MOCK-UP development for existing MKFFIS C.6. Creating data-bases, needed to support the upgraded and extended MKFIS C.7. Specification and experimental prototype development of the gateway using standard interfaces C.8. Networks and data model simulation 9/19/2018

Deliverables and deadlines D. COMMUNICATION PROTOCOLS AND INTERFACES BETWEEN DIFFERENT ACTORS OF THE CRISIS MANAGEMENT SYSTEM, M6 – M18 D.1. Analysis and description of proper standards for communication with the goal of overcoming the challenges of dependence of the information systems on known and already used technology and creating and partially implementing an information system, based on Structure-oriented Architecture D.2. Creating communication protocols between the users that form the Crisis Management System D.3. Definition of standard interfaces and protocols at sensor network and cloud level E. SYSTEM IMPLEMENTATION AND INTEGRATION, M9 – M21 E.1. Algorithms development and connecting market available sensors for detecting forest fires. E.2 Model selection for transferring data to a central database. E.3 Data-bases experimentally development for supporting the upgraded and extended MKFIS E.4. Installing set of cameras detectors and mobile device (like drone) available on the market with a large optical range of monitoring forest fires in areas of particular importance and transfer data to a central database of existing MKFFS E.5 Conceptual implementation and partial proof of man-machine platform integration (connecting API and machine learning algorithms) 9/19/2018

Deliverables and deadlines F. SYSTEM TESTING, VERFICATION AND VALIDATION, M10-M23 F.1. Testing, of the system through simulation. F.2. Verification and validation of the system through simulation F.3. Perform research and measurements to see the degree of efficiency, effectiveness of cameras detectors and mobile device (like drone) in detecting and monitoring of forest fires in areas of particular importance and transfer data to a central database of existing MKFFS G. OPERATIVE USE OF UPGRADED AND EXTENDED CMIS, M15-M24 G.1. Connecting the system with the existing systems used in the Crisis Management System and the EU CIWIN (Critical Infrastructure Warning Information Network. G.2. Familiarization of end users with system G.3. Trial Period (Putting part of the system in operative use) 9/19/2018

Tentative dates Start Date 1 May 2017 End Date 30 April 2019 Kick off meeting Sofia March 2017 Virtual steering committee May 2017, September 2017, January 2018, March 2018, June 2018, November 2018 Reporting Periods Months 1-8, Months 9 – 16 Final Peport for Months 1-24 Workshop with final beneficiaries and partners Skopje, September 2018 Final conference Brussels, April 2019 9/19/2018