CHANGING PROJECT DELIVERY SYSTEMS

Slides:



Advertisements
Similar presentations
? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Organization of Primary Entities
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
Building Success Stories: A Survey of Construction Delivery Methods PRESENTED BY: BLAKE G. POWELL.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Click here to add text The Single Prime Contractor Delivery Method Ohio School Facilities Commission Ohio Construction Reform.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Your Deliver Method... …Pick it Early
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Honoraria for Design Build Projects Methodology Assessment Matrix.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
BCT 100 Overview of the Construction Industry. The Construction Industry What is the ‘Construction Industry’? Who works in this industry? Why is it important?
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Agency Construction Management :CM NOT AT-RISK
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
You passed the Bond or secured some funds What do we do now? 2014.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
Kurt Krause. Topics of Discussion 1.Project Delivery Method Definition 2.Brief History 3.Alternative Project Delivery Trends 4.Key Drivers of APDM 5.Risk.
UTILIZING CONSTRUCTION MANAGER AT RISK IN GREENSBORO, NORTH CAROLINA.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Integrated Project Estimating & Scheduling By Dr. Awad S. Hanna Professor and Chair of Construction Engineering and Management Program Department of Civil.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
TYPES OF CONTRACT DR. Nabil Dmaidi.
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
PROJECT DELIVERY METHODS
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Construction Management
Project Delivery Systems
Nepal administrative staff college
The Project Development Process:
Traditional Steps Leading To A Bid Document
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
MULTISPORTS CENTRE PRESENTATION
Construction Project Delivery Methods
Building Construction Delivery Systems
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

CHANGING PROJECT DELIVERY SYSTEMS by Nabil Dmaidi Civil Engineering Department An-Najah National university DR. Nabil Dmaidi DR. Nabil Dmaidi

Traditional Method (Design_then _Build) Also known as Design_Bid_Build or hard money or Competitive bid contract. Has three sequential phases Design - Bid - Construction Architect-Engineer hired Bid/Award Design Phase Construction Phase Single Construction Contract DR. Nabil Dmaidi DR. Nabil Dmaidi

Traditional Organization of Construction A/E design consultant Build the project on paper A/E general supervision Specialist and consultants Owner user Contractor Construction Industry participation bidding Engineering and design Feasibility Contract Use of facility documents Planning, engineering, and management In-house and consulting services Contract design and supervision Single bid package Contract construction Project approval and selection of A/E Call for bids Bid acceptance and notice to proceed Project completion and acceptance DR. Nabil Dmaidi

Traditional Organization Owner A/E General Contractor Sub Contractor Sub Contractor Sub Contractor Sub Contractor Sub Contractor DR. Nabil Dmaidi DR. Nabil Dmaidi

Estimating Needs for Design-Bid-Build Complete set of drawings Specification Other contract documents General conditions Special conditions Addenda Others (soil report) DR. Nabil Dmaidi DR. Nabil Dmaidi

Hierarchy of Contract Document Addenda Special Conditions General Conditions Specification Drawing DR. Nabil Dmaidi

Single Source Delivery 1. Design Build 2.Space Engineer/Procure/Construct (EPC) EPC model#1 (Pure CM, Construction Management) EPC model#2 (General Contractor acting as construction manager) EPC model#3 (A/E acting as CM) EPC model #4 (CM acting as Contractor) 3.Others DR. Nabil Dmaidi DR. Nabil Dmaidi

Fast Track or Phased Construction Method Concepts Working Drawing Design Phase CM and A/E or DB hired Construction Phase Variable separate construction contracts DR. Nabil Dmaidi DR. Nabil Dmaidi

Level of Influence Time Project Cost Influence Ability to Influence DR. Nabil Dmaidi DR. Nabil Dmaidi

1. Design Build Owner General Design Contractor Own Sub-Contractor Engineer Contractor Design General Contractor Own Force Work Sub-Contractor Single firm responsible for both design and construction. DR. Nabil Dmaidi DR. Nabil Dmaidi

Form of Design_Build Organization Owner Owner Owner Owner Design-Builder (Architect/Engineer) Design-Builder (Contractor) Design-Builder (Joint Venture) Design-Builder (DB Firm) Contractor Architect/ Engineer DR. Nabil Dmaidi DR. Nabil Dmaidi

Advantages of Design & Build for Owners Owner only has to communicate with one entity for the entire project Total project duration can be reduced because phased construction is easier to implement.(Fast tracking) Integration of construction planning and design phases Claims reduction (reduction of adversary relationships) Innovation in design and construction can be encouraged Risk assigned to party best able to manage that risk Reduce change orders DR. Nabil Dmaidi DR. Nabil Dmaidi

Disadvantages of DB for Owners Fewer checks and balances, owner must rely on integrity of the design-build firm Reduced owner involvement in the design process may result in less than expected results All your eggs in one basket DR. Nabil Dmaidi DR. Nabil Dmaidi

Advantages to a design-build organization Improved constructibility through design/construction integration A specialized organization can be developed that has a specific expertise which will be attractive to specific market areas Reduction of negligence claims between the Architect/Engineer and the construction contractor since they are under one umbrella firm Ability to react rapidly to change in scope DR. Nabil Dmaidi DR. Nabil Dmaidi

Disadvantages for the design-build firm Acceptance of additional project risk Possible premature release of bid packages (when using fast track) which can lead to increased errors in the plans and extras Scope of work changes can be difficult to identify under DB/ fast track construction Heavy overhead due to large multi-disciplined staff requirements DR. Nabil Dmaidi DR. Nabil Dmaidi

2. Engineer/Procure/Construct (EPC) Pure CM Owner In-House Design or Eng.. Firm CM Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor EPC Model #1 DR. Nabil Dmaidi DR. Nabil Dmaidi

Cost Saving due to Competitive Bidding 120,000 100,000 105,000 Bid Pkg 1 $ 95,000 100,000 95,000 195,000 200,000 Bid Pkg 2 $ 195,000 210,000 202,000 215,000 220,000 225,000 Best Bids Received Best Bids Received Bid Pkg 3 $ 220,000 235,000 230,000 240,000 350,000 325,000 Bid Pkg 4 $ 320,000 200,000 360,000 90,000 95,000 220,000 325,000 320,000 325,000 230,000 200,000 325,000 General Contractor 1 $ 840,000 General Contractor 2 $ 845,000 Total Project Cost $ 825,000 Saves $15,000 By soliciting more bids and by passing the savings directly to the owner, the owner saves $15,000 compared to the best general contractor price. This example illustrates four bid packages. Typical commercial building projects may have thirty or more bid packages. DR. Nabil Dmaidi

2. Engineer/Procure/Construct (EPC) (cont.) General Contractor acting as CM Owner Engineer/Procure Construct Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor EPC Model #2 DR. Nabil Dmaidi DR. Nabil Dmaidi

Other Models of Single Source Delivery Systems A/E acting as CM Owner A/E and CM Prime Contractor EPC Model #3 DR. Nabil Dmaidi DR. Nabil Dmaidi

Other Models of Single Source Delivery Systems (cont.) CM acting as Contractor Owner A/E CM Prime Contractors Contractor EPC Model #4 DR. Nabil Dmaidi DR. Nabil Dmaidi

Others Owner Builder Owner C.M. CM Owner Owner A/E Design Department Construction Department Prime Contractors Contractors Optional Own Force Work Subs Owner Builder Owner C.M. DR. Nabil Dmaidi DR. Nabil Dmaidi

Estimating Needs for Single Source Delivery Conceptual Design Assemblies cost data Update your estimate as the design develops Value engineering studies DR. Nabil Dmaidi DR. Nabil Dmaidi

Design-Build Issues 1. Prequalification The reduction of the number of possible bidders to a small group of serious, qualified bidders improves the effectiveness of the selection process. DR. Nabil Dmaidi DR. Nabil Dmaidi

Design-Build Issues (cont.) 2. Proposal Evaluation Cost only Cost and time Multiparameter (quality, safety…etc.) DR. Nabil Dmaidi DR. Nabil Dmaidi

Innovative Contracting Methods Multiparameter Bidding (A+B+C) Multiparameter bidding is a bidding system within the competitive bidding concept where a successful bidder is selected based on the combined cost, time and quality. DR. Nabil Dmaidi DR. Nabil Dmaidi

Example of Multi-parameter Bidding Lowest Cumulative Bid Cost DR. Nabil Dmaidi DR. Nabil Dmaidi

Design-Build Issues (cont.) 3. Legal a. Insurance and Bonding The contractor should have the proper insurance to cover design deficiencies or cover construction errors. b. Conflict of Interest Design-build eliminates the checks and balances of the traditional methods. DR. Nabil Dmaidi DR. Nabil Dmaidi

Innovative Contracting Methods (cont.) Construction Warranties (DBW) A warranty is a guarantee of the integrity of a project and of the maker responsibility for the replacement or repair of deficiencies for a period longer than the traditional 1-year warranty. It is different than project maintenance warranties that provide routine maintenance DR. Nabil Dmaidi DR. Nabil Dmaidi