Dick Greenwood OU Workshop 7/10/02

Slides:



Advertisements
Similar presentations
DOSAR Workshop VI April 17, 2008 Louisiana Tech Site Report Michael Bryant Louisiana Tech University.
Advertisements

Southwest Tier 2 Center Status Report U.S. ATLAS Tier 2 Workshop - Harvard Mark Sosebee for the SWT2 Center August 17, 2006.
McFarm: first attempt to build a practical, large scale distributed HEP computing cluster using Globus technology Anand Balasubramanian Karthik Gopalratnam.
Duke Atlas Tier 3 Site Doug Benjamin (Duke University)
Chapter 7 Firewalls. Firewall Definition  A network device that enforces network access control based upon a defined security policy.
New Cluster for Heidelberg TRD(?) group. New Cluster OS : Scientific Linux 3.06 (except for alice-n5) Batch processing system : pbs (any advantage rather.
Title US-CMS User Facilities Vivian O’Dell US CMS Physics Meeting May 18, 2001.
Security Issues on Distributed Systems 7 August, 1999 S 1 Prepared by : Lorrien K. Y. Lau Student I.D. : August 1999 The Chinese University.
Connecting To A Remote Computer Via ‘Remote Desktop Web Connection’ Compatible With ‘Most Any’ Computer.
CNT-150VT. Question #1 Your name Question #2 Your computer number ##
DOSAR Workshop V September 27, 2007 Michael Bryant Louisiana Tech University Louisiana Tech Site Report.
Firewall and Internet Access Mechanism that control (1)Internet access, (2)Handle the problem of screening a particular network or an organization from.
April 2001HEPix/HEPNT1 RAL Site Report John Gordon CLRC, UK.
UTA Site Report Jae Yu UTA Site Report 4 th DOSAR Workshop Iowa State University Apr. 5 – 6, 2007 Jae Yu Univ. of Texas, Arlington.
Group Computing Strategy Introduction and BaBar Roger Barlow June 28 th 2005.
Corporate Firewalls and DMZs By Matt Bertram ISQS 6342 (Spring 2003) Professor John Durrett.
Firewalls. Intro to Firewalls Basically a firewall is a __________to keep destructive forces away from your ________ ____________.
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
28 April 2003Imperial College1 Imperial College Site Report HEP Sysman meeting 28 April 2003.
D0SAR - September 2005 Andre Sznajder 1 Rio GRID Initiatives : T2-HEPGRID Andre Sznajder UERJ(Brazil)
SLAC Site Report Chuck Boeheim Assistant Director, SLAC Computing Services.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Status of Grid-enabled UTA McFarm software Tomasz Wlodek University of the Great State of TX At Arlington.
Spending Plans and Schedule Jae Yu July 26, 2002.
26SEP03 2 nd SAR Workshop Oklahoma University Dick Greenwood Louisiana Tech University LaTech IAC Site Report.
Archiving Solutions Software vs. Hosted vs. Appliance Based.
1 Firewalls Types of Firewalls Inspection Methods  Static Packet Inspection  Stateful Packet Inspection  NAT  Application Firewalls Firewall Architecture.
DØSAR a Regional Grid within DØ Jae Yu Univ. of Texas, Arlington THEGrid Workshop July 8 – 9, 2004 Univ. of Texas at Arlington.
Infrastructure for the LHCb RTTC Artur Barczyk CERN/PH RTTC meeting,
LTU Site Report Dick Greenwood LTU Site Report Dick Greenwood Louisiana Tech University 1 st DOSAR Workshop at Sao Paulo September 16-17, 2005.
Module 5 : Security I Jong S. Bok
UTA Site Report DØrace Workshop February 11, 2002.
Using the Weizmann Cluster Nov Overview Weizmann Cluster Connection Basics Getting a Desktop View Working on cluster machines GPU For many more.
UTA MC Production Farm & Grid Computing Activities Jae Yu UT Arlington DØRACE Workshop Feb. 12, 2002 UTA DØMC Farm MCFARM Job control and packaging software.
PIC port d’informació científica DateText1 November 2009 (Elena Planas) PIC Site review.
What’s Coming? What are we Planning?. › Better docs › Goldilocks – This slot size is just right › Storage › New.
DOSAR Workshop IX, South Africa, April 6-8, 2010 Wrap-up and discussion of short- term goals and Action Items Pat Skubic OU.
DØRACE Workshop Agenda Feb. 11, 2002 (Morning – 1West) 8:30 Registration at High Rise next to 1 West Conference room 9:00 Welcome (John W.) - Session Chair:
DØRACE Workshop Agenda Feb. 11, 2002 (Morning – 1West) 8:30 Registration at High Rise next to 1 West Conference room 9:00 Welcome Womersley 9:10-9:30 DØRACE.
UTA Site Report Jae Yu UTA Site Report 7 th DOSAR Workshop Louisiana State University Apr. 2 – 3, 2009 Jae Yu Univ. of Texas, Arlington.
DOSAR Workshop III, OU P. Skubic DOSAR Workshop III Goals and Organization P. Skubic OU.
LTU Site Report Dick Greenwood LTU Site Report Dick Greenwood Louisiana Tech University DOSAR II Workshop at UT-Arlington March 30-31, 2005.
A Complete Guide to Select the Best VPS Hosting Providers.
Kittiphan Techakittiroj (25/06/59 19:10 น. 25/06/59 19:10 น. 25/06/59 19:10 น.) Network Address Translation Kittiphan Techakittiroj
ALICE WLCG operations report Maarten Litmaath CERN IT-SDC ALICE T1-T2 Workshop Torino Feb 23, 2015 v1.2.
PROTO-GRID Status of Grid-enabled UTA McFarm software Tomasz Wlodek University of the Great State of Texas At Arlington.
Bentley Systems, Incorporated
Welcome to SharePoint Saturday Houston
FIREWALL configuration in linux
Monte Carlo Production and Reprocessing at DZero
OUHEP STATUS Hardware OUHEP0, 2x Athlon 1GHz, 2 GB, 800GB RAID
Southwest Tier 2 Center Status Report
Kiyoshi Kodama, SE Japan 07-Oct-2008
5th DOSAR Workshop Louisiana Tech University Sept. 27 – 28, 2007
Partner Status HPCL-University of Cyprus
Dave Williams PDS Management Council UCLA 4-5 February 2016
2018 Valid Microsoft Exam Dumps IT-Dumps
Installing Analysis Software
Scalable Database Services for Physics: Oracle 10g RAC on Linux
News & Action Items Automatic Release Ready notification system is in place and working (Thanks Alan!! ) Needs refinements!!! New Fermi RH CD-Rom released.
UM D0RACE STATION Status Report Chunhui Han June 20, 2002
Linux Server Presentation
News p has no fetchpkgs.sh and fetchprod.sh shell script in the .../D0reltools/ These are missing due to the switch over to the new distribution.
Update of D0 Linux Cluster at LaTech
Lee Lueking D0RACE January 17, 2002
The CMS Beijing Site: Status and Application
Remote SAM Initiative (RSI) – Proposed Work Plan
SAM Offsite Coordination
Installing Analysis Software
Presentation transcript:

Dick Greenwood OU Workshop 7/10/02 LTU Site Report Dick Greenwood OU Workshop 7/10/02 7/10/2002 Dick Greenwood OU Workshop

Status of Linux Cluster 11 Linux pc’s loaded with Linux 7.2 Node caps10 has D0RunII p11.08.00 installed and operational (ie, can analyze data and perform MC’s) Took long time to get it going because of: LTU Firewall Crazy SAM Name Server issue 7/10/2002 Dick Greenwood OU Workshop

Dick Greenwood OU Workshop LTU Firewall Presently Caps10 outside Firewall But am almost certain that it will function ok inside the Firewall except for ports =>1024 for incoming TCP and UDP connections from: d0mino.fnal.gov d0ora1.fnal.gov d0ora3.fnal.gov d0ora4.fnal.gov (see email to D0RACE from Thomas.Nunnemann@Physik.Uni-Muenchen.DE) 7/10/2002 Dick Greenwood OU Workshop

Dick Greenwood OU Workshop SAM Name Server issue Server Host Name is CASE SENSITIVE!!: caps10.phys.LaTech.edu (not caps10.phys.latech.edu ) => Take care when specifying mount point, ie, sam add disk --mount=caps10.phys.LaTech.edu:/…. Thanks to Chris Jozwiak for finding this! 7/10/2002 Dick Greenwood OU Workshop

Dick Greenwood OU Workshop Present & Future Submitted today DoE/EPSCOR LTU-Fermilab Partnership grant to fund Postdoc & Grad Student to work on D0RACE Working with Mark Sosebee and student on SAM issues Installing MC Farm and GLOBUS (Michael Wallis coordinating with Tomasz and Jae at UTA) Purchased 120 GB Storage Disk for MC Farm 7/10/2002 Dick Greenwood OU Workshop