Matrix Processor / Backplane Design Details

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

New Corporate Identity Poster Design Department of Physics and Astronomy, University College London Erdem Motuk, Martin Postranecky, Matthew Warren, Matthew.
Sundance Multiprocessor Technology SMT702 + SMT712.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
ESODAC Study for a new ESO Detector Array Controller.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Inter TEL62 communication M. Raggi, M. Piccini, F. Gonnella 16 th October 2013 TDAQ Working Group Meeting.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Peripheral Busses COMP Jamie Curtis. PC Busses ISA is the first generation bus 8 bit on IBM XT 16 bit on 286 or above (16MB/s) Extended through.
Future DAQ Directions David Bailey for the CALICE DAQ Group.
Preliminary Design Review: Hub Implementation Dan Edmunds, Wade Fisher, Yuri Ermoline, Philippe Laurens Michigan State University 01-Oct-2014.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Agata Week – LNL 14 November 2007 Global Readout System for the AGATA experiment M. Bellato a a INFN Sez. di Padova, Padova, Italy.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
BEE3 Updates June 13 th, 2007 Chuck Thacker, John Davis Microsoft Research Chen Chang UC Berkeley.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Slide ‹Nr.› l © 2015 CommAgility & N.A.T. GmbH l All trademarks and logos are property of their respective holders CommAgility and N.A.T. CERN/HPC workshop.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
TPC electronics Status, Plans, Needs Marcus Larwill April
Trigger Hardware Development Modular Trigger Processing Architecture Matt Stettler, Magnus Hansen CERN Costas Foudas, Greg Iles, John Jones Imperial College.
Trigger Workshop: Greg Iles Feb Optical Global Trigger Interface Card Dual CMC card with Virtex 5 LX110T 16 bidirectional.
GTP Update 3 March Cuevas. CPUPP17PP15PP13PP11PP09PP07PP05PP03PP01SWASWBPP02PP04PP06PP08PP10PP12PP14PP16PP18 64x***SSP GTPA GTPB SSP TI DP1LVPECL.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
TBD The Matrix Card Status and Plans Dr. John Jones Princeton University
Trigger for MEG2: status and plans Donato Nicolo` Pisa (on behalf of the Trigger Group) Lepton Flavor Physics with Most Intense DC Muon Beam Fukuoka, 22.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Modular Electronics an overview of modern standards
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
The White Rabbit MCH Javier Serrano on behalf of Tomasz Włostowski
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
LAMB: Hardware & Firmware
E. Hazen - Back-End Report
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
Electronics for MEG-II
LFD Correlator MWA-LFD Kick-off Meeting San Diego 5-June-2006
The Matrix Card and its Applications
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Task T - CMS at LHC Global Calorimeter Trigger
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
MicroTCA A look at different options...
DAQ Interface for uTCA E. Hazen - Boston University
Commodity Flash ADC-FPGA Based Electronics for an
Reconfigurable FPGAs (The Xilinx Virtex II Pro / ProX FPGA family)
Presentation transcript:

Matrix Processor / Backplane Design Details 26.02.2008 John Jones Princeton University Matt Stettler LANL

John Jones (john.jones@cern.ch) Aims Of These Slides Try to summarise/clarify details of the system that have not been previously discussed Clarify the connections on the backplane… …and their relationship to the matrix processor Clock system options JTAG options Ethernet usage Signal standards 26.02.2008 John Jones (john.jones@cern.ch)

John Jones (john.jones@cern.ch) uTCA Specifications uTCA is an AC-coupled serial system Required by specification Default signal standard for serial links is CML Use of any other standard requires card negotiation with the host Signals must be tristated until host ‘agrees’ to power-up This means we can use, e.g. Ethernet on a link, provided we negotiate the protocol with the host Standard for clocks is LVDS Basic specification allows for 21 serial channels and 3 clocks Specification was amended to provide 20 channels and 4 clocks… …however either is still acceptable 26.02.2008 John Jones (john.jones@cern.ch)

John Jones (john.jones@cern.ch) Matrix Processor OptoTX 20 Mindspeed 72x72 Backplane 16 OptoRX 16 20 V5-LXT110 Enet uC Switch has 72 bi-directional links: 16 to OptoTX/RX 16 to V5 MGTs 20 to backplane 20 to V5 LVDS IOBs AC-coupled CML AC-coupled LVDS 26.02.2008 John Jones (john.jones@cern.ch)

Matrix Backplane Design uTCA allows for 3U or 6U implementations In the backplane we take advantage of this to simplify routing Backplane is actually two identical boards Each supports 12 3U full-height cards or 6 6U full-height cards Design is intended to be fully uTCA compliant We can use standard commercial boards as well… Significant difference in the way specifications are supported: Typically routing of links would be handled by a host card (MCH) As we have a switch on the backplane that controls the links, the backplane takes on the full functionality of an MCH There is no need for an MCH slot in this design Dual-redundant power supplies are not included in the current schematic Significantly complicates backplane layout 26.02.2008 John Jones (john.jones@cern.ch)

Matrix (Half-)Backplane – Layout (TTC) Input slot S1 S2 S3 S4 S5 S6 V5 Clk/ Eth Switch Power S12 S11 S10 S9 S8 S7 26.02.2008 John Jones (john.jones@cern.ch)

Matrix Backplane – Switch connections Control V5-LXT110 Slot 1 12 10 5 4 10 Mindspeed 144x144 Slot 2 5 10 12 (TTC) Input slot Slot 3 Backplane switch has 144 bi-directional links: 12x10 (120) to card slots 12 to backplane FPGA 12 to input card slot 26.02.2008 John Jones (john.jones@cern.ch)

Matrix Backplane – Clock Fan-Out 1 Control V5-LXT110 Slot 1 Local OSC 2 1 1 Fractional-N Synthesis 1 4  2 Fan-out Slot 2 2 1 2 2 (TTC) Input slot Slot 3 1 26.02.2008 John Jones (john.jones@cern.ch)

John Jones (john.jones@cern.ch) Comments Use MGTs for high-bandwidth data Isosynchronous but the fastest transport mode Neighbouring slots have 5 links between each of them Can be used for ‘geometric’ processing (e.g. nearest-neighbour) Use Manchester-encoded LVDS for synchronous signal distribution Up to 500MHz throughput in a Virtex 5 Routed through switch – protocol agnostic, works from DC to 4GHz JTAG chain in crate is controlled by FPGA/uController on backplane Automatically routed through active cards Can be reconfigured by changing FPGA settings over Ethernet Accessible from connector on (TTC) input card Backplane FPGA is isolated from chain (separate connector on backplane) If additional clocks needed, use the LVDS signals Can be routed to other cards using switch Cannot be used for MGTs – no obvious reason to have more than two MGT clocks 26.02.2008 John Jones (john.jones@cern.ch)