Daimler-Chrysler Layered Process Audits (DCX LPA)

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Orientation and Training
CASH HANDLING Training Presentation
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Quality Assurance VS Quality Control
Tacitus. Charlie Gragg CEO Software Engineering Applications Solutions, Inc.
Project proposal and approval. This is a formal process that helps you and your supervisor ensure you have chosen an appropriate area of study that will.
Presented by TS Hamilton. Five Core Competencies We link our courses to CalSTRS core competencies.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Roberts Tool Company, Inc Strategic Planning Presented at SEA Webex January 10, 2011.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Safety, Health & Environment
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
Project Closure. Objectives  Determine when to terminate a project  Identify various reasons why a project is terminated  Describe a project audit.
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
 What is Standard Work?  Types of Standard Work?  Groundwork for Standard Work.  What is Poka-Yoke?  How to create Standards?  Simulation exercise.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Data Collection. Data Capture This is the first stage involved in getting data into a computer Various input devices are used when getting data to the.
Quality Circle and 8 D Methodology Dr. Mohamed Riyazh Khan - DoMS.
Kronos Information for DU Supervisors: Approving Your Employees’ Timecards.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Module 12: Quality Control
Chapter 3 – The Process Approach 1 Process Approach Auditing 14-April-2009 QUESTIONS FOR USE DURING YOUR PROCESS AUDITS.
Warm-up. Systems of Equations: Substitution Solving by Substitution 1)Solve one of the equations for a variable. 2)Substitute the expression from step.
Controlling By: Mrs. Belen Apostol. What is controlling refers to the process of ascertaining whether organizational objectives have been achieved; if.
Layered Process Audits Tommy Beheler Quality Manager The Timken Company’s Gaffney Bearing Plant.
QSB Quality System Basics & Q7 tools in practice
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
Quality is the totality of features and characteristics of product or services that bear on its ability to satisfy the stated needs.  In simple words.
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA Suppliers Performance.
BSA 385 Week 1 DQ 2 Why is cost-effective software engineering so important in today’s design and development of Information System solutions? Check this.
Process engineering Quality controls.
Quality Assurance.
Mental Addition – Objectives
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Systematic Project Management is our answer to the challenges in today’s project business We have the biggest portion of our business volume coming from.
LAYERED AUDITS.
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Supervisory Control and Quality
MARK 160 MID TERM FEEDBACK FORMS
Daimler-Chrysler Layered Process Audits (DCX LPA)
What is Technology? Chapter 1 Section 4.
Quickbooks training in Chandigarh. Quickbooks Customer Service,s Features.
با نام و ياد خدا.
Introduction In the first lesson we demonstrated the following:-
GHSP Problem Solving Team Champion: Team Members: Team Mentor:
Introduction to Computing
Go Green with VelociTRACKER™
  Aptiv Global Supplier Quality Early Production Containment Training.
Layered Process Audits
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Unit 2 – A People Business
UNDERSTANDING FOR STANDARD
RISK REDUCTION PROCESS
It’s that time… Journal Entry #13 Title: Progress Check
See the possibilities TM.
FAIRTRADE TRAINING GUIDE FOR SMALL FARMERS’ ORGANIZATIONS
Background Mandated by DaimlerChrysler for all tier 1 suppliers
An Audit of the SYSTEM, Not the PEOPLE
TS
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
TS
Software Reviews.
ISO9001 and Document Control Awareness Training
Year 2 Summer Term Week 11 Lesson 2
TS
Title: 9-Week Progress Check
Presentation transcript:

Daimler-Chrysler Layered Process Audits (DCX LPA) Alberta Risner 9/20/2018

Goal Satisfy Daimler-Chrysler mandated LPA (Layered Process Audit) Training of Managers and Supervisors Satisfy Customer Specific Requirements and TS16949 requirements Continual Improvement 9/20/2018

Continual Improvement 9/20/2018

Where are we now? No Layered Process Audits (LPA) are currently being performed Training has been started at SRAF (Today) Input in Chrysler’s Powerway will begin when LPAs have started 9/20/2018

Training Training will be Painless Training will be Hands on Training will encompass all management levels Training will be completed 9/20/2018

Kinda Painless 9/20/2018

Past History No history on LPA We’re creating the line in the proverbial sand. Lessons Learned can and should apply 9/20/2018

What are our choices Not performing LPAs? Pitch in and get it done 9/20/2018

No Choice Pitch in and get it done Perform LPA as required Why No Choices ? 9/20/2018

Daimler-Chrysler Mandated 9/20/2018

What is a Layered Process Audit? (LPA) LPA is an ongoing system of process checks that verify proper methods, settings, operator craftsmanship, error proofing devices and other inputs are in place to ensure a defect free product. 9/20/2018

What is a Layered Process Audit (LPA)? Continued LPA’s assure that defined methods and work instructions are utilized, problem solving solutions are held in place, and all process issues are identified and quickly corrected. 9/20/2018

What is a Layered Process Audit? continued Two types of LPAs Auditing the Process itself Auditing the Error Proofing 9/20/2018

1. Process Audit 9/20/2018

LPA – Process Audit 9/20/2018

LPA Process Audit continued 9/20/2018

2. Error Proofing Audit 9/20/2018

9/20/2018

How Long Will either LPA Take? On average 15 minutes 9/20/2018

What do we need to perform a LPA? A pen or pencil A Checklist Knowledge of the Process (A sense of humor helps) Commitment for success 9/20/2018

9/20/2018

LPA Frequency Plan Plant Manager-once a week Area Managers-once a week Production Supervisors-once a shift This Proposed Frequency will: Encourage Management Involvement Establish Operator Feedback Establishes Accountability 9/20/2018

SRA LPA Audit Frequency and Structure 9/20/2018