Peer Review Agenda (Suggested).

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
From Research Prototype to Production
GLAST Large Area Telescope:
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
GLAST Large Area Telescope:
Camera PDR/CD1 Planning 19 September 2008
Accelerator Readiness Review October 31, 2006
Supportability Design Considerations
SPF MAG Quarterly Report – Feb 2015
Session 5b Dr. Dan C. Surber, ESEP
0.0 Instrument Suite Name Presenter’s name
2K CB FDR Overview:  Agenda, Charge, Review Process
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Failure and Design Jaime Baber October 12, 2000
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Management Breakout: MREFC Budget Summary Victor L
BRIAN KLATT MISSION ASSURANCE MANAGER
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Lockheed Martin Canada’s SMB Mentoring Program
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
GLAST Large Area Telescope:
Introduction and Overview
PSS verification and validation
Instrument Overview Larry Springer HMI Program Manager
Command and Data Handling
DOE Review of the LCLS Project October 2006
Presentation transcript:

Peer Review Agenda (Suggested)

Suggested Peer Review Agenda (1/3) Subsystem introduction & overview Schedule summary Critical path analysis Subsystem engineering Overview - identify major subsystem and interface design changes since DPDR CCB’s (approved since DPDR and pending) Requirements and budget allocation updates Subsystem ICDs, drawings, and procedures status Subsystem performance analysis Simulation updates Design trades analysis performed Verification matrix Reliability results FMEA Worst case analysis or part stress results Fault tree analysis or single point failure analysis results Subsystem technical risk assessment & mitigation plan Engineering model assessment

Suggested Peer Review Agenda (2/3) Major assemblies/elements within the subsystem Requirement/compliance matrix – update since DPDR Allocated budgets (mass, power, c.g., etc..) – updates from EM or actual Mechanical & electronic design changes since DPDR Performance modeling updates (structural, thermal, electronics) Major assemblies/component Performance summaries Performance prediction vs. requirement Engineering model test results Test data discussion Test result as compared to expected performance/prediction Design changes resulting from EM test Qualification plan (including vibration, thermal, EMI/EMC, etc..) Procurement plan & Status Identify critical component need dates vs. delivery dates Summarize procurement contract status EEE parts and material approval status/readiness Long lead part requirement/procurement

Suggested Peer Review Agenda (3/3) Subsystem assemblies (fabrication plan) Assembly flow overview & facilities status Production readiness reviews Performed or planned Test plan Test Equipment (mechanical & electrical) preparation MGSE and EGSE status Rack elevation, cables, power, test adapter Test software and scripts status Processes & procedures Transportation and handling plan/procedures Transportation container design Subsystem product assurance Non-conformance reporting tracking and readiness Production travelers

“We are ready to proceed to subsystem fabrication” Conclusion Design Status Demonstrate evolution & heritage of “Final Design” Demonstrate compliance of system performance Closure of Actions from PDR & DPDR Complete ICDs Final implementation plans EM Prototype Flight Units Spares Complete design analysis Fabrication Status Qualification/Environmental Test Plan and Flow Control methods for all safety hazards identified FMEA Worst case analysis Fracture control Shipping environment and mode of transportation √ √ √ √ √ √ √ √ √ √ √ √ “We are ready to proceed to subsystem fabrication”