North America Off Highway Adolfo Gomez December 9th, 2014

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

EPA 2010/ GHG14 EMMISIONS Created for: APMA By: Scott Fast.
Software Configuration Management
© 2008 QUALCOMM Incorporated. External presentation to (audience), prepared by QUALCOMM’s (presenters name) – Month Day, 2008 Hours of Service Driver Training.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Hands-On Microsoft Windows Server 2003 Administration Chapter 2 Managing Windows Server 2003 Hardware and Software.
7.09 Features Detroit, Sept Department
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
Chapter 6 SYSTEMS DEVELOPMENT Phases, Tools, and Techniques.
Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
Project Execution Methodology
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
LubeWatch® Oil Analysis Program
Introduction to the Change Process
Software Configuration Management
Training Documentation – Replacing GSPR with RFQ 2.0
Project Objectives Publish to a remote server
Standard Operating Procedure
Approaches to ---Testing Software
Data-Basics Training & Support
2011 Prioritization Update to Market Subcommittees
Please review these important Webinar Etiquette guidelines
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
ILab Accounts If you have not done so already, you must register for an iLab account to use any iLab-controlled instruments and equipment To create an.
Software Requirements
SIP Report – Nov 2017 Overview Headlines Workstream report
Hot Checkout System for LERF Resuscitation
Advisor 6 Overview & China Rollout Status
SCR Coolant Circuit Flow Test
PowerMatch T4F New Features AE Training
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
IQA Improvement Work.
Application Engineering Role
DAE Monthly Meeting North America Off Highway
Off-Highway Diagnostic Improvement Project
Application Engineering Role
Off-Highway Diagnostic Improvement Project
Unit4 Customer Portal Submitting & Managing Cases.
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Amendment Invoice Task Force Progress Report
SSI Toolbox Status Workbook Overview
IS&T Project Reviews September 9, 2004.
Systems analysis and design, 6th edition Dennis, wixom, and roth
Low DEF Level Programmable Parameter Changes
Yearly Maintenance Process (for existing messages)
2017 B Software Release.
Systems analysis and design, 6th edition Dennis, wixom, and roth
Off-Highway Diagnostic Improvement Project
Digital Chart Recorder Operation
Amendment Invoice Task Force Progress Report
Diesel Particulate Filters
Amendment Invoice Task Force Progress Report
Exit Capacity Substitution and Revision
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
Proposals from the Informal Working Group on AEBS
Key Value Indicators (KVIs)
Project Name - Testing Iteration 1 UAT Kick-off
Amendment Invoice Task Force Progress Report
Managing Multi-source Feedback
Quality Control & Assurance
Amendment Invoice Task Force Progress Report
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Executive Project Kickoff
CFR Enhancement Session
Presentation transcript:

North America Off Highway Adolfo Gomez December 9th, 2014 DAE Monthly Meeting North America Off Highway Adolfo Gomez December 9th, 2014

Agenda Virtual Panel Review Process- Adolfo (2min) Remote Lube Filter Hoses, Distributor support – Adolfo (5 min) Off-Highway Diagnostic Improvement Project – Scott Decker (40 min) Questions 9/20/2018 Cummins Confidential

Virtual Panel Review Process- 9/20/2018 Cummins Confidential

Lotus Notes Database: Not Longer used to submit IQAs for Panel Review 9/20/2018 Cummins Confidential

Issues Log added to CARS’ IQA record Virtual Panel Review through CARS from Dec 1st, 2014 Issues Log added to CARS’ IQA record Issues Log tab functionality is enabled once an IQA is assigned to an auditor

Panel Review Member provides comments Keep comments within the comment’s box brief for format purposes. A pop up appears when reviewer clicks on Provide Comments

Author responds to Panel Review Member and Auditor’s comment

Auditor updates Issue Coding and add Comments to each Issue Log item.

Close Panel Review The IQA Auditor controls when the panel is closed. Once auditor closes panel review, reviewers will not be able to provide new comments. Panel reviews will normally be closed within 10 business days. Remove image of “close review”

Remote Lube Filter Hoses Distributor support Remote Lube Filter Hoses 9/20/2018 Cummins Confidential

QSB4.5 & QSB6.7 T3/T4F Remote Lube Filter - Hoses The Problem The factory believes some OEM are selecting Remote Lube filter hoses (options) and then discarding and replacing them with customer supplied ones? The Solution To release a new option Remote Lube filter option with no hoses allowing the customer to provide their own. The challenge To Justify a new option we need to show VOLUME.

QSB4.5 & QSB6.7 T3/T4F Remote Lube Filter - Hoses The support we need What OEM’s are replacing the supplied hoses that come with remote lube filter option LF9135, with their own hoses? Customer Code? What is the volume of engines for those OEM’s?

Off-Highway Diagnostic Improvement Project Scott Decker December 9th, 2014 Cummins Confidential

Agenda Background of the Diagnostic Improvement Project Major Classifications for Changes OEM / Customer Impact Overview Improvement Schedule Cummins Confidential

Diagnostic Improvement Group (DIG team) Group of “experts” assembled to review all the fault codes across the off-highway HMLD product line (QSF2.8 through QSX15) and determine if we are taking the appropriate level of lamp activity, torque/speed derate, and proper tuning level based on the various architectures used across the off-highway product line. Cummins Confidential

Motivation: Why do this? Cummins losing HD truck share in North America 5% market share loss in last 2 months  $50M PBIT Customer Feedback ISX15 has too many lamps & derates in comparison to competition  Drives downtime Our product is borderline intolerable  Need major improvement (>70%) Some Customers are getting out of 2010 ISX15 powered equipment (USX) earlier than normal trade cycle Customers consider Cummins “Lamp Happy” “Know ISX15 is running – Yellow Lamp is on” Evidence this is happening in all markets Cummins Confidential

VOC – VPI -- Lamps & Derates Customer Pain Analysis Lamp data turned on Lamp every 2 days for every vehicle Lamp every 1-2 days for every vehicle Lamp every 3-4 days for every vehicle Lamp every day for every vehicle

Diagnostic Improvement Group (DIG) Team Deliverables Objective: Re-design diagnostics to provide meaningful operator communication of needed repair action Maximize customer uptime Drive appropriate customer response Ensures correct repair action Meets legislative requirements Project Scope: In Scope: Lamp strategy, accommodations / derates, diagnostic & tuning, interpretation of regulations Out of Scope: Hardware degradation leading to faults or natural derates and Hardware improvements  Hopper of ideas Cummins Confidential

Summary of the Fault Codes Covered by the Off-Highway DIG team Each recommendation was evaluated for how long to implement Reviewed all 700+ fault codes Cummins Confidential

Summary of Diagnostic Recommendations Cummins Confidential

Major Classifications of Changes Lamp Changes Accommodation Changes Tuning Changes DEF Lamp Changes Cummins Confidential

Lamp Changes - Definitions Red – Need to stop work immediately Yellow – Run to the end of the shift Maintenance – Operator can perform some action without special tools to fix the issue No Lamp – Fault is used for problem identification and fault isolation by the technician Cummins Confidential

Lamp Definition Strategy Amber Warning Lamp: Equipment can be used to the end of shift. Arrange service. Red Warning Lamp: Stop equipment now Flashing AWL: Operator able maintenance Operator can perform some action without special tools to fix the issue Flashing DEF Lamp Solid: DEF tank level is low or DEF quality is low or DEF/SCR system related malfunction occurred. Leads to 25%, 50% torque derates Flashing DEF lamp: Final Inducement after 30 minutes lock to idle or shutdown for Off-Highway) Cummins Confidential

Lamp Changes Possible OEM Impact Change the definition of what lamp to turn on when the ECM detects an issue. Amber Warning Lamp (AWL) to No Lamp Amber Warning Lamp (AWL) to Maintenance Lamp Red Lamp to Amber Warning Lamp These changes will cause a new fault code number to be used (but maybe the same SPN/FMI) Lamp, J1939 SPN/FMI make up a unique CMI fault code Cummins Confidential

Lamp Changes When a fault is moved to a no lamp condition, the fault’s SPN/FMI no longer shows up in the DM1 message on J1939. The fault is still recorded in the ECM and is available upon request via the DM53 message on J1939 So the fault code is still available for servicing events but does not interrupt the operator. It is still available on the J1939 datalink but under a different message (DM53). Cummins Confidential

Accommodation Change Unlikely OEM Impact Definition: Accommodation means the ECM turns off the EGR or SCR or both. Turning off EGR or SCR means the engine will go to a 25% derate. Cummins Confidential

Accommodation Change Unlikely OEM Impact Minimizing the number of diagnostics that force the system into an accommodation is a reduction in customer pain because the customer is not put into derate as often. Insert Data Classification

Tampering Improvement OEM Impact Moving a Fault Diagnostic out of the tampering list means the engine does not get locked on idle or shutdown. In the future, diagnostics will be re-written to improve the distinction between actual potential tampering and unintentional failures. Cummins Confidential

Industrial Tier4 Final -Tampering/Malfunction Inducement Strategy Off-Highway, Tampering Inducement - Current AECD #13-4 Industrial Tier4 Final -Tampering/Malfunction Inducement Strategy Inducement None Warning1 Warning2 1 Initial2 Secondary2 Final2 X1 hrs X2 hrs X3 hrs X4 hrs Red Stop On FC 3712 Amber Warning Off Solid FC for failure leading to Tampering/Malfunction FC 3714 FC 3714 4 hours 3x30mins override allowed Engine Start Detected FC = Fault Code Notes 1 The signal can be used for visual or audible alarm by OEM 2 Derate is ramped in 5 minutes. *Warning/FC will be turned on at least 2 minutes before the inducement Cummins Confidential

Industrial Tier4 Final -Tampering/Malfunction Inducement Strategy Off-Highway, Tampering Inducement - Proposed AECD #13-4 Industrial Tier4 Final -Tampering/Malfunction Inducement Strategy Inducement None Warning1 Warning2 1 Initial2 Secondary2 Final2 X1 hrs X2 hrs X3 hrs X4 hrs Red Stop On FC 3712 Amber Warning Off Solid FC for failure leading to Tampering/Malfunction FC 3714 FC 3714 4 hours 3x30mins override allowed DEF Lamp Off Solid Flashing Engine Start Detected FC = Fault Code Notes 1 The signal can be used for visual or audible alarm by OEM 2 Derate is ramped in 5 minutes. *Warning/FC will be turned on at least 2 minutes before the inducement Cummins Confidential

Disable Diagnostic 29 Diagnostics were recommended to be turned off. No OEM Impact 29 Diagnostics were recommended to be turned off. These were most often diagnostics required for OBD products that we inherited from the on-highway programs but are not required for off-highway. Less faults… less possibility of false indications which lead to stopped work. Cummins Confidential

Tuning Changes No OEM Impact This would include actions to make sure the fault is real before indicating we have an issue. We may take more time to determine that a system or component is truly in error. Less false faults Cummins Confidential

DEF Lamp Changes DEF Tank Level Likely OEM Impact DEF Tank Level Explain how this may or may not impact the customer Cummins Confidential

Low DEF Warning and Inducement 10% reserve not shown on gauge Off-Highway, Tank Level Inducement - Current DEF (Urea) Gauge Notification* Inducement Deactivate Warning or 10% reserve not shown on gauge Lamp Fault >10% full None Stage 1 Minimum 10% full DEF lamp solid FC 3497 Fill DEF tank to a minimum of 2.5% above stage 1 Stage 2 Minimum 5% full DEF lamp flashing FC 3498 Fill DEF tank to a minimum of 2.5% above stage 2 Stage 3 From minimum of 2.5% to before tank is empty Amber warning lamp solid FC 1673 and 3714 / 4863 (optional) 25% torque derate and optional speed derate Fill DEF tank to a minimum of 2.5% above stage 3 Stage 4 0% FC3547 and 3714 / 4863 (optional) 50% torque derate and optional speed derate Fill DEF tank to a minimum of 2.5% above 2% level and system is able to prime Stage 5 Stage 4 detection + 30 mins Red lamp solid FC 3547 and FC 3712 Final inducement Fill DEF tank to a minimum of 2.5% above stage 4 and system is able to prime Do we need to include SPN 5246 which tells the inducement level

Low DEF Warning and Inducement 10% reserve not shown on gauge Off-Highway, Tank Level Inducement - Proposed DEF (Urea) Gauge Notification* Inducement Deactivate Warning or 10% reserve not shown on gauge Lamp Fault >10% full None Stage 1 Minimum 10% full DEF lamp solid Maintenance FC 3497 Fill DEF tank to a minimum of 2.5% above stage 1 Stage 3 From minimum of 2.5% to before tank is empty Amber warning lamp solid FC 3498 and 3714 / 4863 (optional) 25% torque derate and optional speed derate Fill DEF tank to a minimum of 2.5% above stage 3 Stage 4 0% DEF lamp flashing FC1673, FC3547 and 3714 / 4863 (optional) 50% torque derate and optional speed derate Fill DEF tank to a minimum of 2.5% above 2% level and system is able to prime Stage 5 Stage 4 detection + 30 mins Red lamp solid FC 3547 and FC 3712 Final inducement Fill DEF tank to a minimum of 2.5% above stage 4 and system is able to prime Do we need to include SPN 5246 which tells the inducement level

Industrial Tier4 Final –DEF Quality Inducement Strategy Off-Highway, Quality Inducement - Proposed AECD #13-4 Industrial Tier4 Final –DEF Quality Inducement Strategy Inducement None Warning1 Warning2 1 Initial2 Initial3 Secondary2 Secondary3 Final2 Final3 X1 hrs X2 hrs X3 hrs X4 hrs Red Stop On FC 3712 Amber Warning Off Solid FC 3714 FC 3714 4 hours FC for poor DEF Quality Maintenance Lamp 3x30mins override allowed DEF Lamp Off Solid Flashing Engine Start Detected FC = Fault Code Notes 1 The signal can be used for visual or audible alarm by OEM 2 Derate is ramped in 5 minutes. *Warning/FC will be turned on at least 2 minutes before the inducement Cummins Confidential

Inducement Strategy Summary Off-Highway Cummins Confidential

Proposed roll out strategy New DOs will be created which will have the new software / tuning / improvements. This allows AEs to work with their customers on roll out plans Recommend OEMs have new PN to help manage integration. Cummins Confidential

Task or Milestone Definition Item Target End Date ## Task or Milestone Definition D   Nov. 7 Create Initial communication package for the Application Engineering Community 1 Dec.20 Initial communication of upcoming change to World Wide Application Engineering Community 2 Jan. 30 Create Detailed Communication of Actual Changes and Schedule of Availability 3 Feb. 28 Communicate Detailed Changes to the World Wide Application Engineering Community 4 Mar. 15 OEM Communications 5 OEM Impact Assessment 6 Mar. 31 Create CEAF 7 Apr. 10 Publish CEAF to World Wide Application Engineering Community 8 Apr. 15 OEM Planning 9 Apr. 30 Update Test Plans in AEB 27.10 10 Update other AEBs (15.151, 15.153, etc…) 11 Declare when OEM test calibration is required to support change 12 May. 15 Test Calibrations Available to Support OEM Verification 13 Jul. 10 Interface Modification Verification 14 Jun. 30 OEM Change Request Submission 15 New OEM Part Numbers Assigned 16 Jul.10 OEM Change Request Approvals 17 Engine Specification Change 18 Jul. 30 Auditor Communications 19 1-Sep Ready to Support the Customer's Launch Cummins Confidential

Questions 9/20/2018 Cummins Confidential