George Gollin University of Illinois at Urbana-Champaign and

Slides:



Advertisements
Similar presentations
I PhysicsP I llinois George Gollin, UTA LC 1/10/031 Speculations About a Fourier Series Kicker for the TESLA Damping Rings George Gollin Department of.
Advertisements

Some Timing Aspects for ILC Heiko Ehrlichmann DESY GDE, Frascati, December 2005.
Injection Session – Close-out Workshop on Accelerator R&D for USRs Working Group J.H. Chen (IHEP), O. Dressler (Helmholtz ZB), R. Hettel (SLAC), Y. Jiao.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Is there synergy between ILC and SuperB? Steve Playfer University of Edinburgh.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
Simulations Group Summary K. Kubo, D. Schulte, N. Solyak for the beam dynamics working group.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
I PhysicsP I llinois George Gollin, Damping ring kicker report, March 9, Fourier Series Pulse Compression Damping.
ILC Program discussion M. Ross Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β, 7e-4 stability,
I PhysicsP I llinois George Gollin, Damping ring kicker, December 15, Fourier Series Pulse Compression Damping.
I PhysicsP I llinois George Gollin, Damping ring kickers, SLAC ILC-America, October Damping ring kickers George.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
P I T Z Photo Injector Test Facility Zeuthen Design consideration of the RF deflector to optimize the photo injector at PITZ S.Korepanov.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
Design of a one-stage bunch compressor for ILC PAL June Eun-San Kim.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Summary of WG 3 (Sources) First ILC KEK K. Floettmann
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
ALCW at SLAC, January 7, 2004J. Rogers, Novel Schemes for Damping Rings1 Novel Schemes for Damping Rings J. Rogers Cornell University Improving dynamic.
WG1: Overall Design personal highlights report by Nick Walker First project meeting 2/12/2004 conveners: Kiyoshi Kubo (KEK) Tor Raubenheimer (SLAC)
Third ILC Damping Rings R&D Mini-Workshop KEK, Tsukuba, Japan December 2007 Choosing the Baseline Lattice for the Engineering Design Phase Andy Wolski.
CALIFES A proposed electron beam test facility at CERN
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
CLIC Damping ring beam transfer systems
George Gollin Department of Physics
Status and Plan of GDE Design Work (Including Road Map for RDR)
Accelerator Physics Technical System Group Review
Measurements, ideas, curiosities
Junji Urakawa (KEK) for ATF International Collaboration
Accelerator Layout and Parameters
Bunch Separation with RF Deflectors
Damping Ring Kicker Tests at AØ
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Yasuhiro Okada, Executive Director, KEK
A Fourier Series Kicker for the TESLA Damping Rings
LAL meeting on e+ studies, Oct. 2010
Fourier Series Pulse Compression Damping Ring Kicker
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Explanation of the Basic Principles and Goals
Barry Barish Paris ICHEP 24-July-10
A very brief introduction to beam manipulation
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

Working group 3 summary: ILC Injector sources, kickers, damping rings, bunch compressors George Gollin University of Illinois at Urbana-Champaign and Fermi National Accelerator Laboratory George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 Outline Goals and organization Sources Kickers Damping rings Bunch compressors Post-SLAC, pre-KEK activities George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 Goals Part of our charge: Review the technical issues with SC-LC; Develop a list of design elements that are: non-controversial in concept and may only need optimization should be considered open for evaluation from scratch; Present the topics the different groups are interested in… George Gollin, WG3 summary, SLAC ILC-America, October 2004

How we organized things Upstream to downstream, grouped by major subsystem: sources kicker damping rings bunch compressors Presentations tended to describe: specific work already under way future directions and concerns We discussed risks and current status of R&D status after presentations concerning each subsystem. George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 Branch points Some topics will eventually lead to ILC configuration choices among very different machine possibilities: should there be an e+ pre-damping ring or not? undulator or conventional e+ source? fast pulsed asymmetric kicker, or some kind of RF device? 17 km dog bone damping ring, 6 km, or 3 km circular ring? generate e+ using main linac beam, or build an independent linac? one-stage or two-stage bunch compressors? should there be a “feed-forward turnaround” (perhaps between damping ring extraction and main linac ejection)? George Gollin, WG3 summary, SLAC ILC-America, October 2004

Estimates of risk and current R&D status See http://awolski.lbl.gov/ILCAmericas/InjectorRiskIssues-Final.xls; please take the numbers with a grain of salt. Performance impact: 0. No impact on overall machine performance, cost, or schedule 1. Minor impact 2. Significant impact 3. It’ll never fly, Orville R&D status 0. We already know how to do it 1. Technology exists and we’re pretty confident it’ll work 2. There is a proposed solution, but it needs to be demonstrated 3. We are nearly clueless. George Gollin, WG3 summary, SLAC ILC-America, October 2004

Example: kicker for 6 km damping ring From http://awolski.lbl.gov/ILCAmericas/InjectorRiskIssues-Final.xls. technical challenge performance impact R&D status 6 ns rise / 60 ns fall 2 kick angle 3 1 repetition rate reflections 0.1% pulse-to-pulse stability Contribution to ring impedance Reliability/Long term stability George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 Sources See ILC-Americas site for list of presentations. Institutions interested in sources: Argonne, Cornell, Fermilab, Jlab, LLNL, SLAC Summary mostly from David Schultz. George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 Kickers Institutions interested in kickers: Cornell, Fermilab, University of Illinois, LLNL, SLAC. Basic choice seems to be between a fast pulsed kicker (using some sort of stripline geometry) and a more exotic device, using RF to kick, or otherwise manipulate bunches. Issues for pulsed kicker: switch speed, stability. Issues for RF kickers (e.g., pulse compression kicker): stability, general proof of concept. Issues for all: impedance impact, reflections and ringing. George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 Kickers Confidence in our ability to find/develop a satisfactory “switch” varies considerably from person to person. General consensus is that fast on/not-so-fast off is a good idea. This goes well with inclusion of gaps in bunch train to help clear electron cloud. It is the kicker that led to a 17 km TESLA dog bone. How small a ring would be possible with a so-fast-you-can’t-believe-it kicker? Probably smaller than 6 km, maybe as small as 3 km. Other effects (higher current, for example) will begin to dominate. 17 km ring: < 20 ns rise time. 6 km ring: < 6 ns rise time, < 60 ns fall time. George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 The specs Kicker specs depend, in part, on beam dynamics: phase space volume occupied by a just-kicked bunch must be well separated from that of an unkicked bunch. Dog bone (TESLA TDR) kicker specs: impulse: 100 G-m (3 MeV/c) ± 0.07 G-m (2 keV/c) residual (off) impulse: 0 ± 0.07 G-m (2 keV/c) rise/fall time: < 20 ns Perhaps larger (but less precise) impulse at injection, smaller (but more precise) impulse at extraction will be desirable. Small ring kicker rise, fall times can be asymmetric: leading edge < 6 ns, trailing edge < 60 ns George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 What’s happening Fermilab is presently gearing up to study a pulse compression kicker module using the A0 16 MeV beam. Some investigation of how well-suited A0 is for this purpose will begin early in 2005. Thinking about pulsed kickers is going on too. George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 Damping rings Summary from Andy Wolski. Institutions interested in the rings: Argonne, Cornell, Fermilab, University of Illinois, LBNL, LLNL, SLAC George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 Bunch compressor So far only SLAC and LBNL are thinking about this. Short bunches are better: wake field, energy spread considerations. Leaving damping ring: 6 mm bunch length. 0.3 mm bunch length is desired at IP. Summary from Gerry Dugan. George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004

ILC-America + ILC-global near-term goals Possible goals and timelines: pre-KEK: discuss tentative plans for injector R&D with our colleagues in America, Asia, and Europe to have a sense of who would like to do what. at KEK: rough-out an R&D plan aimed at choosing a kicker technology in ~2 years at Snowmass (August, 2005): small workshops with international participation to assess how well we’ve gotten started, and what we have learned? George Gollin, WG3 summary, SLAC ILC-America, October 2004

George Gollin, WG3 summary, SLAC ILC-America, October 2004 End notes The kicker and damping ring scare the daylights out of me. We must build one and make it work before the ILC main linac is completed. More information: Studies Pertaining to a Small Damping Ring for the International Linear Collider, FERMILAB-TM-2272-AD-TD ILC Damping Rings web site: http://awolski.lbl.gov/ILCDR/ George Gollin, WG3 summary, SLAC ILC-America, October 2004