Monitor and Control Software

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Software for Science Support Systems EVLA Advisory Committee Meeting, March 19-20, 2009 David M. Harland & Bryan Butler.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
Portal and Proposal Submission Review of SSS Software Readiness for SRO, June 5, 2009 Bryan Butler EVLA Computing Division Head.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
SSS Group Management Review of SSS Software Readiness for SRO, June 5, 2009 Bryan Butler & David Harland EVLA Computing Division Head & SSS Group Supervisor.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
EVLA Monitor & Control Transition System Software
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory Correlator Status and Growth of Capabilities Michael P. Rupen Project.
Output Formats Part I Bryan Butler NRAO Oct-31EVLA Correlator f2f2 Overview 2 types of data: –Monitor data - of interest to engineers and system.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Interim Data Capture & Format (IDCAF) Walter Brisken 2006 Dec 6.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
EVLA Data Processing PDR E2E Data Archive System John Benson, NRAO July 18, 2002.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Bryan Butler EVLA Computing Division Head
Surveying Cosmic Time with the WIDAR Correlator
EVLA Availability - or - When Can I Use It?
EVLA Archive The EVLA Archive is the E2E Archive
Committee Charge Fred K.Y. Lo
EVLA Advisory Committee Meeting System Status
EVLA Computing Software Overview.
EVLA Status and Prospects
Software Requirements
EVLA M/C Software PDR, 14 May 2002
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
EVLA Computing Reorganization
EVLA Advisory Committee Meeting
Science Commissioning
Software Requirements
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
Operations Software Bryan Butler.
Prototype Correlator Testing
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA M&C Components Observation Executor, Interim & Final Obs2script
Correlator Growth Path
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
EVLA Advisory Panel Mtg. System Overview
Requirements Bryan Butler.
Presentation transcript:

Monitor and Control Software EVLA Advisory Committee Meeting, March 19-20, 2009 Bryan Butler EVLA Computing Division Head

Major Subsystems Executor and parameters database Antenna M&C Correlator M&C Alerts and logging Monitor data storage and retrieval Metadata capture and format Telescope calibration Monitoring interfaces Archive loading controller SDM cataloger

Transition System

Prototype Correlator System

Archiving System

PTC Support Success deep blank field 0217+738 ~70000:1

WIDAR0 System

WIDAR0 Support Success WIDAR0 first fringes

Transition System Milestones Already Supported Support for EVLA antenna hardware development Use of EVLA antennas in scientific observing Replacement of Modcomp-based VLA control system Support of prototype WIDAR testing (both PTC and WIDAR0)

Data Rates and Volumes Driver Target Date % time Max rate (Mby/s) Mean rate (Mby/s) Volume (Tby/yr) Now 100 .06 .02 0.5 PTC Aug08 small 8 n/a WIDAR0 Mar09 20 0.1 4 256 MHz bandwidth; 1024 channels max; 1 sec min dump (OSRO) Mar10 90 .23 0.08 2 2 GHz bandwidth; 8096 channels max; .1 sec min dump (RSRO) 10 0.6 8 GHz bandwidth; 32384 channels max; .1 sec min dump; only ~10 antennas with 3-bit samplers (RSRO) Jun10 16 5 8 GHz bandwidth; 1048576 channels max; .1 sec min dump Oct10 75 60 2 GHz bandwidth; 8096 channels max; .1 sec min dump (OSRO) Jun11 (End of construction) Jan13 600 Early testing indicates we should have no trouble supporting these data rates

Operator Interface Demo