Flood damage survey after major flood in Norway 2013 - cooperation between the insurance business and a government agency Hallvard Berg, Norwegian Water.

Slides:



Advertisements
Similar presentations
FIAR International Insurance- Reinsurance Forum 2013 Nat Cat mitigation programs in Bulgaria Roumen Galabinov.
Advertisements

National perspective: Sweden European & national perspective (EU & National policy needs, databases and their objectives/utilization of data) Swedish Civil.
Bush Fire Risk Management Planning Community Participation Department of Lands, National Parks and Wildlife Service, Integral Energy, Rural Fire Service,
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
1 Comprehensive Disaster Risk Management Framework National Disaster Management Systems 1111 Introduction to Damage and Reconstruction Needs Assessment.
Business & Personal Finance
Session 301 Factors in Assessing Risk Mitigation Actions Impact reducing the identified risks and vulnerabilities in the community Probability that each.
URBAN FLOODS IN GREECE Current situation and major research and development needs in Urban Flood Management Cost meeting, Warsaw, 29-31/5/2008 Vassilopoulos.
Climate & Transportation R&D program conducted by the Norwegian Public Roads Administration , cca 2,5 mill € Update design, construction, operation.
1 A new training course for Engineers in Lyon : « Prevention and management of risk in the territory » A way forward ‘’excellence’’ ?
Protection and Disaster Risk Reduction (Place) – (Date) Session 6.1: Integrating Protection into Disaster Risk Reduction.
NEW APPROACH TO MARGINALIZED COMMUNITIES IN SLOVAKIA - ACT ON SOCIALLY EXCLUDED COMMUNITIES EUROMA MEETING, BRATISLAVA, MAY 4, 2012 MARTIN VAVRINČÍK, DEPARTMENT.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Private – public – project: Can insurance data help preventing natural catastrophes and urban flooding damage? Mia Ebeltoft, Project manager Mia Ebeltoft,
Institute of Meteorology and Water Management Roman Konieczny
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
Pacific Island Countries GIS/RS User Conference Suva, Fiji November 2010 Tools for Disaster Risk Management and Climate Change Adaptation Abigail Baca.
Economics of Extreme Climatic Events By Adil Rasheed (EPFL-ENAC-ICARE-LESO-PB)
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Types of Insurance. Private Insurance – Life and Health – Property and Liability Government Insurance – Social Insurance – Other Government Insurance.
1 Hazard Management from cadastral informations point of view - Natech Disasters in Finland Arvo Kokkonen Deputy Director General Permanent Committee on.
Enver AKSOY, MSc Head of Strategy Development Board of MoFAL Policy approaches of Ministry of Food, Agriculture and Livestock to pasture management in.
Perceived Climate Change Impacts and Exposure Units ASTRA Conference May 2006 Klaipeda Jürgen Kropp & Klaus Eisenack Potsdam Institute for Climate.
Basin management plan Case Sibalom watershed, Philippines Marion Hermus Cornelia Rudolph Lennart Swinkels.
Integrated assessment of socio-economic risks of dangerous hydrological phenomena in Russian coastal zones of the Baltic, the Azov and the Black Seas Lomonosov.
Moldova Floods Joint Government and Development Partners response Chisinau, July 29, State Chancellery Government of Moldova.
Assessment of Vulnerability on the Aral See Basin NATALYA AGALTSEVA Research Hydrometeorological institute (NIGMI) Uzhydromet Uzbekistan.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
IDEA Improving Damage assessments to Enhance cost-benefit Analyses Call Identifier: Prevention 1. Actions on the economics of investing in disaster risk.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
The EU Floods directive -Implementation in Sweden.
3 rd WG F meeting: CRUE ERA-Net update Andreas Pichler CRUE ERA-Net dissemination officer.
Armenia Action B th – 23 rd March 2012 Mrs Vibeke Skov Møller Address Register The Danish experience.
Flood damage models – Scope and limitations
29 TH AIO CONFERENCE 27 TH – 30 TH MAY KHARTOUM, SUDAN MICROINSURANCE AS STIMULUS FOR MICROFINANCE “ SUDAN VIEW ” OMER ELFAROWG AHMED (DIP CII)
Towards a robust transportation infrastructure to respond extreme weather events in Norway Project manager Bjørn Kristoffer Dolva, 2016 International Partnership.
Framework Programme : 7th Research Framework Programme : Some aspects.
Flood Management Constitution Ministry of Energy
Flood Insurance- When is it required, and How much does it cost?
DISASTER VULNERABILITY, RISK AND CAPACITY
Determining Flood Management Constitution in Ministry of Energy
Loss data collection at the local level Experience from Germany
Disaster and Emergency Planning
DISASTER MANAGEMENT.
Sendai Framework for Disaster Risk Reduction
Critical Infrastructure in Varna
Community-based Rehabilitation
CONTINUITY OF OPERATIONS PLANNING WORKSHOP #2
LABOUR, SOCIAL AFFAIRS AND FAMILY OF SLOVAK REPUBLIC
Chapter 3: risk measurement
60th National Town and Country Planners’ Congress
Climate Change & Environmental Risks Unit Research Directorate General
CONDOMINIUM OWNERS FORUM
Conducting a Climate Change Risk & Vulnerability Assessment
Norwegian Water Resources and Energy Directorate (NVE)
Pilot studies on the provision of harmonized land use/land cover statistics: Synergies between LUCAS and the national systems Norway Erik Engelien Division.
Central Asia is considered a global hotspot with respect to impacts of climate change on the mountain cryosphere and downstream societies, most notably.
Disaster Mitigation Mitigation reduces the impact of disasters by supporting protection and prevention activities, easing response, and speeding recovery.
Good Practices on Disaster Prevention in Europe
EU activities in disaster prevention and risk management
Seasons, capacity and funding
Seasons, capacity and funding
Fitness Check EU Water Policy
Mark Adamson Office of Public Works 27th February, 2019
(Your Name) (Your Organization).
Scottish Government Responsible for environment & flooding issues
©OnCourse Learning.
The EU Strategy for Adaptation to climate change
Project Risk Management Jiwei Ma
The Technical Opportunities and Economic Implications of Permafrost Decay on Public Infrastructure in the Northwest Territories Ed Hoeve, P. Eng., TetraTech.
Presentation transcript:

Flood damage survey after major flood in Norway 2013 - cooperation between the insurance business and a government agency Hallvard Berg, Norwegian Water Resources and Energy Directorate Mia Ebeltoft, Finance Norway Jørgen Nielsen, Norwegian Natural Perils Pool Friar 2014, Poznan, Poland

Norway Population 5 mill. AREA: Main land: 323 787 km2 LAND USE: Svalbard: 61 022 km2 Jan Mayen: 377 km2 LAND USE: Developed: 1,4 % Farm land: 3,2 % Marsh land: 5,8 % Lakes and glaciers: 7,0 % Forest: 38,2 % Mountainous: 44,4 % Inhabited area

The flood of May 2013

Flood risk management in Norway «how to live with the hazards» White Paper no 15 (2012): ”The Government will continue its effort in prevention of damage caused by floods, landslides and avalanches based on a holistic approach” Mapping Land use planning Protection measures Monitoring and early warning Contingency and crisis management R&D, communication NVE’s work in preventing damage from floods and landslides is structured according to the holistic approach, in the following tasks: Hazard and risk mapping Assistance and control of land use planning in the municipalities Planning and construction of structural protection measures Monitoring and early warning: Floods, Debris flows, Snow avalanche Assistance to the police and municipalities in emergency situations Research & Development, Communication 21. sep. 2018

Natural hazards insurance in Norway Automatically linked to fire insurance Premium a function of insurance value Covers damage to the building, content, garden and courtyard The Natural Perils Pool: Equalizes losses between the insurance companies Reassurance – modelling of risk Finance Norway: Federation for banks, insurance companies, financial institutions Business policy, employer-related issues Two main compensation systems for private property: Private insurance Governmental compensation, damage to non-insurable property Regulated by the Natural Hazards Insurance Act. Premium not differentiated according to risk. Set by the Government It is part of FNO’s climate strategy to work with public authorities in the prevention of damage caused by increased frequency and intensity of natural events.

Motivation for cooperation Improve the basis for Flood risk assessment Improve the tools to assess the risk and the effects of measures A lot of effort put into hazard assessment Improve the basis for consequence assessment Finance Noway’s climate strategy: Work with public authorities in the prevention of damage caused by increased frequency and intensity of natural events.

Damage survey 2013 – registration of flood parameters A special form was developed. Supplementary to the standard damage survey form.

Damage survey 2013 – registration of flood parameters Link to damage survey Flood parameters Surveyor Survey ID Insurance company Damage location Municipality no Building no Supplementary information Water level (cm +/- relative to ground floor level) Basement (yes/no) Erosion, under-mining of the building (yes/no) Mass deposition outside of the building (yes/no - thickness) Damage due to floating objects etc hitting the building (yes/no) Parameters registered

Results from the 2013 survey 243 cases reported Water level: Above ground floor (1-170 cm): 85 cases Below ground floor (1-270 cm): 89 cases Value «0»: 43 cases Blank (no value): 27 cases 182 cases linked to damage data Issues: Relative water levels Link to other parameters? Weak positioning

Results from the 2013 survey Other hazard parameters collected   Basement? Erosion, under- mining? Mass deposition outside? Floating objects hitting? Yes 117 17 70 7 No 110 214 161 224 Blank 16 12

Results from the 2013 survey 182 cases linked to damage data

Stage – damage curves from 1995 data Source: Gottschalk & Krasovskaia, 2006

Highest water level above basement floor Category All data Single family residential houses Secondary houses Public buildings Farms Industrial- Commercial buildings Other buildings total number of cases 2296 607 211 97 649 359 373 number of cases with complete data 1420 367 161 69 432 218 173 mean 570 311 160 1116 805 914 268 median 142 93 521 281 184 81 std. dev. 1170 678 1490 1333 1734 619 minimum 0.1 1.4 3.5 11 795 maximum 15655 5512 1029 10535 6803 5512298 coeff. var. 2.052 2.180 1.149 1.335 1.656 1.897 2.308 skewness 4.758 4.737 2.217 3.995 2.821 4.524 5.628

Relevant data?

Benefit to FRM from damage surveys Overall risk picture Prioriteringer, forvaltningsplaner Detailed analyses Cost-benefit analyses – flood protection Calibration and verification of models – mapping -> land use planning Critical damage levels – emergency management Map positioning and link to hazard parameters increases the value substantially! Given Risk as a function of probability and consequence. We spend a lot of effort on the probability of the event, water levels etc. Much more subjective judgements of consequences. Overall risk picture: Prioritisation of preventive actions Flood risk management plans Identify «hot spots» Plans for mapping Plans for protection Flood warning? – critical water levels Emergency management – prioritisation of efforts during crises -

Overall risk picture Damage to private property 1980 – 2013

Overall risk picture - prioritization Preliminary flood risk assessment

Flood risk assessment – flow chart Source: Gottschalk & Krasovskaia, 2006

Cost- benefit analysis

Actual water level – detailed location 153,35 masl 153,05 masl 153,20 masl 202,46 masl

Flood event map

200 years flood – basis for land use planning

Flood warning map for 25 May 2015?

Visions Systematic collection of damage data by key stakeholders Cost- effective inclusion of hazard parameters in standard damage survey Access to all data relevant to flood risk analyses – clarify conserning sensitivity of data Standardised format/ structure – map positioning More/ better data -> improved risk management -> reduced damage  This is example of cooperation between the insurance business and NVE. Preferably collection of damage data should be performed by all key stakeholders (road, railway authorities, municipalities, other infrastructure owners, The Governmnetal Natural Hazards Fund) Ref the Pilot project: discussions ongoing how to move forward - making data from the insurance business available to the public, in particular the municipalities.

Thank you for your attention! hbe@nve.no 21.09.201821.09.2018