Feasibility Study Preparation Venelina Varbova

Slides:



Advertisements
Similar presentations
PEIP Project Tariff Policy for Water and Wastewater Services.
Advertisements

The Business Plan.
Feasibility Study Preparation Venelina Varbova. Session Overview  Purpose of the Feasibility Study  The Feasibility Study process according.
Basic Considerations  outlines the process by which the Government of Kenya will develop its national strategy for participating in an evolving international.
Business plan overview (1)
ENVIRONMENTAL MANAGEMENT PLAN
The Business Plan: Creating & Starting the Venture
B121 Chapter 12 Finance. Accounting concepts & principles Financial statements are prepared at the end of a period. The form and content of such financial.
Financing Urban Public Infrastructure
Measure what matters – to build stronger financial performance and to achieve financial stability under OFR Peter Scott Peter Scott Consulting
Role and Components of Project Evaluation
Project Planning and Capital Budgeting
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
A Typical Business Plan
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
1 The budgeting process The traditional goals of the planning and control process are: - to identify the economic goals and how to achieve them - to measure.
Hazards Risk Management Course Revision Project Update George Haddow June 2012.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
JASPERS in the Environment, Energy and Municipal Sectors Cost – Benefit Analysis Prague, 28 th November 2007.
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
INTRODUCTION TO BOOK-KEEPING AND ACCOUNTANCY Samir K Mahajan.
System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
Feasibility Study.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
The Business Plan: Creating and Starting the Venture
OECD Water Programme Pillar 1, Output 1 “Pricing Water Resources and Water & Sanitation Services” World Water Week Stockholm, August 2008.
Investment decision making
December Why Program-for-Results (PforR)? Development Effectiveness and Client Demand – PforR responds to client demand that could not be fully.
Socially Acceptable Costs for Municipal Solid Waste Management Services Vojtěch Doležal, SEWACO s.r.o 24 June 2015 ISWA Study Tour WASTE-TO-ENERGY.
EN Regional Policy EUROPEAN COMMISSION Francesco ANGELINI European Commission, DG for Regional Policy Coordination Unit – Major Projects Team.
7.0 Project Cycle Preamble Whether it is an investment or servicing project, every project is expected to take off with initiation of ideas and creation.
Road Investment Decision Framework
Introduction and Overview
Financial and Operational Performance Improvement Programe (FOPIP) Danube Water Conference 2017, Vienna, May 18 Training session on Local governments’
Strategic Information Systems Planning
Danube Water Conference 2017, Vienna
MGT601 SME MANAGEMENT.
FEASIBILITY STUDY (TECHNO-ECONOMIC ANALYSIS)
Guide to COST-BENEFIT ANALYSIS of investment projects NEW EDITION 2008
The Feasibility Study: something we already know
Systems Analysis and Design in a Changing World, 4th Edition
Capital Project / Infrastructure Renewal – Making the Business Case
CHAPTER 5 TECHNICAL ANALYSIS.
Evaluation of CBA Experience and Key Issues
Unit – iii Sources of product for business
THE FEASIBILTY STUDY LECTURE-5.
Business System Development
Cost Concepts and Design Economics
MGT 498 Education for Service-- snaptutorial.com.
MGT 498 Teaching Effectively-- snaptutorial.com
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Introduction and Overview
Consultation & Participation
8 FEASIBILITY STUDY Financial Projections
NEPAL ADMINISTRATIVE STAFF COLLEGE Project Appraisal: Group Works
Progress of the preparations for a White Paper on Adaptation to Climate Change Water Directors’ meeting Slovenia June 2008 Marieke van Nood, Unit.
Costing and Finance P R Upadhyay.
PROJECT REPORT PREPARATION
GCF business model.
INTRODUCTION TO BOOK-KEEPING AND ACCOUNTANCY
Gender mainstreaming in environmental
Stevenson 5 Capacity Planning.
Relationship between World Bank and Romanian EA requirements
Capital Improvement Plans
ECONOMICS IN THE WFD PROCESS
DG Environment, Unit D.2 Marine Environment and Water Industry
Civil Society Facility and Media Programme Call for proposals: EuropeAid/162473/DH/ACT/Multi Webinar no. 3: Preparing effective Concept Note.
Integrating Gender into Rural Development M&E in Projects and Programs
Presentation transcript:

Feasibility Study Preparation Venelina Varbova

Session Overview Purpose of the Feasibility Study The Feasibility Study process according to international standards The Feasibility Study outline Discuss the challenges faced by many SEE consultants and local governments in preparing projects

The Feasibility Study: something we already know Feasibility study as project plan - assumes the project concept is feasible and maps out the course for project implementation Focus on engineering aspects – low attention to social, institutional, environmental aspects Economic and/or financial analysis limited to budgeting exercise and some cash flow Feasibility analysis as part of the process is missing

The Feasibility Study: international standards Feasibility study is the result of feasibility analysis Convince the reader (financing entity) that the project is worth funding Document relevant information and aspects regarding the project Assess whether the project is relevant, viable and implementable Enable the project proponent to prepare financing application and present the project to sources of financing

Project Preparation vis-à-vis Project Cycle Implementation Phase Design Phase Strategic and Sectoral Considerations Project Identification Project Sustainability Pre-feasibility Study, PPD Project Execution Project Preparation Feasibility Study, EIA, PSD Feedback loops Project Start-up Implementation Planning PIP Process flow

Overview of FS Contents and Outline Executive Summary (PSD) Introduction Project Strategic Context III. Technical Analysis IV. Institutional Assessment FEASIBILITY STUDY V. Environmental Assessment VI. Stakeholder Analysis VII. Financial and Socio-Economic Analysis VIII. Conclusions IX. Project Implementation Plan IX. Appendices

Project Strategic Context Strategic goals; priority programs at local/regional level National policies: National, regional or sectoral goals which the project supports Project environment issues: policy, legal and regulatory, institutional framework, environmental, etc.

Technical Assessment Several subsequent assessment levels: Technical assessment of existing services, physical system, and treatment, and measures for their optimum use Demand (wastewater flow) analysis and forecasting Establish gap between the current level service and future demand Develop technical alternatives for the project required outputs (design, technology, process, scale)

Technical Assessment - Illustration for scope of wastewater project Wastewater services: Determine service area and coverage Identify consumers per categories Develop scenarios for future service development Wastewater system: Description of existing system and facilities Evaluate the system components and its operation Wastewater treatment: Describe and assess existing facilities Describe and assess present environmental impacts of untreated wastewater/sludge discharges into surface water bodies

Purpose of the financial analysis is multiple: Financial and Socio-economic Rationale of environmental investment project Purpose of the financial analysis is multiple: Assessment of project viability and implementability for the municipal utility and the local community and economy A tool for analyzing, structuring and selecting different project options Assessment of project returns on overall investment and capital A tool for identifying appropriate types of project financing Analysis of project broader socio-economic impact to the community

Institutional Analysis Aspects of Feasibility Analysis Input to the financial and socio-economic analysis Technical Analysis Financial Analysis Social and Stakeholder Analysis Project Feasibility Economic Analysis Environmental Analysis Institutional Analysis

Financial Cost-Benefit Analysis of a Project The unit of analysis is the project, not the company Evaluates and calculates the project’s financial: Revenues Costs Net benefits (of revenues over the costs) Project revenues, costs and net benefits are determined on a with-project and without project basis.

Financial Cost-Benefit Analysis Project Revenues Only the project contributed revenues, i.e. water/wastewater sales to the utility are estimated: The project revenues are determined for different groups of users (different tariffs): Households Government/public institutions Commercial/industrial users Other (connection fees)

Financial Cost-Benefit Analysis Project Costs Investment costs: Capital costs: land, civil works, equipment, studies Education programs, lab equipment & training, Institutional Development (consulting services, capacity building programs, M&E of benefits) Operation and maintenance costs: labor, electricity, chemicals, materials, overheads, raw water charges, insurance, etc. Residual values (of project assets at the end of the project life)

Conclusions of the Financial Analysis Selection of options and technology Overall project profitability and sustainability Financial impact on the utility Final phasing of investments and priorities Financing Plan and application requirements Tariff setting and proposal to the municipality Responsibility chart Project cash flow skeleton for conducting socio-economic analysis

Economic Cost-Benefit Analysis of a Project Purpose: To assess the project economic worth to the country Evaluates and calculates the project’s economic benefits and costs to the whole economy in constant economy prices (adjusted financial prices) including external benefits: Environmental benefits Health effects Non-technical losses (UFW) Both have similar features and estimate net benefits based on project incremental input Yet, the concept of financial net benefit is not the same as economic net benefit (commercial viability for the utility vs. real worth to the society) Complementary: For a project to be economically viable, it must be financially sustainable

Social and Stakeholder Analysis Local Government Consumers Operator/Utility Vulnerable groups Wider community Financier Ultimately all ventures are about people! It’s more important to understand the people than the technology: Who gains? Who loses? Social and distribution analysis of project effects (different beneficiaries) Poverty Impact Analysis

Environmental Impact Analysis Assessment of project impacts to physical and also non-physical environmental aspects: Physical (water, air, land) Biodiversity Nuances (noise, odors) Safety Aesthetics, cultural and historical heritage Two possible levels of assessment: Preliminary (Initial) Environmental Review Full Environmental Impact Assessment

Institutional Analysis Assessment of legal and institutional framework Relationship and independence of the water company from the municipality in setting tariffs Capacity of the project entity to: implement, manage and maintain the project Financial sustainability of the project entity Adequate project management processes, including procurement and human resources Capacity building programs

Sensitivity and Risk Analysis A technique for investigating the impact of changes in project variables Identify key variables which influence project costs and benefits Investigate the consequences of likely adverse changes Identify mitigation actions Qualitative Risk Analysis at the: project level, sector level and national level

Summary The feasibility analysis is an internationally accepted process used to evaluate various project dimensions important for achieving the desired project benefits. An effective tool for appraising the project from standpoints of all project stakeholders It is not a waste of time. It significantly reduces the risks in project implementation