Eastern Africa Power Pool (EAPP)
Overview of Presentation
Africa at a glance: Penetration of ICTs The reach of popular ICTs The most connected countries.
Southern African Power Pool
IFPRI INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE Monitoring CAADP Implementation Melissa Lambert, Research Analyst, IFPRI Regional Strategic Analysis.
1 PIDA Domestic Resource Mobilization Strategy for NEPAD- IPPF Interconnecting, Integrating, and Transforming a Continent.
SOUTHERN AFRICAN POWER POOL SAPP REPORT TO 5 TH COORDINATION MEETING OF POWER POOLS IN AFRICA Harare, ZIMBABWE 6-7 May 2010.
Physical Features of Africa
Powering Africa – SAPP Strategies
Standard Bank Group Symposium on “Foreign Investment in Africa”
Doing Business in The East African Community 2012 Bujumbura, Burundi April 11, 2012 Alfred Ombudo K’Ombudo Coordinator, EAC Investment Climate Program.
Introduction to Africa. Create a chart like the one below – 6 Columns, 7 Rows Subregions Countries GDP Per Capita Life Expectancy Infant Mortality Economic.
Africa Programme for Energy Infrastructure Development NPCA Role By Prof M.M.Elmissiry Head Energy Programmes NEPAD Agency,NPCA Midrand,South Africa Africa.
November 8th, 2013 A Business Plan for Africa Breakaway Sessions 4: Execution plan by regional clusters Session 3: Central Africa.
November 8th, 2013 A Business Plan for Africa Breakaway Sessions 4: Execution plan by regional clusters Session 1: West Africa.
AFRICAN ECONOMIC DEVELOPMENT: AN OVERVIEW By Prof. Augustin K. Fosu Visiting Professor of Economics, Aalto University, Helsinki, FINLAND African Economic.
The Nile Equatorial Lakes Subsidiary Action Program (NELSAP) A New Approach to the Joint Management of River Basins in the NEL Region.
The Sixth Annual African Consumer Protection Dialolgue Conference Deon Woods Bell Lilongwe, Malawi 6-8 September 2014.
Governance in Extractive Industries Contract Monitoring Program Michael Jarvis, World Bank Institute Oslo Governance Forum, October 4, 2011.
The Foundation for Democracy in Africa African Port Security: Crisis on the Water’s Edge.
Splash Screen Contents Africa South of the Sahara Physical Political Gems and Minerals Fast Facts Country Profiles Click on a hyperlink to view the corresponding.
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
Regional Integration in Africa Dr Djacoba Liva Tehindrazanarivelo Boston University Geneva Programme HEID Summer Course Geneva, 30 June 2008.
The forgotten continent
Entrance Ticket Name all the continents
1 The Future of SAPP, WAPP, CAPP, and EAPP – With Inga IEEE GM 2005 San Francisco June 15, 2005 PURDUE UNIVERSITY F. T. Sparrow Brian H. Bowen Zuwei Yu.
AFRICAN DEVELOPMENT BANK GROUP ENERGY STRATEGY 17th UPDEA CONGRESS Hammamet - 29th May 2012 AMADOU Zakou Manager, Energy Division 1.
Fostering Infrastructure Development in Africa AFRICAN DEVELOPMENT BANK GROUP Bocar Cisse Senior Financial Analyst, African Development Bank NEPAD-INFRASTRUCTURE.
1 PIDA in the Energy Sector AfDB/AUC Workshop 17th UPDEA Congress Tunisia, 29 May 2012 Interconnecting, Integrating, and Transforming a Continent.
African Countries Report Objective: To demonstrate an understanding of the history and culture of an African nation. Activity: Student will choose an African.
1 ICP-Africa Progress Report Michel Mouyelo-Katoula.
Access Africa The campaign will lift 30 million people (70% of whom are women) and their families out of poverty by ensuring equitable access to a suite.
Africa The Next ASIA. Highest GDP & Diversified Economies Egypt Morocco South Africa Tunisia.
BUILDING THE INFORMATION SOCIETY 2 June From measurement to policy-making: The DOI From measurement to policy-making: The DOI as a policy tool “Digital.
The Southern African Power Pool
IGAD Secretariat, Djibouti 1 OVERVIEW ON IGAD Development Interventsions Workshop on sustainable development UNECA CONFERENCE HALL ADDIS ABABA 7-11 March.
Computer Class – Summer 20091/8/ :32 PM African Countries Algeria Angola Benin Botswana Burkina Faso Burundi Cameroon Cape Verde Central African.
The African Monsoon Recent Evolution and Current Status Include Week-1 and Week-2 Outlooks Update prepared by Climate Prediction Center / NCEP 24 August.
GeoCurrents Customizable
SOUTHERN AFRICAN POWER POOL PPP Power Projects in Southern Africa
The African Monsoon Recent Evolution and Current Status Include Week-1 and Week-2 Outlooks Update prepared by Climate Prediction Center / NCEP 02 April.
Global and Regional Perspective on Maternal, Infant & Young Child Nutrition: Overview of Progress and way forward for Sustainable Development Goals Ms.
GREEN BUILDING and CLIMATE CHANGE. Every story about GREEN BUILDING, is a story about PEOPLE.
MAURITIUS: Your Platform for Africa and Beyond 15 TH March 2016, Singapore.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
Nations (pg. 870) Libya Madagascar Malawi Mali Mauritania Morocco Mozambique Namibia Niger Nigeria Republic of the Congo Rwanda Senegal Sierra Leone.
Intro to Africa (Part 2). Create a chart like the one below – 6 Columns, 7 Rows Subregions Countries GDP Per Capita Life Expectancy Infant Mortality Economic.
UN Regional Workshop on the 2020 World Program on Population and Housing Censuses: International Standards and Contemporary Technologies Lusaka, Zambia,
Alexandria, October 2010 Jean Acri IRU Special TIR Advisor
Needs Assessment Survey (of March 2016)
Statistics Department African Development Bank
© 2017 ASLM All Rights Reserved
Africa Map Review Directions: Use the cursor or mouse button to advance the review. A country will be highlighted. Try to identify the country. The.
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Status of CBA2I in Africa
Intro to AFrica.
Report to the UPDEA 39th General Assembly
Xiaoning Gong Chief, Economic Statistics and National Accounts Section
NAQAAE PAP Egypt Dr.Amany El-Sharif Dr.Maha Rashwan.
Reported measles cases, measles coverage for 1st and 2nd doses and supplementary measles activities for the African Continent For 1990 – 2007 Data as of.
THE FIRST GROUP OF COUNTRIES:
Name: _____________________________________________________ Period: ________ Date: _____________ Africa Study Tool.

BRIEFING ON THE INTERCONNECTION LINES OF THE
AFRICA’SECURITY SITUATION AND the integration of migration regimes
Is Africa on the Creditor’s hook?
Political Map of Africa
Countries of Africa.
Putting Findings of Research into all African Perspective
Presentation transcript:

PIDA Rolling-Out the PAP 17th UPDEA Congress, Tunisia Dr. J. Moulot AfDB, dept. ONRI

Overview of Presentation PIDA Priority Action Plan 1 Projects synopsis 2 Implementation Issues 3

PAP-Energy Investment Cost: $40.3 bn Inga Hydro Phase 1 6,000 ECCAS Central Central African Interconnection 10,500 Great Millennium Renaissance Dam 8,000 COMESA/ IGAD Eastern Batoka Dam 2,800 COMESA EAC Ruzizi III Dam 450 Rusumo Falls Dam 360 Uganda-Kenya Petroleum Products Pipeline 150 North Africa Transmission 1,200 AMU Northern Nigeria -Algeria Pipeline N/A UMA ECOWAS Northern, Western North South Power Transmission Corridor COMESA EAC SADC IGAD Southern Nphamda -Nkuwa Dam 2,400 SADC Lesotho HWP Phase II -hydropower component 800 Sambagalou Dam 300 ECOWAS Western West African Power Transmission Corridor Kaleta Dam II 179

PAP vs. Regions and Project Types

PIDA Priority Action Plan 2020 Energy 15 items USD 40 bn The energy infrastructure program focuses on major hydroelectric projects and interconnects the power pools to meet the forecast increase in demand. One regional petroleum products pipeline is also included. PIDA Priority Action Plan 2020

Overview of Presentation PIDA Priority Action Plan 1 Projects synopsis 2 Implementation Issues 3

GREAT MILLENNIUM RENAISSANCE DAM Cost (Million USD) 8,000 REC Involved COMESA/IGAD Beneficiary countries Ethiopia, Nile Basin Countries Technical Organizations Ethiopian Electric Company / Nile Basin, EAPP Objectives Develop a 5,250 MW plant Expected Results increase capacity of EEPCO six-fold (750 MW at present) Supply Ethiopian and export EAPP market Project Challenges Capacity of EEPCO to O&M commercially and financially plant Mobilization of financing: Some US$ 3 billion are still needed Issuance of local bonds a challenge Coordinate Generation with development of complementary transmission and distribution Consensus building with neighboring countries (Sudan, Egypt) Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

NORTH SOUTH POWER TRANSMISSION CORRIDOR Cost (Million USD) 6,000 REC Involved COMESA/EAC/SADC/IGAD Beneficiary countries Kenya, Ethiopia, Tanzania, Malawi, Mozambique, Zambia, Zimbabwe, South Africa Technical Organizations SAPP Objectives Transport energy of Great Millennium Renaissance Dam Expected Results 8,000 km line from Egypt through Sudan, South Sudan, Ethiopia , Kenya, Malawi, Mozambique, Zambia, Zimbabwe to South Africa Project Challenges Cooperation/Agreements among participating countries No regional entity for Overall project development, operation and Maintenance Establishment of Cross Regional SPV Inter-regional interconnection between EAPP and SAPP Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

NPHAMDA – NKUWA HP-DAM Cost (Million USD) 2,400 REC Involved SADC Beneficiary countries Mozambique, Zambezi basin Technical Organizations Mphanda Nkuwa Hydro-Electric Company, SAPP Objectives Export on the SAPP market Expected Results Hydroelectric power plant with a capacity of 1,500 MW Project Challenges Completion of financing plan Project structure needs to minimize risk profile and attract commercial financing Negotiation of off-take agreements ( South-Africa: Local or Hard currency?; Capacity of Energy off-take TOP contract?) High Currency Risks and hydrology risks Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

LESOTHO HWP PHASE II - HYDROPOWER COMPONENT Cost (Million USD) 2,400 REC Involved SADC Beneficiary countries Lesotho, South Africa, Orange-Senqu River Basin Technical Organizations Lesotho Highlands Water Commission, SAPP Objectives IWRM to provide energy to Lesotho and water transfer to SA and ensures the water security of South Africa’s Gauteng province Expected Results Lesotho Highlands Water Project Phase II consists of two separate components – a) the construction of Polihali Dam and transfer to tunnel to Katse dam, and b) the Kobong pump storage scheme hydro- electricity scheme. Project Challenges Proposed 1,200 MW pumped storage component new challenge from Phase I Financing for preparation of the pumped storage component Risks mitigation for the pumped storage component. Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

INGA- HYDROPOWER PHASE 1 Cost (Million USD) 6,000 REC Involved ECCAS Beneficiary countries DRC, Congo River Countries Technical Organizations CAPP Objectives Contribute to energy security and Increase energy trade between DRC, Zambia and South Africa as well as DRC and Congo River Countries Expected Results To Develop 4,200 MW capacity run of river hydropower station on the Congo river with eight turbines Project Challenges Final structure for project development yet to be established Weak capacity of SNEL as developer Large financial package not sustainable by National interest alone Power Off-take yet to be agreed Political risk of DRC Minimizing contingent liability on GODRC’s balance sheet Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

CENTRAL AFRICAN INTERCONNECTION Cost (Million USD) 10,500 REC Involved ECCAS Beneficiary countries South Africa, Angola, Gabon, Namibia, Ethiopia Technical Organizations CAPP Objectives Develop the transmission lines associated to the Inga Site (Inga 3 and Grand Inga) Expected Results 3,800 km line from DRC to South Africa through Angola, Gabon, Namibia and to the North to Eq. Guinea, Cameroon and Chad Project Challenges Coordinated development of generation and transmission Close Coordination between GoDRC and Regional Organization Establishment of single entity SPV for development /operation of Line Regional approach to reduce transit risks Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

SAMBAGALOU HP DAM Cost (Million USD) 300 REC Involved ECOWAS Beneficiary countries Senegal, OMVG countries (Senegal, Guinea, Guinea Bissau, Gambia) Technical Organizations EBID Objectives To provide power to the OMVG Member States Expected Results 128 MW of hydropower capacity, 930 km from the mouth of the Gambia River to supply Senegal, Guinea, Guinea Bissau and Gambia Project Challenges The project structure is still undecided. (PPP, IFI, Public Financing) Financial sustainability of Dam unproven The role of Kaleta Dam in project structure uncertain The political support at OMVG and WAPP level is strong; Country political commitment of the countries changing over time   Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

WEST AFRICAN POWER TRANSMISSION CORRIDOR Cost (Million USD) 1,200 REC Involved ECOWAS Beneficiary countries Guinea,Guinea Bissau, Gambia, Sierra Leone, Liberia, Côte d’ivoire, Ghana Technical Organizations WAPP, OMVS Objectives Ensure transmission between the countries and transport regional energy to ECOWAS countries Expected Results 2,000 km line along the coast connecting with the existing Ghana Nigeria line with a capacity of 1,000 MW Project Challenges Coordination between WAPP, OMVS and the Governments The lack of a single point of responsibility creditworthiness of the power sector in Guinea Bissau, Guinea and The Gambia not established Establishment of single entity SPV for development /operation of Line Link sufficient generation capacities in Guinea and Cote d’Ivoire Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

NORTH AFRICA TRANSMISSION Cost (Million USD) 1,200 REC Involved UMA Beneficiary countries Morocco, Algeria, Tunisia, Libya, Egypt Technical Organizations COMELEC Objectives Ensure transmission between the countries and transport regional energy to UMA countries Expected Results 2,700 km line from Morocco to Egypt through Algeria, Tunisia and Libya Project Challenges Clarify role of COMELEC and the Governments Establish Trade frameworks and develop Agreements for the exchanges Regional versus National power market development advantages Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

BATOKA GORGE HP DAM Cost (Million USD) 2800 REC Involved COMESA/EAC Beneficiary countries Zambia/Zimbabwe Zambezi basin Technical Organizations EAPP/ Zambesi River Authority Objectives To increase generation capacity and reduce reliance on electricity imports and improve generation mix Expected Results construction of a 181 meter gravity dam; installation of 800 MW (4 x 200 MW units) for both Zimbabwe and Zambia. Transmission lines Project Challenges Mandate of Zambesi River Authority (ZRA) to raise financing or implement capital projects Special Purpose Vehicle to raise financing and implement the project yet to be created Poor Creditworthiness of participating utilities, ZESA and ZESCO Zimbabwe government classification with IFIs as defaulting Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

RUZZIZI III Cost (Million USD) 450 REC Involved COMESA/EAC Beneficiary countries Rwanda/DRC Technical Organizations CEPGL, EGL Objectives Share power between Rwanda, Burundi and DRC promoted by CEPGL and develop local renewable energy as well as regulation of water basin Expected Results Hydroelectric plant with a capacity of 145 MW Project Challenges Resources limitation of EGL for needs of the project The studies were launched to review the interconnection of South Kivu and North Kivu and their interface with the CEPGL interconnected network. Finalization of Establishment of a Basin Authority, necessary Finalized selection of preferered investors for PPP Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

RUSUMO FALLS Cost (Million USD) 360 REC Involved COMESA/EAC Beneficiary countries Nile River Basin Countries Technical Organizations NELSAP Objectives Provide inexpensive electricity and improve energy security in the region Expected Results dam and hydro-electric power station of about 61 MW on the Kagera River at Rusumo Falls; Power lines connecting the power plant to the electricity grids of Burundi, Rwanda and Tanzania. Project Challenges Power sharing agreement between Burundi, Rwanda and Tanzania Environmental issues related to flooding (could affect wetlands downstream, including in the Akagera National Park) Reservoir have a negligible effect on net evaporation Issues: Updated Status of Project; Roles of Utility, RECs and Power Pool

Overview of Presentation PIDA Priority Action Plan 1 Projects synopsis 2 Implementation Issues 3

Roles of Utilities and Power Pools Projects Fiches - Update - Package - Fill gaps (physical and soft) Commitments and Needs - Capacity needs - Reforms needs - Project Preparation Funding + Actions - Tariffs - Creditworthiness - Maintenance and Operation Influencing, Making Commitments , Acting together…

MERCI OBRIGADO THANK YOU شكرا A time for action MERCI OBRIGADO THANK YOU شكرا