Software Life Cycle Risk Management

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

Transition from Q1- 8th to Q1- 9th edition
Define & Compare Flowcharts of Each Method Tom Delong.
OHSAS
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
TEMPUS ME-TEMPUS-JPHES
Software Quality Matters Ronan Fitzpatrick School of Computing Dublin Institute of Technology.
Lecture Nine Database Planning, Design, and Administration
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
8 Managing Risk Teaching Strategies
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
ISO 9000 Certification ISO 9001 and ISO
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
ISO 9001:2008: Key changes and transition process
S/W Project Management
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Introduction to Software Quality Assurance (SQA)
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
ISO 9001: 2000 Quality Management Systems ‑ Guidelines for performance improvement and ISO 9001:2000-Quality management system-requirements By Prof.:
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
ISO 14001:2004, Environmental Management System
“Software Life Cycle Processes”
This project has been assisted by the New South Wales Government through its Energy Efficiency Training Program Prepared by Energy Efficiency through Product.
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
IV&V Facility 26SEP071 Validation Workshop Dr. Butch Caffall Director, NASA IV&V Facility 26SEP07.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Over View of CENELC Standards for Signalling Applications
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
TC176/IAF ISO 9001:2000 Auditing Practices Group.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
10 June 2016 | Proprietary and confidential information. © Mphasis 2013 Overview of ISO 9001:2008 Mar Internal Auditor Training.
Configuration Control (Aliases: change control, change management )
Accounting systems design & evaluation 9434SB 18 March 2002.
Chapter 6 Internal Control in a Financial Statement Audit McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
TEMPUS ME-TEMPUS-JPHES “IMPROVEMENT OF PARTNERSHIP WITH ENTERPISES BY ENHENCEMENT OF A REGIONAL QUALITY MANAGEMENT POTENTIALS IN WBC” TEMPUS
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Software Engineering — Software Life Cycle Processes — Maintenance
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
SQA project process standards IEEE software engineering standards
Driving Quality (IV&V, QA)
ISO 9001:2015 Risk-based thinking
ISO 9001:2015 Risk-based thinking
Role of The Software Development Plan (SDP)
Training Course on Integrated Management System for Regulatory Body
JSA Enhancements SIS competencies May, 2012.
Security SIG in MTS 05th November 2013 DEG/MTS RISK-BASED SECURITY TESTING Fraunhofer FOKUS.
SQA project process standards IEEE software engineering standards
8 Managing Risk (Premium).
Software Project Management
KMCO CAPA System Training
GDPR - New Data Protection Regulation
Software Quality Assurance Plans
Agenda Who are we? 1 Introductions Journey so far 2
Lockheed Martin Canada’s SMB Mentoring Program
ISO/IEC IEEE/EIA Software Life Cycle Processes Supporting Life Cycle Processes IEEE Supporting Processes.
ISO 9001:2015 Risk-based thinking
ISO 9001:2015 Risk-based thinking
Operationalizing Export Certification and Regionalization Programmes
Discussion points for Interpretation Document on Cybersecurity
HHS Child Welfare National IT Managers' Meeting
AICT5 – eProject Project Planning for ICT
1) Application of Cybersecurity Regulation for new registrations
ISO 45001:2018 The importance of a Safety Management System
Presentation transcript:

Software Life Cycle Risk Management IEEE Std 1540 - 2001

Content Introduction Scope and Purpose Field of Application Conformance and Disclaimer Risk Management in the Software Life Cycle Activities 2018-09-20

Introduction Purpose of Risk Management Tool for: To identify potential managerial and technical problems before they occur so that actions can be taken that reduce or eliminate the likelihood and/or impact of these problems should they occur. Tool for: continuously determining the feasibility of project plans, improving the search for and identification of potential problems that can affect software lifecycle activities and the quality and performance of software products, improving the active management of software projects. 2018-09-20

Scope and Purpose 1.1 Scope 1.2 Purpose software acquisition, supply, development, operations, and maintenance. Technical and managerial personnel throughout an organization apply this standard. 1.2 Purpose To provide software suppliers, acquirers, developers, and managers with a single set of process requirements suitable for the management of risks. 2018-09-20

1.3 Field of application Throughout the software life cycle does not require any particular lifecycle For application to all appropriate projects or for use in an individual project. Useful for the management of both system-level and organization-level risks. May be applied in conjunction with the IEEE/EIA 12207 series of standards or applied independently. Should be integrated with organization’s problem management approach 2018-09-20

Conformance and Disclaimer By implementing a process, demonstrating through plans and performance all of the requirements (specified as mandatory by the word shall) in the activities and tasks described in Clause 5. 1.5 Disclaimer This standard does not ensure an absence of software related or other risks. Conformance does not absolve any party from any social, moral, financial, or legal obligation. 2018-09-20

5. Risk Management in the Software Life Cycle 5.1 Risk Management Process Activities Plan and implement risk management Manage the project risk Perform risk analysis Perform risk monitoring Perform risk treatment Evaluate the risk management process 2018-09-20

Risk Management Activities 2018-09-20