DEF Pressure Line Routing requirement and testing

Slides:



Advertisements
Similar presentations
SCR & 2010 Emissions.
Advertisements

3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
IDENTIC AB Presentation of IDENTIC and the IDENTIC system for AdBlue
EPA 2010/ GHG14 EMMISIONS Created for: APMA By: Scott Fast.
Clean School Bus USA and Ultra Low Sulfur Diesel Dale Aspy, EPA Region 4 February 10, 2006.
Copyright © 2014 Delmar, Cengage Learning APAD/ACPU A/C Control Systems Instructor Name: (Your Name) 11 CHAPTER.
High Pressure Lifting Bags
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
EVAPORATIVE EMISSION CONTROL SYSTEMS
Preparing Foundations for Cylinders & ASME Tanks
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
ISX12 G & ISL G Cold Weather Operation 1. ISX12 G and ISL G Cold Weather Operation  Cold weather affects CEGR SI natural gas engines differently compared.
Intelligent Boiler Sequencing
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Confidential | AA-AS/xx | 7/8/2015 | © Robert Bosch GmbH 2015 All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution,
1 Science of Flight The Aerospace Environment Model Rocketry.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
Air condition installation
World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application.
Affidavit: Annual Delegated Assembly Emission Compliance 10-Minute Training Module 2015.
Automotive Heating And Air Conditioning
Presented by.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
14 Refrigerant Recovery, Recycling, and Recharging.
SAFE WORK INSTRUCTIONS
Design of Cold Water Networks
EVAPORATIVE EMISSION CONTROL SYSTEMS
2018 Natural Gas Beta to LP Changes
Chapter 9 Safety Permit Systems
S12700 CSS Card Clustering 1 Components and Tools 2 Installing Cards
“Prepare, Prevent, Respond”
Under-Hood Vehicle Inspection
Event Security Guard And Training
SCR Coolant Circuit Flow Test
SCR Aftertreatment.
Application Engineering Role
Off-Highway Diagnostic Improvement Project
Application Engineering Role
Down Pipe Temperature Drop
C Air Compressor Up-fit and Plumbing Guide For LDI B3
Down Pipe Temperature Drop
Off-Highway Diagnostic Improvement Project
Real Solutions Product Introduction
Fuel Supply System Service
Protective Relaying Conference
Home You can view all Flo Fab rep order that been sold so you can easily get end user feedback Call factory for password.
Low DEF Level Programmable Parameter Changes
2017 B Software Release.
CABINET X-RAY MACHINE OPERATOR RADIATION SAFETY TRAINING COURSE
SAFE WORK INSTRUCTIONS
Manual D Duct Sizes Room Cooling CFM % Total CFM Heating CFM Kitchen GR Dining Bed Bed 3.
Adblue Market 2019 Size, Revenue, Review, Statistics, Demand Supply and Forecast to 2023 PREPARED BY Market Research Future (Part of Wantstats Research.
Light Vehicle Diesel Engines
Lockout/tagout Refresher Training
Compressor Operating Instructions
Door Heat Exchanger: Specification
Heavy Duty Entry Level Technician Course Hydraulics
2010 Heavy Duty OBD Overview
CLASS® Compressible Liquid Adaptive Suspension System
Presentation transcript:

DEF Pressure Line Routing requirement and testing Rahul Janarthanan November 2015

Information Security Protect Information - Competitors desire to know what we are doing Discuss only with other team members who have a “Valid Right and Need to Know” Information shared should be clearly stated as Cummins Confidential and the vehicle OEM should use same “Need to Know” criteria for distribution within their company 9/20/2018 Cummins Confidential

Objectives After completing this course you will be able to: Understand the importance of DEF pressure line routing Understand the AEB requirements for DEF pressure line routing Understand when the clear line test must be performed Have awareness of overall test procedure and equipment for DEF clear line test 9/20/2018 Cummins Confidential

Reference AEB’s Market AEB Description AEB 24.76 Off Highway T4F Bosch Dosing System Aftertreatment Emission-related Installation Instructions and Requirements AEB 24.78 Aftertreatment Test Methods and Procedures On Highway EPA13 AEB 21.112 Automotive and Bus Aftertreatment (DPF and SCR) 2013 Installation Requirements Note: This presentation is applicable only for installations using Bosch dosing systems.

DEF Pressure Line Routing Requirements The DEF system must be designed such that upon priming with a closed dosing module, a minimum of 50 mm (2 in) of fluid can be observed above the dosing module. The 2in DEF column will help dissolve DEF crystallized at the dosing module during a hot shut down event. This requirement can be satisfied by routing the pressure line at a specific minimum elevation angle with a minimum DEF line length above the doser as listed in Table 5 of AEB 24.76/Table 26 of AEB 21.112. Note: These requirements are not applicable for T4F QSG12 as the pressure line remai9ns filled with DEF even after shut down as it does not purge.

DEF Pressure Line Routing Requirements Note: These requirements are not applicable for T4F QSG12 as the pressure line remai9ns filled with DEF even after shut down as it does not purge.

DEF Pressure Line Routing Requirements Line Length (m) Minimum DEF line length above the doser ‘X’ Minimum Elevation* Angle Y° 0.5 254 mm (10 in) 10° 1 280 mm (11 in) 1.5 300 mm (12 in) 2 380 mm (15 in) 2.5 420 mm (16.5 in) 3 450 mm (18 in) * Recommended to add the machine maximum parking angle to the minimum 10° Note: If the above requirements are not satisfied, Test Method 10 in AEB 24.78/Appendix L in AEB 21.112 needs to performed to determine if the pressure line routing supports the introduction of DEF into the dosing module.

Test procedure Test equipment and tools required Laptop with Calterm (Field/Engineering) or INSITE. Inline 6 or Peak adapter. 2nd dosing module (not installed on the aftertreatment). Food coloring (organic). Transparent DEF pressure line. Must be production intent length, diameter, connectors, and routing. Must have markings spaced in 12.7 mm (1/2 in) intervals from the inlet connector of the dosing module. Line material must be Polyamide (PA), Ethylene Propylene (EPDM) or equivalent. Do not use Buna-N, Neoprene, Silicon, Tygon or similar material, as they will chemically react with diesel exhaust fluid. 9/20/2018 Cummins Confidential

Test Procedure Machine Preparation Check that there are no fault codes. Install clear DEF pressure line on equipment to match production intent routing. It is recommended to add a small amount of food coloring to the DEF to improve visibility. Note: Food coloring improves visibility of the DEF during the test. Coloring of the DEF is strongly recommended on applications where the dosing module is not readily visible from the outside of the equipment. 3-5 drops of food coloring per gallon of DEF is sufficient to improve visibility. 9/20/2018 Cummins Confidential

Test Procedure Machine Preparation – contd. Move the electrical connector from the dosing module attached to the aftertreatment system and attach to a 2nd dosing module not mounted on the aftertreatment. Note: Switching the electrical connector to a 2nd dosing module will simulate a malfunctioning dosing module. This is done in order to allow the diagnostic features of the dosing system to work while preventing the occurrence of unwanted electrical faults and dosing into a cold exhaust 9/20/2018 Cummins Confidential

Test Procedure Start equipment and allow the DEF dosing system to prime. Ensure that the DEF dosing system completes the priming sequence. When the priming sequence is completed, the pressure in the DEF dosing system will be maintained. a. If Calterm is used, wait until CALTERM parameters (V_USM_ReadyToDose) = 1 and (V_AIM_prg_UreaPumpP) = 900 +/- 20 kPa to ensure priming has been completed. b. If INSITE is used, wait until INSITE parameter (Aftertreatment Diesel Exhaust Fluid Pres) = 900 +/- 20 kPa for at least 5 minutes to ensure priming has been completed. 9/20/2018 Cummins Confidential

Test Procedure – contd. Measure the length of DEF column above/adjacent to the dosing module inlet connector as shown in Figure 10-1. Key off the equipment. Clear all the fault codes. Note: UDFM (urea doser functional monitor) fault code may show up during this test. 9/20/2018 Cummins Confidential

Pass/Fail criteria A minimum length of 50 mm (2 in) of DEF must be directly above/adjacent to the dosing module inlet connector as shown below at the end of the priming sequence.

Summary – DEF Line Pressure Drop Items Discussed: Understand the importance of DEF pressure line routing Understand the AEB requirements for DEF pressure line routing Understand when the clear line test must be performed Have awareness of overall test procedure and equipment for DEF clear line test 9/20/2018 Cummins Confidential