Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
Module Production Brussels Ê Problems with vacuum chambers in plate solved 4 Almost all plates back in Brussels (repaired in Aachen) Ë Problem with rotation.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
Roberto Tenchini CMS FB December 2004 CMS Tracker The Tracker Cost Review - November 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Status Brussels GANTRY Ê New measurements of pin positions 4 using short pins rather than long ones 4 improved the precision Ë Cross-check of precision.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
BM&N STS ladders assembly in VLHEP
7th Belle II VXD Workshop, Prague
BSS Prep work at CERN and Acceptance of Parts
SCHEDULE Nov 1st - Assembly Table Complete
Status Brussels GANTRY
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
FNAL Production Experience
Hamburg Bonding Report
Vienna Module Production
CMS Perugia Modules Production Review
US Testing Update Anthony Affolder (On behalf of the US testing group)
TEC Module Production Overview
Station and Module Support Frames
Bari production centre resp. M. de Palma
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Module Production in Brussels
CMS Perugia Gantry Status Report
L.Fiore Gantry Meeting during the CMS TK week
UK CMS Oversight Committee Mtg
Module Production in Brussels
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
PROGRESS on EE VPTs, Dees D Cockerill
Current Module LT Testing Capability
TEC module quality overview
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
What do you think is the theme of our assembly today?
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Presentation transcript:

Status Brussels GANTRY O.Bouhali, J.D’Hondt, J. Heyninck, C.Vandervelde, L.Van Lancker, J.Wickens Gantry meeting CMS – June 2004 Assembly of R3 modules good precision (introduced corrections) lacking hybrids (only 10 left) Assembly of R6 modules via dry assemblies we have estimated corrections will produce some R6 modules this week for tests Assembly of R5 modules (R5N and R5S) for R5N the final commissioning of the plate will happen this week some more work is needed for R5S

R3 module production Precise and stable production of about 80-90 modules up to now (total ~700) some bad modules in the beginning of the production introduced ‘off-line’ corrections which are applied during assembly most of them shipped to Hamburg or Karlsruhe CMS TEC specifications

R6 and R5 module assembly R6 modules : we have determined the final ‘off-line’ corrections for one plate still checking the stability of these corrections expected to be ready for precise and stable production today !! making ourselves ready for the HPK sensors to arrive for test soon (change of sensor mask) R5N modules : we are almost ready with one plate final estimate of the pin positions this week we finalize the estimation of the ‘off-line’ corrections expected to be ready for some precise and stable production by next week !! R5S modules : to be finalized soon

Residual issues Gluing of 2D label on frames ?? we wait for a tool from Aachen to position this label with ~0.5mm precision We are installing a second back-up PC in case of sever accident can we already include the spare expansion card ?? used to be positioned here proposal to put it here (Aachen) (reduces the problem of overlapping legs during module mounting on petals) (different tool for each module type ??)

Available components R3 modules : hybrids # 10 HPK sensors # 326 ST sensors # 58 (W6A) # 92 (W6B) R5 modules : hybrids # 30 (R5S) # 10 (R5N) ST sensors # 37 (W5A) # 25 (W5B) soon some HPK sensors are supposed to arrive for testing !!

Summary R3 modules : If hybrids arrive we just continue the production… (1 plate) R6 modules : Ready (~) today for production (1 plate commissioned) Smaller details to deal with in order to make the production easier R5 modules : The work on R5N to be finalized (1 plate ready soon) More work needed for R5S (1 plate ready within few weeks) new technician arrived and being trained for the production