Metropolitan Planning Organization Sarasota/Manatee Metropolitan Planning Organization 2018 Project Priorities
Project Priorities Process F F I
Federal Aid Highway Apportionments Three funding streams distributed through MPOs National Highway Performance Program Surface Transportation Block Grant (50%) Interstate Maintenance Highway Safety Improvement Program National Highway Freight Program Transportation Alternatives Congestion Mitigation Metropolitan Planning Motor Fuel Tax – primary source of funding for both highway and transit Other Miscellaneous Sources – tires, new tractor/trailer purchases, etc. Deposited into Federal Highway Trust Fund Allocated via complex funding formulas in Federal Authorization Act Fixing America’s Surface Transportation (FAST) Act
Total FY 2017-2021 Adopted 5-Year Work Program $46,609M Funding Sources for Commitments (in millions) I MPOs Projects using federal funds that may only be spent in large urban areas of over 200,000 population are identified for inclusion in the TIPs and STIP by MPOs in cooperation with FDOT. Projects using all other federal funds are identified for inclusion in the TIPs and STIP by FDOT in consultation with MPOs. 23 CFR Part 450 defines “consultation” in this context to mean “the party confers with other identified parties in accordance with an established process and, prior to taking action, considers the views of the other parties and periodically informs them about action taken”. Total FY 2017-2021 Adopted 5-Year Work Program $46,609M July 2016 Florida Department of Transportation; Office of Comptroller – General Accounting Office; Revenue Management Section; Spring 2017
Freight movement and economic vitality Environmental sustainability National Performance Goals U.S. DOT Florida DOT Sarasota/Manatee Safety Safety/ Security Infrastructure condition Preservation Congestion reduction Mobility Mobility/ Congestion/ Reliability System reliability Freight movement and economic vitality Economy Economy/ Freight Reduced project delivery delays Project delivery Environmental sustainability Environment Environment/ Livability
2040 Long Range Transportation Plan Adopted Goals and Priorities 2015-2020 Cost feasible project list 15th Street East River Road Multi Modal Emphasis Corridor/US 41 (MMEC) Congestion management (CMS) Central Manatee Network Alternatives Analysis (CMNAA) Advanced Traffic Management System (ATMS) Transportation Alternatives (TA)
Mobility/Congestion/Reliability MPO Board Priorities 2016 and 2017 Central Manatee Network Alternatives Analysis (CMNAA) Barrier Island Traffic Study Gulf Coast Trail
Infrastructure Condition MPO Board Priorities 2017 5 Bridge Priorities Desoto Bridge Anna Maria Bridge Cortez Bridge Coon Key Bridge Coquina Beach Bridge
Mobility/Congestion/Reliability Central Manatee Network Alternatives Analysis (CMNAA) Bradenton/Manatee County/Palmetto Bridge Capacity Operational Improvements Safety Improvements Bicycle/Pedestrian Improvements
Mobility/Congestion/Reliability Desoto Bridge Manatee County, Palmetto #1 New/Replacement Bridge @ US 41 2017 MPO Board priority PD&E funded in 2023 #17a New Bridge Capacity @ location TBD #1 priority for Manatee County and Palmetto #1? US 41/Desoto Bridge Manatee Ave to Haben + Location TBD Replacement + Capacity
Mobility/Congestion/Reliability NORTH STUDY AREA SOUTH STUDY AREA Barrier Island Traffic Study Anna Maria, Bradenton, Bradenton Beach, Holmes Beach, Longboat Key, Manatee County, Sarasota, Sarasota County Bridge Capacity (4 bridges) Operational/Multi Modal Improvements Safety/Bicycle/Pedestrian
Infrastructure Condition Strategic Intermodal System North Port, Port Manatee, Sarasota County, Venice Port Manatee Entrance – Piney Point Road I-75 @ SR 681 I-75 @ Yorkshire
Mobility/Congestion/Reliability Advanced Transportation Management System (ATMS) Manatee County, Sarasota, Sarasota County 2018 ATMS Master Plan Five project applications
Safety and Security FDOT/MPO Safety Assessments Analyze Top 20 crash locations Crash types and collision diagrams 4 Road safety audits on state roads Cortez Road – 82nd W to 1st St W SR 70 – 14th St W to 15th St E US 301 – 10th St to Desoto Rd Fruitville – School Ave to Bearded Oaks
Partner Priorities 43 Applications All Jurisdictions Highway Capacity Congestion Management Transportation Alternatives TRIP
2018 FDOT Project Priorities Schedule DATE ACTION MPO January MPO/Jurisdiction Staff Meetings/Project Review FDOT February 1, 2018 Completed project applications due to FDOT February Technical/Citizens Advisory Committees and MPO Board DRAFT Project Priorities Review JURISDICTIONS By March March 16, 2018 Jurisdictions adopt priorities and submit to MPO Preliminary list of priority projects April June DRAFT Project Priorities Update ADOPT Final Project Priorities July 1, 2018 Final approved list of priority projects
Project Priorities