Work experience presentation

Slides:



Advertisements
Similar presentations
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Advertisements

FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
Storm Preparedness Workshop Verizon Florida, LLC May 23, 2007.
What’s Inside / Coming Attractions
INTRODUCTION SHAREHOLDERS CBI-ELECTRIC AT A GLANCE COMPANIES.
A Path breaking Technology for Network Maintenance and Optimization
The Power Grid ELEC 403 The Citadel Mark McKinney.
1 PSE&G’s Solar 4 All™ Program: Pole-Attached Solar Installations in Your Area December 22, 2009 January 12, 2010.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
New Product Overview Homac STORM SAFE™ Connector Systems Presented by: Presented by: Roy Jazowski - Director of R&D Mark Hammer – Director of Marketing.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Electrical Power Systems
+ Careers in Electricity. + Outcome for today: Outcome EL6.1: Assess personal, societal, economic, and environmental impacts of electricity use in Saskatchewan.
UMKC Senior SUBSTATION DESIGN TEAM
Transmission Lines …….. Conductor Material
1 CREZ COMMUNICATIONS Presented by American Electric Power Telecommunications Engineering Matt WilliamsDon Demand Columbus, OHTulsa, OK.
Electricity Service Delivery 2 Aim To provide students with information to enable them to deal with the effects of electricity at incidents.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Introduction to Construction General Permit Inspections.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
Business Plan OVHL MAINTENANCE by Nedeljko Drakul.
RPG Vision Going for Growth
Senior Design, Spring 2013 Jane Peters Riley Groves Jared Jasper Matt Murphy Muzi Li.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
FPSC Electric Utility Infrastructure Workshop Florida Municipal Electric Utilities Alan Shaffer Assistant General Manager - Delivery Lakeland Electric.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Hurricane Season Preparation Briefing Florida Public Service Commission May 1, 2008 Kevin Wailes General Manager – Electric Utility.
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
Vattenfall Services Company Presentation Confidentiality class: None (C1)
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
Grid maintenance expenses Commerce Commission Workshop 2 March 2010.
ELECTRICAL INSTRUMENTS ( service and utilization )
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Module 11 -Cost Estimation This module covers how to estimate project costs including: –Equipment costs – combination of procurement and installation (including.
Project Costs 2016 Transmission & Distribution Benchmarking
Sub Station.
Uniper Energy Services
Utility Needs and Smart Grid for Major Storm Events
SUB-STATIONS.
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Power Generation and Distribution
Florida Public Service Commission
Hurricane Preparedness Plan 2008
& Transient Voltage Recovery Capacitors
Electricity Distribution Network Design Training & Courses
Company Overview Big Green Group® (“BGG”) is led by President and CEO Michael A. Dennis. BGG is headquartered in New Jersey and its business operations.
Pacific Power Seismic Preparedness Update
Scientific Research and Design Republican Unitary Enterprise BELENERGOSETPROJEKT besp.by.
EHV Transmission Equipments
IETC Design-Build Electrical Contractor
2007 Hurricane Season Preparedness Briefing
Review of Distribution Network Protection
TxMAG presentation
Presentation transcript:

Work experience presentation Wise energy company Work experience presentation Transmission · Substation · Distribution EPC & Design/Build · Maintenance

ABOUT COMPANY WISE ENERGY was founded in 2010, has aim to bring high level of service in the energy and power sector. For international and local clients . Our services is -Transmission lines · Substations · Distribution- EPC & Design/Build · Maintenance -Equipment supply. In the context of international trade and cooperation with foreign contractors, WISE ENERGY has been started from Turkey, with bringing services in Azerbaijan ,Turkmenistan, Kyrgyzstan, Kazakhstan ,Russian and Europe The desire and honor of WISE ENERGY is reaching the best level of customer satisfaction.

TRANSMISSION CONSTRUCTION AND MAINTENANCE Construction and maintenance of overhead high-voltage transmission lines through 1200kV is our specialty. We build and service major assets for many of the nation’s largest utilities, regional cooperatives and municipalities and are known for safe practices, efficiency and exceeding our clients’ expectations. TRANSMISSION LINE SERVICES 1- Pre-construction design and engineering consulting 2- Right-of-way (ROW) preparation and clearing 3- Environmental mitigation and compliance 4- Turnkey foundation installation 5- Wood, steel and concrete pole erection 6- Lattice tower assembly and erection 7- Wire stringing, sagging, clipping and dead-ending 8- Reconductoring of existing transmission lines 9- Energization and testing 10- 24/7 Emergency and storm response

OUR PROJECTS 0.4/1200KV

OUR PROJECTS 0.4/1200KV

SUBSTATION CONSTRUCTION AND MAINTENANCE Power Line Services provides complete substation services in construction, design/build and commissioning of high-voltage substations and related equipment. Our skilled substation technicians, combined with our fleet of specialized equipment for low-overhead clearances, provide construction services to utilities, municipalities, electric cooperatives and industrial customers for substations ranging from 0.4kV to 1200kV. SUBSTATION SERVICES 1- Substation design/build and upgrades 2- GIS, SVC and HVDC installation 3- Steel erection and bus welding 4 -Installation of equipment, including switches, metal-clad switches, circuit breakers, instrumentation, SCADA and control panels 5- Power transformer relocation, assembly and degasification 6- 24/7 Emergency and storm response  

OUR PROJECTS

OUR PROJECTS

OUR PROJECTS

STORM RESPONSE With assets located throughout the RUSSIA/EUROPE Power Line Services is able to mobilize our fleet of equipment and support vehicles rapidly across a wide geography. Our skilled transmission and distribution crews have developed a history of providing our clients with safe, high-quality performance, even under the most adverse weather conditions experienced during storm response. STORM RESPONSE SERVICES 24/7 Dispatch for emergency response Proven experience in restoration of transmission and distribution infrastructure throughout RUSSIA .IRAG, the Gulf Coast and the Midwest Multi-year storm contracts with several major utilities Teams with sister MTL Group Company Air3 for helicopter-based damage assessments, repairs and reconstruction Teams with sister MTL Group Company Artuser Services to provide amphibious response and rebuilding of foundations and structures

EPC & DESIGN/BUILD Power Line Services has extensive Design/Build experience for transmission lines, substations and distribution systems. The PLS team can provide turnkey facilities that will meet the owner’s requirements, budget and schedule. The Design/Build model provides owners with the security needed to bring projects in successfully. Benefits for the owner include the following: EPC & DESIGN/BUILD SERVICES Reduction of bid to completion time Comprehensive pre-construction planning Allows for strong communication between the owner, engineers and construction team Coordinated project that reduces project risk Single point of contact

COMPLETED PROJECTS PROJECT - Cyprus PROJECT TYPE- SUBSTATION DISCRIPTION - Below grade work to include conduit, foundation, grounding grid, cable trench, all excavation is Hydro, Top rock installation. PROJECT - Turkey DISCRIPTION - Construction of approximately 70 km of 500kV transmission line PROJECT - Russia DISCRIPTION- Expansion of 800kv substation into a 4 breaker ring bus. Foundation, grounding, conduit, cable trench, structures, equipment and bus work for substation.

COMPLETED PROJECTS PROJECT - Benin PROJECT TYPE- SUBSTATION DISCRIPTION- Provide for the installations of foundations, steel structure, equipment, bus work, control cable, bellow and above grade grounding and conduit PROJECT- Portugal DISCRIPTION- Excavate and exploratory work with several specialized subcontractors to find the location of the fault on (2) 230kV underground HV cables. The lines both go from Gila Substation to Citgo Refinery under the Corpus Christi ship channel and are main feeds of power for Citgo.

COMPLETED PROJECTS PROJECT - Iraq PROJECT TYPE- SUBSTATION DISCRIPTION- BKRs, (16) group operated air break SWs; (3) motorized, (15) 500kV CCVTs, (2) 500kV line PROJECT- Kazakhstan PROJECT TYPE- TRANSMISSION DISCRIPTION- Replacement of 4.1 km of double and single circuit 138kV transmission line. Scope of work includes ROW access, ROW restoration, material receiving, material hauling, anchor bolt foundations, direct embeds, new 1590 ACSR conductor, 3/8" Static, conductor removal, and structure removal. PROJECT- Russia DISCRIPTION - Construct 150km of 345KV transmission line on steel monopoles with drilled pier foundations. Conductor is bundled 1590 with (1) 7#8 shield wire (1) OPGW

COMPLETED PROJECTS PROJECT - Georgia (Alba-1) PROJECT TYPE- TRANSMISSION DISCRIPTION- Restoration of RFS to West Tephlis 500kV Transmission Line. PROJECT - Russia (Yamal) DISCRIPTION- Construction of 100 km transmission line (1200kv) PROJECT- Azerbaijan (cable way) PROJECT TYPE- SUBSTATION DISCRIPTION- Provide for the installations of foundations, steel structure, equipment, bus work, control cable, bellow and above grade grounding and conduit

COMPLETED PROJECTS PROJECT - Benin PROJECT TYPE- TRANSMISSION DISCRIPTION- 120km OF 138Kv Transmission Line. PROJECT- Russia PROJECT TYPE-TRANSMISSION DISCRIPTION- Rebuild 500kV transmission line using concrete monopoles and 959 ACSS. Includes installation of 6 anchor bold foundations with steel poles for use as self-supporting dead ends. Also replacing 35 km of static wire with a new 48 count OPGW. PROJECT - Azerbaijan DISCRIPTION- 11KV transmission line that will connect a new substation to the AEP system. It includes installing 4 direct imbed tangent structures and 2 steel dead end poles on foundation previously installed by others. The overall length of the job is less than 50 km.