Land Use David Johnson.

Slides:



Advertisements
Similar presentations
Forecasting Significant Incidents in Gas Fields Test Case: Barnett Shale, Fort Worth, Texas by Jerry Lobdill, physicist and Ch. E. (ret.)
Advertisements

Guidelines and Required Codes That Affect Building Design
Building of Research Team in the Field of Environmental Modeling and the Use of Geoinformation Systems with the Consequence in Participation in International.
Federal Agency Update – January 2009 Pipelines & Informed Planning Alliance (PIPA) Communications Task Team Status Danny Gibbs Spectra Energy / INGAA It’s.
Pipelines & Land Use How Can They Help You? Charles H. Batten, P.E. President Batten & Associates, Inc. Locust Grove, Virginia.
Pipelines and Informed Planning Alliance A Real Estate Symposium International Right of Way Association/Appraisal Institute Las Vegas, NV January 13-15,
Pipelines and Informed Planning Alliance Protecting Transmission Pipelines International Right of Way Association/Appraisal Institute Las Vegas, NV January.
Open Space Residential Development Bylaw Town of Rehoboth.
ARCHITECTURAL DESIGN Residential Design Criteria 1 1 Copyright © Texas Education Agency, All rights reserved.
Pipelines and Informed Planning Alliance (PIPA) Pipeline Safety Trust Conference November 16, 2007 New Orleans, LA Presented by Jerry Kenerson.
Shireen Abdelrahman Lecture 5. Individual development projects - new construction, expansion, or renovation - can affect the surrounding environment in.
1 Context Sensitive Solutions For Designing Urban Thoroughfares Brian Bochner Senior Research Engineer Texas Transportation Institute Brian Bochner Senior.
La Center, Washington: Balancing Pipelines and Populations 1.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
UTILITY EASEMENTS AND SUBDIVISIONS Prepared for Rapid Fire Case Studies October 31, 2012 Present by Donald A. Fisher, MAI.
Protecting Communities Task Team Update Las Vegas January 14, 2009.
Planning Zones to Protect People Near Pipelines Chuck Lesniak City of Austin Watershed Protection Department.
Pipeline Safety & Development Changes File # ZON Proponent Carl Weimer, Whatcom County Council Docketed Unanimously by the Whatcom County Council.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Farming methods  4.3. Farming Methods  All agriculture depends on soil.  Therefore, soil erosion is a major problem in agriculture.  Erosion happens.
An ordinance amending the County’s zoning and land use regulations to increase pipeline safety Adopted July 27, 2010.
Some Detroiters Living With Marathon Plant Pollution Find Peace – At a Price Written by John Carlisle Detroit Free Press Presentation by Ryan Marchand.
Federal Guidance for Pipeline Rights-of-Way Daron K. Moore El Paso Pipeline Group November 16, 2007.
New Orleans, Louisiana November 20 & 21, 2008 Pipeline Safety What More Needs To Be Done? Presented by Carl Weimer, Executive Director.
California Coastal Commission Appeal A-1-MEN (Wernette) De Novo Hearing.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Terry Boss Sr. VP Environment Safety and Operations INGAA.
When the Urban Environment Encroaches on State-Managed Land: How Does the State Balance Interests? By Cynthia Pratt, DNR.
WORKSHOP CLOSURE. Learning Outcomes Designing for Pedestrian Safety – Workshop Closure 12-2 You should now be able to:  Describe the influence of planning.
Jim Doherty MRSC Legal Consultant
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Track # Case Study Trail of the Coeur d'Alene Challenges.
Meeting #28 March 24, Junior Accessory Dwelling Units Photo by Jocelyn Knight.
Presentation to Pipeline Safety Trust Conference November 18 & 19, 2015.
Existing Conditions: - Red lines indicate zoning setbacks – NOTHING can be built outside inner red line except paving or landscape. - The parking requirement.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
The Manchester Model: The way forward in designing out crime?
Howard Preserve Expansion
PowerPoint Presentation
Proposed Budget Presentation
ARCH – 4601 Feasibility Study Presentation
NASHVILLE, TN Brandon Taylor, P.E.
WPVAR (Greenview HOA) Washoe County Board of Adjustment August 3, 2017.
Oregon Parks and Recreation Department Grant Presentation
…Can Motivate People to Prepare, Stay, & Defend
Project Management Team Meeting #3
Oil Pipeline Optimal Route
How have settlements changed?
Cllr Khevyn Limbajee, Cabinet Lead for Housing,
Using TIF to Support Primary Employers
DISCOUNT TIRE SITE PLAN PLDRB Public Hearing on August 16, 2017
Panama City – Bay County International Airport Project Update
Washington Hardwood Commission
Request #2 Request #1 Segment built by LCPS.
Special Exception Elite Custom Tattooing Studio Application #3322
Cities and PIPA Why Should We Participate? What Do We Need?
8/23/2016 Luis N. Serna, AICP David Healey, FAICP
Junior Accessory Dwelling Units
Community Update Project Overview Maximizing Benefits
Site Design •Project Site context Module 3: •Site Analysis
MENU OF TOOL TOPICS (Choose 4 out of the 11 listed)
Introducing Community Land Trusts
A Vision for the District: Perspectives from the City
Competency: Create site plan drawings
A grassroots civic voice An effective network Supporting communities
Impact of Zoning on Affordable Housing February 16, 2018
WSUP The Club at ArrowCreek Grading
WSUP & WADMIN The Club at ArrowCreek
Conservation Statute Amendment
Presentation transcript:

Land Use David Johnson

On ROW Permanent structures, significant grade changes, large landscaping not acceptable Need to be able to inspect, operate and maintain the pipeline safely & effectively A clearly defined corridor blending with surroundings helps neighbors, residents and excavators manage activities

Adjacent to ROW Generally no restrictions beyond ROW or easement Possible exceptions – Activities impacting the pipeline Contouring or terracing Blasting Work with operator to maintain safety

Solutions ? Land use planning, restrictions, zoning, disclosures – community issues Must consider the rights and safety of all affected parties PIPA Pipelines and Informed Planning Alliance

Northlake Forest, Cypress, Texas

Northlake Forest This development built around 1999 Homes average 3000 – 4000 sq. ft. Values typ. $200k - $350k Incorporated pipeline ROW as green space

Northlake Forest

Northlake Forest

Northlake Forest

Coles Crossing, Cypress, Texas

Coles Crossing This development built around 2002 Homes average 3400 – 4400 sq. ft. Values typ. $300k - $400k Incorporated pipeline ROW as green space

Coles Crossing

Coles Crossing

Coles Crossing

Coles Crossing

Conclusions Try to work with developers early Incorporate ROW as green space Walkways & benches add to ambiance Stay in touch with homeowners associations