PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II

Slides:



Advertisements
Similar presentations
Building a Combined 25F Nomogram Step 0: Define Terms Safe operating area: System remains within limits following the next worst contingency, regardless.
Advertisements

September 24, 2007 – Page 1 ColumbiaGrid Puget Sound Area Study Team Outage Scheduling Challenges Summer 2007 and Beyond Seattle City Light.
Puget Sound Area Northern Intertie (PSANI) Transmission History ColumbiaGrid September 24, 2007 September 24, 2007 Snohomish County Public Utility District.
PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report 24 Sept 2007 Gordon Dobson-Mack Ellen Feng
Project Update Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Late 2005 the.
Survival Estimates for the Passage of Juvenile Salmonids Through Dams and Reservoirs of the Lower Snake and Columbia Rivers (Project ) CBFWA March.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 WECC PCC Meeting March 7, Members Avista Bonneville Power Administration Chelan County PUD Cowlitz County PUD Grant County PUD Puget Sound Energy.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Solutions to Text book HW
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Washington’s Regions Topic 1. The Regions Coastal Range Region Encompasses basically the Olympic Peninsula Borders the Pacific Ocean to the West – The.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Grizzly-Summer Lake 500 kV Line Planned Outage May 27-June hours Mike Viles – BPA Transmission Operations Technical Management Team June.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.
Constraint Management Plans (CMPs) An Ops Planning Perspective Nitika Mago Operations Planning, ERCOT.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
Jeff Burkey King County Department of Natural Resources and Parks November 4, 2015.
Puget Sound Energy’s Use of RTF Analytical Tools for DSM Valuation Jim Lazar March 4, 2003.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Conclusion: reliable post contingency capacitor switching should be feasible to be planned. However, the simulation needs to be repeated as new information.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Puget Sound Area Transmission Expansion Plan Sensitivity Results Review
Reliability Must Run Workshop RMR Study Process May 24, 2016.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Topics Corporate Overview – Transmission Expansion Planning - Members
Modeled Load Levels in the Valley
4/23/2018 Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration 1 - Define Congestion.
Barrilla Junction Area Transmission Improvements Project
Local Area Planning Update to TRANSAC – December 21, 2016
Chapter 1 Review Game.
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Brett Wangen Director of Engineering, Peak Reliability
JTRP Road School March 25, 2008 Uncertainty-Based Tradeoff Analysis for Integrated Transportation Investments Integrated Solutions for Transportation:
Risk Assessment and Probabilistic Transmission Planning Methods
A Sample of Seldom Used Tools and other Power Flow Trivia
Removal of Fraser RAS from RAS Databse
PSAST TCRM Script Structure
Residential New Construction Market Update
Mgr. Interconnection Reliability Initiatives
Washington’s Regions Topic 1.
Recent Approved WECC Cases
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
Specifications Updates and Approval
Building a Combined 25F Nomogram Step 0: Define Terms
* Upcoming Meetings * * Upcoming Meetings * * Upcoming Meetings *
PCM (Production Cost Model) Data Work Group Webinar
Review of Distribution Network Protection
Confidential - For Internal Use Only
Ford Hatchery O & M (Project )
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
Removal of Fraser RAS from RAS Databse
TONBRIDGE POWER GREEN LINE
Confidential - For Internal Use Only
Excelsior Energy’s Mesaba Energy Project
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
ColumbiaGrid Puget Sound Area Study Team
Nomination 802 N Monroe St Jenkins Building
2018 CG MOD 33 updates CG Planning Meeting June 7, 2018
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report
Comments received: PSE
Presentation transcript:

PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II

Concerns 1.) Multiple Outage congestion 2.) Upcoming Outages 3.) PSA solutions

NI S>N 60F anticipated outage combination for 9/11/2007 Study 226 Tacoma - Raver #1&2 500kV, Monroe-Custer #1 500kV, Sedro - Bothell - Horse Ranch 230kV, Tacoma - Cowlitz #2 230kV, Snohomish 230/115kV Bank#3 & March Point 230/115kV Bank #3 O/S (S>N Sep@100MW) (Snohomish Delta Sep scheme enabled: DeltaSw - TualiPt & DeltaSw - C Mary St. 115kV O/S) Study 226 NI S>N 60F

Contingencies Average Puget Sound Net Area Load = 4675 Gen Level Trans   Average Puget Sound Net Area Load = 4675 Gen Level Trans Worst Limiting PSE SCL/ Limit Contingency Facility SNOH 100 140 -141 BFR: 4494 Cust-Mon #2 500kV & Cust 500/230kV Bk#1 Branch MURRAY (40767) TO SNOH S1 (41327) CKT 1 [230.00 - 230.00 kV] 460 -143 775 -149 BFR: 4496 Cust-Mon #2 & Cust 500/230kV Bk#2 260 21 20 13 525 896 BFR: Snohomish 230kV Bus Sect #1 Branch BUNKFOSS (45613) TO SNOH S1 (40984) CKT 1 [115.00 - 115.00 kV] 852 799 N-1: Snohomish - Murray #1 230kV 1000 1556 1512 1463 1200 1529 N-2: Murr - Cust #1 & Belling - Cust #1 230kV Branch CUSTER W (40321) TO PORTALWY (42001) CKT 1 [230.00 - 115.00 kV] 1468 1409

226 vs. ALIS NI S>N 60F

Major upcoming outages Sedro-Bothell-Horse Ranch 230kV Chief Joseph – Monroe 500kV Bothell – SnoKing #1 230kV Rocky Reach – Maple Valley 230kV Monroe 500/230kV Bank #1 Grand Coulee – Schultz #1 500kV Schultz – Raver & Schultz – Echo Lake 500kV

To think about…. Multiple facilities in same area Does the facility have major impacts Ways of implementing mitigation plans Responsibility of mitigation plan? Operation vs. planning arena Agreeing on feasible solutions

Questions?