CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015 jindp@ihep.ac.cn.

Slides:



Advertisements
Similar presentations
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Advertisements

SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
SNS Integrated Control System MPS - Commissioning Plans 1. Quick MPS System Overview 2. Run Permit System 3. Fast Protect Auto Reset 4. Fast Protect Latched.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
ESS DTL beam commissioning
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
ORNL is managed by UT-Battelle for the US Department of Energy SNS Beam Diagnostics: Ten Years After Commissioning A. Aleksandrov Oak Ridge National Laboratory,
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Anders Sunesson RF Group ESS Accelerator Division
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
CSNS Timing System G. Lei Feb Page CSNS Timing System Feb Contents of this talk Breif introduction to CSNS Requirement investigation Strategy:
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
The Preparation for CSNS Accelerator Commissioning Sheng Wang June 8, 2015, Dongguan.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
ESS LLRF and Beam Interaction
Report Technical Director Storage-Ring-Installation Completed
MicroTCA Development and Status
Diagnostic & Control Status
Laboratorio per dottorandi 2017 Particle Accelerators Control System
Current Status of IPM-Linac Control System
Overview and System Design for ESS LLRF Systems
ATF/ATF2 Control System
BE-BI Software for LINAC4
Status of the Front End Test Stand April 2007.
SNS Timing System EPICS Workshop April 28, 2005 Coles Sibley
The EPICS running envirionments in the five accelerator projects
Fill-pattern Control System for KEKB
UITF MPS system requirements
Considerations on Beam Diagnostics Physics
RF Local Protection System
Ion Source and LEBT control system topology, Interlock strategy
MPS commissioning at ESS
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
The spoke CM tests at FREIA
European Spallation Source ERIC
Control System Overview Hamid Shoaee LCLS Control System Manager
UITF Conduct of Operations Review
TS2 PSS; update on concepts of operation and system's architecture
RF introduction Anders Sunesson RF group leader
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015 jindp@ihep.ac.cn xutg@ihep.ac.cn

Outline Overall design and progress of the CSNS accelerator control and beam instrumentation systems Next to do Summary 2

Architecture of control system FPS Timing MPS LAN 3

Overall design and progress Architecture layers. Global control software : EPICS based. 4

Overall design and progress Tasks of the control system. Network based global control backbone. Timing system. Machine protection system. Global data archiving, alarms, and consultation. Some equipment level controls : front end, vacuum, power supplies remote, LINAC RF remote, injection and extraction, collimators and stripping foils remote … 5

Overall design and progress Progress of control system Temporary network for LINAC control and commissioning built and used. Temporary data archiver settled. Part of timing system built and used. Control of front end completed and used. Vacuum control of front end completed and used. 6

Overall design and progress Progress of control system Part of PS remote control built and used. LLRF remote control built and used. Part of MPS/FPS (Fast Protection System) built and under test. Other work goes on smoothly according to the progress of the different equipment. 7

Overall design and progress Overall network topology. 8

Overall design and progress Network for LINAC control and commissioning. 9

Overall design and progress Timing system : structure. Event based. 10

Overall design and progress Timing system : LINAC. 11

Overall design and progress Photo of temporary main timing station. Home made 324MHz Power Amplifier R&S Signal Generator To RF Ref. Line VME FOUT Module MRF EVG-230 Module 12

Overall design and progress Timing system : OPIs. 13

Overall design and progress Front end control : structure. 14

Overall design and progress Photos of front end control in use. Ion source hall. 15

Overall design and progress Machine protection system. Requirements for drift tubes, bunchers and de-buncher. Un-chopped beam, 15mA Beam size : 0.2cm * 0.2cm RMS Hitting the components directly 17s 5s due to Bragg Peak 10s if chopped Critical most cases 16

Overall design and progress Machine protection system : architecture. 17

Overall design and progress Distribution of MPS part (PLC based). 18

Overall design and progress Distribution of FPS part (FPGA and high speed serial link based). 19

Overall design and progress FPS : How to stop the beam and recover FPS IS Extraction Timing IS HV Control Below 10kV? RFQ Power LLRF Beam Gate Interlock Feedback Reset 20

Overall design and progress Opt. adaptor FPS Central Station : Field photo Opt. transceiver Main Board VME OPI IS Mother Board MPS Mother Board Timing Mother Board LLRF Mother Board LLRF Mother Board BLM Mother Board 21

Overall design and progress FPS : Illustration of connections Daughter card Main board Main board Mother board 22

Overall design and progress Heart-beat functions for real-time safety Heart-beat signal generation in the CPLD on the daughter card of front end Heart-beat signal check and counting in the FPGA on the main board at central station 23

Overall design and progress Power supplies remote control. PS cabinets OPI 24

Overall design and progress LINAC RF remote control. Codes embedded in LINAC LLRF local control with C#. 25

Overall design and progress LINAC RF remote control : OPI. 26

Overall design and progress Distribution of beam monitoring and measurement devices. 27

Overall design and progress Distribution of beam loss monitors. 28

Overall design and progress Number of beam instrumentation devices along the beam. BCT BPM BLM FBLM FCT WS EM Foil MWPM WCM LEBT 2 1 MEBT 7 3 5 4 DTL 12 DTL temp. LRBT 20 28 8 tune exciter RCS 38 72 9 RTBT 33 50 29

Overall design and progress Acquisition and electronics system of beam instrumentation. Mostly NI PXI-express based with windows and LabView. IOCs in PXI-express controller. VME/Linux based for BPMs in RCS, IOC in upper server with Windows/Linux + LabView. Common data will be stored in global Archiver, large size data will be stored in files via NFS for further analysis. Waveform and average value readout for frond end devices with Max 1MHz. 3030

Overall design and progress Till now, the devices for front end (Ion source, LEBT, RFQ, MEBT) have been installed. A Faraday cup is installed for temporary beam dump. BPM, beam emittance and beam current data have been got. Wire scanner have been put into use. 31

Overall design and progress Beam instrumentation devices installed in the Ion Source hall. 32

Overall design and progress Results from the wire scanner. Wire vertical Wire 45-degree Wire horizontal 3333

Overall design and progress Results of emittance measurement. 34

Next to do Installation and commissioning of devices and equipment after MEBT. Further debug of the beam instrumentation devices installed to improve performance. Installation in the Central Control Room will start around this September. 3535

Summary Design and progress of the control and beam instrumentation systems are briefly introduced. Equipment for the front end have been installed and put into use. All parts run steadily till now. Much work needs to be done next. Thanks a lot! 3636