Production management

Slides:



Advertisements
Similar presentations
Workshop: Preventive Maintenance
Advertisements

4/27/2015 IENG 471 Facilities Planning 1 IENG Lecture 04 Schedule Design.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Implementation Core Team March 1, 2013 Conference Number: Participant Code:
Scheduling Chapter 19.
Estimating Planning Estimating Planning Controlling.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Industrial Facilities Design
Management of Production Planning Data By Medimi Harita Mrt Nr:
Electricity Calculating Electric Power When installing new appliances, equipment, tools, or any type of electrical convenience, it is important to know.
Lean MAST Tools for Integrating Lean Projects. Lean MAST Overview Lean MAST provides the roadmap for the transformation from a work order based production.
Master Schedule Building What Building Principals Need To Know.
Sara Davila 2009 Task Based Learning and Performance Assessment Low Budget, No Budget, Low Prep.
5.5 Simple Interest I can find simple interest.. Simple interest formula.
Capacity analysis of complex materials handling systems.
A Guide to Group Contracts. Contract Parts  Contact information  Group Goals  Roles and Responsibilities  Rules  Steps for firing a member  Signatures.
Formula? Unit?.  Formula ?  Unit?  Formula?  Unit?
Design Flow 1 Mission Req (ASSET) Initial design by space Detailed Design (Equip by Comp) Zone model Compartmention Model List of comp + req Compartmentation.
Procedures for managing workflow components Workflow components: A workflow can usually be described using formal or informal flow diagramming techniques,
M. A. R. S. Mars Aerial Reconnaissance Simulation.
1 © The Delos Partnership 2003 Supply Chain Techniques Getting the plan executed.
8/24/04 Paul A. Jensen Operations Research Models and Methods Copyright All rights reserved Review Models and Analysis of Manufacturing Systems.
Primary Consumer Energy Flow Lab Write-up. Title.
Easy Substitution Assignment. 1. What are the steps for solving with substitution?
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
Leading in the 21 st century- New paradigms for a globalizing world MGMT-E 152 Prof. Michael Pirson Class 8: November 5.
 Tata consultancy services Production Planning WORK CENTERS.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Process engineering TAKT vs CYCLE.
3.2 Your strategic MES partner.
Induction Presentation
Quadratic Functions Final Four Bracket Choices
Assignment Writing Help Online for Finance Subject
ASSIGNMENT NO.-2.
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
UOPFIN 370 Education for Service-- uopfin370.com.
Product Development Scenario Overview
Value Stream Mapping (VSM) Training
SLOPE = = = The SLOPE of a line is There are four types of slopes
Instructor: Hyosang Kang Sep. 15, 2005
Modeling Scheduling Problems
Course Contents: T1 Greedy Algorithm Divide & Conquer
Speed and Velocity.
IENG 471 Facilities Planning Schedule Design
Formulas for Linear Functions
A graphing calculator is required for some problems or parts of problems 2000.
Process Improvement Labs
EDLC(Embedded system Development Life Cycle ).
Production management
Unit 3 Review (Calculator)
Production management
Production management
7.4 Slope Objectives: To count slope To use slope formula.
File no 1 Planning for the ERP processes PPC Cycle
Biology Unit 1 Project Diet Analysis for: ____________________
Lesson 8.3 (part 1) Slope.
Labor Assignments In either job or Batch production systems, the problem is to determine the number of workers needed in each station to achieve the required.
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
Table of contents 1. Introduction – your product, sketch, description, functionality, variants 2. Bill of materials 3. Manufacturing process- block diagram.
Workshop: High Level Reporting
Line Graphs.
Project Name TEAM MEMBER 1 NAME TEAM MEMBER 2 NAME TEAM MEMBER 3 NAME
I have… I have… Who has 3:40? Who has 12:20? I have… I have…
Change Tested or Implemented
MyToolik Online portal that will allow you to manage all things Toolik under one log-in All Toolik residents will have an account in the system By March.
FIN 370 HOMEWORK best future education / fin370homework.com.
Ian Falu Prety Widjaja IE-642
OEE System July 2018.
SDLC (Software Development Life Cycle) Role Play
Presentation transcript:

Production management Project

Organization of the project Teams (3-4 Students) Roles assignment Work planning and scheduling Completing stages of the project Presentation

Project stages Product: selection, description (tools: BOM) Production process: operations, times, equipment (tools: processing cards) Production process: parameters calculations (tools: measures and ratios) Scheduling: planning operations in time, assigning them to machines (tools: production schedule) Resources requirements calculation: machines, people, space (tools: formulas) Shopfloor framework Presentation

Multi level BOM

Production process: Process flow (graph) Cycle time (for each part and product) Throughput rate (for each operation) Capacity (for each operation and total) Consider batch/lot size 100 units (final product) Send the report on that part to: agnieszka.stachowiak@put.poznan.pl by 12 April 2018