RA VI Migration Plan
Specific features of RA VI Migration Plan
National Migration Plan
Observations
Telecommunications
Data Processing
BUFR/CREX SW and validation service
Role of RA VI DCPCs (or a GISC)
WMO Information System NC may be connected to a DCPC or a GISC.
TDCF and XML
Code Migration Schedule Category Category 1: common Category 2: satellite Category 3: aviation Category 4: maritime Category 5: miscellaneous Lists of TAC Schedule SYNOP SYNOP MOBIL PILOT PILOT MOBIL TEMP TEMP MOBIL TEMP DROP CLIMAT CLIMAT TEMP SAREP SATEM SARAD SATOB METAR SPECI TAF AMDAR SHIP CLIMAT SHIP PILOT SHIP TEMP SHIP CLIMAT TEMP SHIP BUOY TRACKOB BATHY TESAC WAVEOB RADOB IAC IAC FLEET GRID RADOF Start of experimental exchange Nov. 2002 Nov. 2007 Nov. 2002 Nov. 2005 Nov. 2004 operational Exchange Nov. 2010 ? Nov. 2003 Nov. 2006 Migration complete Nov. 2010 Nov. 2016 ? Nov. 2012 Nov. 2008
Thank you for your attention