Environmental Cleanup Program Status

Slides:



Advertisements
Similar presentations
Former NAS Moffett Field
Advertisements

Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
By Chris Ford and James Hughes ( ) ( )
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
J-Field Edgewood Aberdeen Proving Ground. Description From 1940 to 1970s, the Army disposed of chemical agents, high explosives and chemical wastes. APG.
MPCA Citizens’ Board Information Item February 25, 2014.
Rhode Island Society of Environmental Professionals in conjunction with the Rhode Island Department of Environmental Management Co-hosted by SAME’s Narragansett.
BoRit Superfund Site Timeline
1 Fort Monroe: An Update on the Environmental Cleanup VDEQ Presentation to the Fort Monroe Federal Area Development Authority March 19, 2009.
Allegany Ballistics Laboratory (ABL)
Melinda Brunner DEC Contaminated Sites Program 20 th Annual Alaska Tribal Conference on Environmental Management Anchorage, Alaska October 30, 2014.
Public Draft Removal Action Workplan Proposed Richmond Bay Campus Site RES Area and Groundwater Public Meeting December 5, © keh.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
Bob Mashburn Army Regional Environmental Office Atlanta, Georgia ARMY CLEANUP PROGRAM – Status Update –
California EPA Dept. of Toxic Substances Control Brownfields & Environmental Restoration Program Sam V. Martinez, Jr.
WWII Navy Bomb Disposal School , on AU campus for research & education CIVIL WAR Ft. Gaines & other forts located near SV area during Civil War.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Air Sparging at Fort Greely, Alaska Presented by Aung Syn & James Powell.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Former Landfill Environmental Management Plan Update May 8, 2012.
Rhode Island Department of Environmental Management
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
NYS Department of Environmental Conservation NYSDEC Public Meeting September 12, 2013 Brooklyn Navy Yard, Building 92 Former Kent Avenue Site 500 Kent.
Jhon Carilli Low-Level Radioactive Waste (LLW) Activity Lead
Presentation to the Restoration Advisory Board Plan for Site Investigation: Munitions Response Program (MRP) Site 1 Carr Point Shooting Range March 18,
US Army Garrison Picatinny Arsenal Agenda for 11 June 2014 Picatinny Arsenal Restoration Advisory Board Attendance, Introductions & Correspondence Old.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.
Typical Design of a Production or Monitoring Well.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
ENVIRONMENTAL ODDITIES From Here to There, and There to Here… PESTICIDES CAN BE FOUND ANYWHERE! Prepared By: Jeffrey Sotek, PE, CSP, CIH
Gas Bar Decommissioning Project. OUTLINE o Background o Project Status o Cost to CANEX o Active Sites o Conclusion.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
UC Berkeley Richmond Field Station Remediation and Restoration Project January 16, 2008 Town Hall Meeting Agenda 1.Project Background 2.Recent Activities.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
By Mitch Cooper & Haley Herbert January 1987 Vertac site manufactured herbicides 1978 National Dioxin Survey 1983 Site placed on the National.
Name/Office Symbol/(703) XXX-XXX (DSN XXX) / addressDate-Time-Group 19 September 2008 Fort Monroe Closure Environmental Planning.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Progress in EM’s Footprint Reduction for the Oakland Projects Office Projects Rich Schassburger November 16, 2010.
Tulsa Fuel & Manufacturing Superfund Site Remedial Design and Cleanup Plans September 2014.
LTP and FSS Plan Project Status Overview Presented by Bill Barley September 28, 2015.
Division of Waste Management Dexter R. Matthews, Director Mission: to prevent harmful releases of waste to the environment and clean up existing contamination.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
Remediation and Redevelopment at the Former Fort Devens, Massachusetts.
Proposed Plan for No Further Action
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
Environmental Cleanup Program Status
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Environmental Cleanup Program Status
DLA Strategic Materials: ESOHMS Management Review FY17
ASSESSMENT OF CORRECTIVE MEASURES PUBLIC MEETING
Chemical Metals Industries, Inc. (CMI)
Agenda for 24 OCT 2013 Picatinny Arsenal Restoration Advisory Board
Attendance, Introductions & Correspondence Old Business
Georgia Update Jeff Cown Land Protection Branch
ESCA Remediation Program Update
Advanced Environmental Management (AEM) Training Phase I
UNC Superfund Research Program
Brownfield Corrective Action with Revised RRS
Chemical Metals Industries, Inc. (CMI)
Board of Public Utilities August 17, 2017
Presentation transcript:

Environmental Cleanup Program Status Glen Shonkwiler U. S Army Space and Missile Defense Command Environmental Division 19 March 2008 Fort Greely Restoration Advisory Board

FGA Installation Restoration and Compliance Cleanup Programs Reports/Workplans Following Reports now on RAB website http://www.smdcen.us/rabfga/pages/documents.asp: Draft Proposed Plan for the Closeout of 9 IRP Sites Draft 2007 Groundwater Monitoring Report Final 2006 Remedial Investigation Report Final 2005 Remedial Investigation Report Final Miscarriage Investigation follow-up report (on health investigations page) Following Reports to be on the RAB website soon: 2006 SM-1A Surveillance Monitoring Report (promised to be submitted by end of March by US Army Corps of Engineers Jarvis Creek Geophysical Survey Report Interim South Tank Farm Biotreatment Letter Report

FGA Installation Restoration Program 2007 Fieldwork Completed Approximately 12,000 CY of petroleum contaminated soil excavated and bioremediated at the South Tank Farm Treatment Confirmation samples taken in October show some soil still significantly above cleanup levels Treatment Area will be tilled in Spring to promote aeration and confirmation samples retaken. Work included receiving approximately 800 CY of petroleum contaminated soil from the North Delta Tank Farm cleanup Completed June/Sept groundwater monitoring. Results indicate some deep aquifer contamination (ethylene dibromide – leaded gasoline additive) at the South Tank Farm. Other results consistent with previous sampling.

FGA Installation Restoration Program 2007 Fieldwork Completed (continued) Completed field activities at: proposed future old post fire station site (elevated DRO found in soils from former Bldg 144 UST) Bldg 614 Gas Station (tanks confirmed removed, no contamination discovered) Tar & Asphalt Disposal Area (minor solvent contaminants in samples pulled from under the disposal area) Jarvis Creek Munitions Burial Area (geophysical inconclusive) Old Post MOGAS Fuel Line (several locations of elevated DRO in soils identified) Former Airfield Underground Tank Farm BRAC Site 29 (confirmed tanks removed and no contamination found) Building 350 – records search/field visit confirmed dry well/septic system removed. No record of or signs of spills from AST) Bldg 110 Airfield Underground Tank Farm – confirmed elevated DRO remains in subsurface soil Cold Regions Test Center Modular Building (BRAC 75) – no evidence of contamination found

FGA Installation Restoration Program 2008 Investigation/Remediation Plans At the South Tank Farm, install two downgradient monitoring wells to determine the extent of ethylene dibromide contamination. Perform additional investigation work to help determine the extent of deep contamination at the South Tank Farm. Complete the bioremediation project. Sample groundwater monitoring wells across Fort Greely (Spring/Fall) Design remediation system for subsurface petroleum contamination at the BRAC 94 Old Post UST Farm/MOGAS Fuel line Install two additional groundwater monitoring wells in Old Post Area – one to determine if TCE contaminants are sinking deeper and one to try to determine source of benzene in MW-5 Release Proposed Plan for Public Comment Perform investigations at Bldg 675 Former Laundry to address ADEC concerns with former tank vault.

Installation Restoration Program Proposed Plan Proposes closeout activities for 9 additional sites (73 of 132 sites closed in 2005 Decision Document) Sites include: BRAC Site 31 (Former Landfill #1) BRAC Site 32 (Former Landfill #2) BRAC Site 48 (Waste Accumulation Area at Building 626) BRAC Site 88 (Former Landfills #4 and #5) BRAC Site 89 (Refuse Burn Pit) BRAC Sites 90, 132, and Station 21+25 (SM-1A Nuclear Reactor Wastewater Pipeline, Removal Action Laydown Yard and Dilution Well) BRAC Site 103 (Former Laundry Facility at Former Building 157) Actions at most of the sites are Dig Restrictions, Land Use Controls, and Five Year Reviews Refuse Burn Pit has a proposed excavation with off-site disposal of highest lead contaminated soil. Remaining lead contamination at the refuse burn pit would be capped with asphalt Proposed Plan on the website for RAB member review and will be released for public comment in the next couple of months

PROPOSED PLAN SITES

Military Munitions Response Program (MMRP) The Army Environmental Center (Aberdeen, MD) and the US Army Corps of Engineers (Sacramento, CA) began an MMRP Site Investigation (SI) at Fort Greely in 2006. SI Report posted on RAB website Further action recommended on Site 112 Former Scrap Yard Boundary Line issued resolved, addendum to add Jarvis Creek Munitions Burial Area as a “further action recommended” site being developed. Next phase completion date will be dependent on prioritization of nation-wide Army MMRP sites

SM-1A Nuclear Reactor Characterization US Army Corps of Engineers has not secured funds to complete the All-Hazards Assessment (characterization study of any remaining radioactive contamination from the operation of the SM-1A nuclear reactor). Known contamination consists of the following access restricted areas: - entombed contaminated reactor structure - small portion of wastewater pipeline within reactor compound Historical Records Review site visit completed June 2007. Draft Historical Records Report completed and internally reviewed. USACE not planning to seek external reviews until funding secured to complete All-Hazards Assessment. Effort is the initial activity for the complete decommissioning of the SM-1A reactor

Health Concerns Investigation Fort Greely, the US Army Center for Health Promotion and Preventive Medicine (or CHPPM), and the Bassett Army Community Hospital (Fort Wainwright) investigated concerns during winter of 2005-06 over the perceived high rate of miscarriages (and the possibility of environmental causes) Briefings at 12/01/05 & 3/9/06 Community Meetings on Fort Greely included: Types and causes of miscarriages Environmental exposure and environmental risks Results of the investigations (miscarriage rate is slightly higher than statistical norms for the United States but no environmental factors identified) Recommendations (Continue to watch miscarriage rate for 2 yrs to determine if miscarriage increase is just variation in a small population) Website has presentations, posters, and reports www.smdcen.us/health/ Alaska Dept of Public Health reviewed & validated the investigation/findings Bassett Army Community Hospital completed two periodic reviews that showed the rates declined as expected and have ended the periodic reviews

FY 2008

FGA Installation Restoration Program Website Restoration Advisory Board Website http://www.smdcen.us/rabfga/ Interactive Maps Administrative Record Historical Documents Current Documents for RAB/public or ADEC/EPA comments (see second slide) Calendar of Events RAB minutes, agenda, advertisements, presentations etc. New items marked with “– NEW”