A B C Solution Analysis Technology Maturation & Risk Reduction

Slides:



Advertisements
Similar presentations

Advertisements

JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Navy Working Capital Fund and PBL Director, Supply Chain Solutions Division Presented at: PSM Workshop Ft. Belvoir 14 January 2015.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
What are MRLs ? Alfred W. Clark Dawnbreaker, Inc.
Life Cycle Logistics FIPT
LOG 101 Curriculum Review 21 Oct 2011 Curriculum Review LOG 101 Acquisition Logistics Fundamentals Presented to the Life Cycle Logistics (LCL) Functional.
From Research Prototype to Production
OASD Logistics and Materiel Readiness
CAPE TOWN STADIUM: SUSTAINABILITY. FOR HOST CITY CAPE TOWN FIFA WORLD CUP SOUTH AFRICA 2010 
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
LOG Curriculum Review Presented by Tom Simcik January 11, 2008.
LOG 101 Curriculum Review 16 Oct 2009 Curriculum Review LOG 101 Acquisition Logistics Fundamentals Presented to the Life Cycle Logistics (LCL) Functional.
Technology Commercialization Technology Commercialization, 2011 Sanjay Dhole, Technology Programs Coordinator Maricopa SBDC.
Life Cycle Costing By Rajat Shuvro Bakshi Formerly Professor of Strategic Management and International Business Indian Institute of Foreign Trade, Management.
Maricopa Association of Governments (MAG) February 5, 2003.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
Logistics Engineering and Management Hank Okraski 26 October 2013 Refer Unit 11, M&S Curriculum.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
Business, Cost Estimating & Financial Management Considerations
ITIL: Service Transition
Contracting (Product) Considerations
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
MDD to Milestone A Requirements Management Activities
Summary of Changes to the
ISA 201 Intermediate Information Systems Acquisition
PSM Lessons Learned Background
Revision reflects an evolution, not a revolution
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Product Support Strategy Demonstrated Performance
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
Enterprise Content Management Owners Representative Contract Approval
Materiel Development Decision (MDD) to Milestone A (MS A)
DAU Acquisition Training Symposium April 3, 2018
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
Contract Implications of Proposed ZEB Regulations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
c EMD Focus Plan to define product support package & supply chain
Product Support Strategy
Software Development Process
Fielding plan details and adjustments
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Fielding plan details and adjustments
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Technology Maturation & Manufacturing Development Phase
8 Tech Processes Drive Acquisition
Product Support Strategy Demonstrated Performance
Training: An Element of Integrated Product Support
Brian Wade PEO SOFSA OR NOT
Executive Project Kickoff
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
Brian Wade PEO SOFSA OR NOT
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

A B C Solution Analysis Technology Maturation & Risk Reduction Materiel Development Developmental RFP Release Full-Rate Production A B C Solution Analysis Technology Maturation & Risk Reduction Engineering Manufacturing & Development Production & Deployment Operations & Support Sustainment Requirements Product Support Strategy* Maintenance Supply Intellectual Property(IP) Manpower Arrangements Schedule O&S Affordability Cost Funding Should Cost Management Analysis Sustainment Plan Content Define > Decompose > Allocate Test Data > Performance Validation Performance Metrics Reliability Growth Progress Core Applicability Workload Source of Repair Standup Options for Repair Data, Manufacturing Specs Data Delivery O/I/D Maintenance and Supply Estimate Support options (AoA) Supportability Analysis & Design Specs, IP Options Interim Support Performance-Based Design/Support Trades (Reviews) Sustainment integrated with Test & Eval Events Contracting Actions Commercial/Organic Transitions Goal Cap O&S Contribution to Life Cycle Cost Estimate > Sustainment Implications of ICE/SCP Variances Pareto Cost Drivers > Identify Should Cost Initiatives > Schedule/Execute Initiatives PSM Designated Product Support Organization Staffed Product Support IPT Established > Integrated with External Stakeholders *other product support elements may include: Training, Support Equipment, Sustaining Engineering, Facilities, Design Interface, Packaging, Handling, Storage, Transportation