PSAST TCRM Script Structure

Slides:



Advertisements
Similar presentations
Building a Combined 25F Nomogram Step 0: Define Terms Safe operating area: System remains within limits following the next worst contingency, regardless.
Advertisements

September 24, 2007 – Page 1 ColumbiaGrid Puget Sound Area Study Team Outage Scheduling Challenges Summer 2007 and Beyond Seattle City Light.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
POTF Status update.
Northeast Congestion Management/SPS in TCR Calculations James J. Teixeira John Moseley.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
Washington Climate Ch 12 Activity 1. Chapter 12 Activity 1 What Do You Think? What is the climate like in Everett/Seattle? What is the climate like in.
Revision on Triggers and Cursors. Walk through of exam type question. Question 1. A trigger is required to automatically update the number of rooms available.
Evaluation of the RTF Standard Protocol Fan and Cooling Savings from Commercial-Sector Heat Pump Units Rooftop Unit Working Group (RTUG) August 20, 2012.
AFC METHODOLOGY EMS USER GROUP SEP 12, 2004 AFC – New Developments EMS USER GROUP Sep
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
Who Wants To Be A Millionaire? Seasons Question 1.
CRR Model Building Process Bradley Bell CRR Engineer.
Western Area Power Administration Transmission Customer Meeting October 17, 2007.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
09/20/20061 RTCA, CAM, and SFT Presented by: John Dumas September 20, 2006.
Morning Warm- Up! When summer is done, We know winter will soon be here. How does nature change During the year?
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Презентацию подготовила Хайруллина Ч.А. Муслюмовская гимназия Подготовка к части С ЕГЭ.
Puget Sound Area Transmission Expansion Plan Sensitivity Results Review
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Results of NTC Calculation Exercises on BSTP Regional Model
Hashing (part 2) CSE 2011 Winter March 2018.
TYPEFACES Please make sure you have the correct font installed. If Overpass is not installed, your type may look like the examples below. Download Overpass.
Modeled Load Levels in the Valley
Commercial Customer Demand Response Program Pilot
NO CAD FILE OR PDF FILE WORST CASE SCENARIO!.
Local Area Planning Update to TRANSAC – September 15, 2016
ELEC 3105 Basic E&M and Power Engineering
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Team Members: Kyle Jones Mark Magee Jason Rippee
Risk Assessment and Probabilistic Transmission Planning Methods
Western Electricity Coordinating Council
Eleanor Ewry Base Case Coordination Subgroup Chair
Western Electricity Coordinating Council
Design a Relational Database Identify Database Purpose
Michael I. Henderson ISO New England Inc.
Transmission Planning in a Modern Market Environment
Mgr. Interconnection Reliability Initiatives
Local Area Planning Update – TRANSAC
DEC System Voltage Planning - June 2018
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
PowerPoint Mockup of CMS Code Generator
SEASONS.
CSE373: Data Structures & Algorithms Lecture 14: Hash Collisions
Local Area Planning Update to TRANSAC – September 26, 2018
TVA RC 2017 Summer Outlook TVA RC July 27, 2017.
Unit 18 Database Design Extended Diploma in ICT Julie Hodsdon
Enhanced Curtailment Calculator (ECC)
Building a Combined 25F Nomogram Step 0: Define Terms
The Variance How to calculate it.
Science – Day 2 Agenda Have out the following: TODAY’S OBJECTIVE:
!'!!. = pt >pt > \ ___,..___,..
MS Access and Database Connections
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
Data Management Innovations 2017 High level overview of DB
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
TONBRIDGE POWER GREEN LINE
Calendar.
PN UNC AMR Topic Workgroup
Technical Committee Meeting March 18, 2016
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
ColumbiaGrid Puget Sound Area Study Team
Application of Proposed New BES Definition:
Unity Application Generator
Contingency Plan for the March/April, 2006 possible power shortage
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report
SQL AUTO INCREMENT Field
Tutorial 1 Learning Topology Optimization Through Examples and Case Studies August 18, 2019.
Presentation transcript:

PSAST TCRM Script Structure PSAST Meeting May 20, 2008 Kurt Conger Seattle City Light

Y N Y N Set Up Basecases Summer/Winter Base Cases Project Topology (PT) Loop  Insert PTs PT Case Operating Conditions, Transfer Direction Loop Winter/Summer HLH/LLH S-N/N-S Next PT TCRM Table Nomogram Spreadsheets Next OC/TD OTC Limit Calculations Primary Contingencies Generator Scenarios Temperature (Load) Y More OC/TDs? N Restore PT Case Y More PTs? Restore Basecases N Done!

Results Table Project Topology [key], Season (Summer or Winter) [key], Load Period (HLH or LLH) [key], Transfer Direction (N-S or S-N) [key], Primary Contingency (Outage Scenario) [key], Generation Scenario (ATC) [key], Temperature Scenario (ATC) [key], Transfer Limit (MW) [result], Worst (Secondary) Contingency [result], Limiting Facility (Element) [result], Other results fields [results] %OTDF Pre-Trans Est Limit Used Other ATC Mon values Solution Code Color [result].