DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Advertisements

AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
ANALYTICS: BRINGING VALUE TO THE UTILITIES IN MITIGATING ENERGY LOSSES José-Manuel LOPEZ Istanbul, May 9, 2014.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
1 By: Mr. Zafar Mahmood Chairman, Water and Power Development Authority OCTOBER 2014.
Mr. Phuong Hoang Kim Energy Efficiency Office Ministry of Industry REVIEW OF VIETNAM ENERGY EFFICIENCY & CONSERVATION POLICY.
Donors’ Conference on Sustainable Energy for Kosovo
IURPA JUNE 2002 REVENUE PROTECTION AND NEW TECHNOLOGIES.
SMART Devices in Utilities Béla Bakos Innovation advisor
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Solar Metering and Performance Monitoring Exposition June 4, 2007.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
HARVEST GROUP Smart Grid Harvest Power Technologies 30 th Aug 2014.
Smart Grid APPA Annual Meeting Kiah Harris Burns & McDonnell June 15, 2009.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Power Line Carrier Communication based Automated Meter Reading System
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
Akshay Prakash Yojana A Voluntary DSM Initiative November 2005 
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
Croatian Power System 1 The Electric Power System - Croatia -
1 Distribution Efficiency Conservation Voltage Regulation (CVR) Jillianne Welker 4/21/2009.
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Urban water supply The privatization process in Mozambique
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
Vision for Power Sector: To Ensure reliable & quality power supply to all citizens by 2021 at an affordable price. Vision 2021: To be a Middle-Income.
FERC Staff’s Report on Demand Response and Advanced Metering.
Moving Forward with Clean Energy Priyantha Wijayatunga Principal Energy Specialist, Asian Development Bank
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Renewable Energy Innovation In Canberra Jon Sibley Director, Energy and Waste Policy Environment and Planning Directorate.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Smart Grids and Meters Workshop November 2015 بسم الله الرحمن الرحيم Electricity Loss Sudan - Khartoum The Arab Union of Electricity (AUE) The Sudanese.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
1 Watson Peat Using Intelligence to INSPIRE Future Networks 12 th May 2016.
Support for the SDDX Program: Training for Renewable Energy Service Companies Beijing JKD Renewable Energy Development Center 8 th June, 2005.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Kenya’s INDC: Actions in the Energy Sector
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Danube Water Conference 2017, Vienna
Donor Coordination Process
Chairman of the Board and CEO,
ELECTRICITY COMMISSION
Off-grid Electrification Department of Rural Development
in Smart Metering Solutions
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Energy Sector Overview Federated States of Micronesia
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Busbar Market share research by applications and regions for 2017 – 2024.
The Transition to a High DER Future
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 North America Microgrid Market.
How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
Grid Modernization in Massachusetts
WATER REGULATORY AUTHORITY
Water Resource Management “Uganda’s Experience”
EVP, Chief Administrative Officer
ENCLAVE POWER COMPANY LIMITED
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Brandenburg’s Contribution to the “Energiewende” in Germany
Presentation transcript:

Apua workshop-ABIDJAN, 9 TO 10TH November, 2017 THEME: LEADERSHIP WORKSHOP ON GOVERNANCE AND REDUCTION OF TECHNICAL AND COMMERCIAL LOSSES IN AFRICAN POWER UTILITIES

Overview of REG and ITS business line NOVEMBER 2017

Background REG is a product of reform that separate Water and energy Business, creating WASAC as a water company and Rwanda Energy Group with two subsidiary companies; Energy Utility Corporation Limited and Energy Development Corporation Limited, The main purpose of the reform was to create focus and improve operational efficiency in the two companies,

Holding company CORPORATE STRUCTURE Energy Development Corporation Ltd Energy Utility Corporation Ltd

Monitoring and evaluation CORPORATE STRUCTURE Group leadership Coordination Monitoring and evaluation Audit

SUBSIDIARY MISSION - General power system planning - Energy infrastructure projects development (Generation and Transmission) - Electricity roll-out program - Primary energies (Oil, biomass) - Social energies (Off-grid systems, biogas…)

SUBSIDIARY MISSION - Power generation and bulk purchase from IPPs, - Operation and maintenance of Government owned Power Plants - Bulk power transmission, - Power distribution, - Network Operation and maintenance - Retail of electricity - Consumer relation & demand side management

Electricity Access Access to electricity by households increased more 4 times from 9% in 2010 to 41% by October, 2017 (On-grid 30% and 11% off-grid); 92% of Sector Offices connected to electricity grid and expected to increase to 98% by June 2018; Plans to reach 100% access by 2024 and a financially reasonable mix of grid versus off grid solutions. Introduced lifeline and time of use tariff

Generation vs. Demand Currently, Generation and Demand are almost balanced Installed Capacity: 208 MW Highest Demand: 130 MW PEAK SHOULDER OFF-PEAK Period Times Off-Peak 23:01 Hours – 8:00 Hours Shoulder 8:01 Hours – 16:59 Hours Peak 17:00 Hours – 23:00 Hours

COUNTRYWIDE ELECTRICITY INFRASTRUCTURE COVERAGE AS OF OCTOBER, 2017 Below map shows that: entire country is almost covered by MV network which simplifies connectivity and increasing chances to connect more customers, Reduction in connection cost, Improving reliability of supply (with areas being able to be fed from more than one source), Import/export opportunities with neighboring countries,

FUTURE interconnectors

Strategies to control both technical and commercial losses Zero tolerance on electricity theft, (high penalty charges), Use of prepaid Meters (this improved recovery which in some countries is also a challenge) but also has its weakness) Application of penalties on rate recovery/payment and this is being reviewed to align with bank annual interest rates/charges Proper metering or control of energy flows (generation, auxiliary supply, own consumption etc..) SCADA System (Providing visibility on the network) Introduction of remotely read meters (piloted but also work in progress to increase coverage) Awareness campaigns, toll free lines, A dedicate Unit under commercial department to deal with theft of all kinds (Revenue protection Unit) Regular inspections and audits (illegal connections and power factor)

Strategies to reduce losses Installation of smart meters to quantify technical losses, (funded by European Union), February, 2018-ongoing project There is an ongoing project to install smart meters on big customers (the rationale is that 0.3% of customers contribute 53% of our revenues), completion scheduled June, 2018 Reinforcement of electricity distribution network (Kigali, Rubavu and eastern part of the country) Limit extension of 15kV network,

Ongoing and planned initiatives-systems Expansion of overall coverage of Fibre, (this will also reduce OPEX for both DMS and MDMS etc..) Introduction of distribution management system (all active devices i.e automatic load switches, auto re-closers etc..); Operationalizing Integrated Business Management System (IBMS) that shall comprise asset management, enterprise source plan etc; Deployment of Advanced Metering Infrastructure (AMI), for quantification of technical losses; Upgrade of ArcGIS (to include Geonis Electricity) and a basis for DMS and other systems,

AMR Network Architecture HT LINE DCU GSM/GPRS LT LINE PLCC Data Flow From DCU To DCU

Challenges Aligning network extensions with system improvements, low voltage dominant in electricity distribution, High Energy Losses (21.08%) Cost of Financing (interest rates are high) Technical knowhow (skills) Expensive solution to appropriately deal with losses and improve operational efficiency, Legal and regulatory Gaps (this being addressed, a draft law available and in review process) Managing high level of access targets and low levels of combined technical and commercial losses Rwanda-DRC Section: USD 6.2 million-x-rate gap ISOLUX-

LEARNS LEARNT Use of technology can be a good means to guide investments, Training of personnel, Proper internal controls to avoid abuse of power, Stringent sanctions and zero tolerance are key, Proper data management is key, Should be able to ensure issues of under voltages and line overloading, oversized transformers and single phase technology roll-out are properly dealt with You have to have buy-in from line Ministry and key stakeholders, Proper planning for network extension or growth has a huge implication on future network performance-this is a critical challenge especially when one is to apply same principle as in developed countries Rwanda-DRC Section: USD 6.2 million-x-rate gap ISOLUX-