Multiple dependency activity on node (AoN) networks ( lecture )
Chapter 7 Project Management
Copyright © 2008 Pearson Education, Inc. Slide 13-1 Unit 13C Scheduling Problems.
Estimating, scheduling and budgeting
Based on the book: Managing Business Process Flows
D1: Critical Events And Critical Paths. D1: Critical Events And Paths A critical path is the list of activities on an activity network that, if they are.
Floats in the AoA network
Scheduling the Project
MEM 612 Project Management Chapter 5 Scheduling the Project.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Copyright © 2008 Pearson Education, Inc. Slide 13-1 Unit 13C Scheduling Problems.
إدارة المشروعات Projects Management
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
5.8 Project Management Chapter 37 HL - Only.
Project Networks. A,4 B,3 C,4 D,6 E,3 H,6 F,5 G,4 I,2 St,0 Fin,0 Example Network - terminology C,t Activity Duration of Activity (ES, LS) Early Start.
Activity networks – Example 1 TaskDuration (hours)Immediate predecessors A3- B4- C6- D5A E1B F6B G7C, D, E The table below shows the tasks involved in.
Analysing the AoA network Project Management. Total Project Time The minimum time in which the project can be completed. Calculation: forward pass Forward.
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
15C Backward scanning and crashing
1 B. SW Project planning & scheduling Recap from previous slide: It is important to decide on who is responsible for each activity. See Yeates & Cadle.
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
Network Scheduling : Precedence Diagram Method
PROJECT MANAGEMENT Syllabus Outcomes : Construct and interpret a network, identify the critical path, and calculate the free and total float. Evaluate.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Business Department Session 6 Exam Question –Draw Network diagram –Identify Critical path –Sketch Gantt Chart –‘Crash’ the project Reduce the project completion.
RESOURCE ALLOCATION & LEVELLING
Analysing the AoN network Project Management (seminar)
Free Powerpoint Templates Page 1 Example a)Draw an arrow diagram b)Analyze network giving EST, EFT, LST, LFT, FF and TF c)Construct a resource profile.
Project Management in Practice
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
MEM 612 Project Management Chapter 5 Scheduling the Project.
Lags in Precedence Relationships
‘Crashing’ – reducing task durations by increased costs ( lecture )
15B Critical path analysis. In a critical path analysis, edges represent activities. Nodes (vertices) represent the end of one activity and the start.
Critical Path Analysis - Worksheet
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
Critical Path Method(CPM)
UNIT II Scheduling Procedures & Techniques FLOAT
Activity networks – Example 1
Project Scheduling Lecture # 1.
Project Management for Business
Critical Path Analysis (CPA)
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
Chapter 6: Project Time Management
Analysing the AoA network
Project management (seminar)
Analysing the AoA network
Analysing the AoA network
1 Total Slack A 3d Task Early Start Late Start Early Finish
Activity on Node Approach to CPM Scheduling
Combining Gantt charts and PNTs
Combining Gantt charts and PNTs
Analysing the AoA network
Project Management (lecture)
Critical Path Analysis
Critical Path Analysis
Project Planning By Phaik San Liew.
Project Management (lecture)
CPA – Information Sheet
Project management (seminar)
Analysing the AoA network
Combining Gantt charts and PNTs
Project Management (lecture)
Project Management (lecture)
Multiple dependency activity on node (AoN) networks
Multiple dependency activity on node (AoN) networks
Critical Path Analysis
Presentation transcript:

Multiple dependency activity on node networks (seminar)

Four possible dependencies between activities Finish-to-start (or normal) dependency Start-to-start dependency Finish-to-finish dependency Start-to-finish dependency

Finish-to-start (or normal) dependency a 3 b 7 9 2 4

Start-to-start (or lag-start) dependency 4 a 3 b 4 6 2

Finish-to-finish (lag-finish) dependency 4 a 3 b 5 7 2

Start-to-finish dependency 4 a 3 b 2 4

Dependencies can be used in combination Start-to-start & finish-to-finish: 5 ? ? a 3 ? b 5 9 ? 7 2 6

Floats on multiple dependency networks Total float = LFT – EST – Duration Early total float = LFT – EFT Late total float = LST – EST In case of multiple dependence free float cannot be calculated

Calculations with finish-to-start lags b 3 3 f 3 1 a 3 c 3 e 3 h 3 2 4 5 g 3 d 3 1 2

Calculations with finish-to-start lags 6 a 3 b 6 9 12 15 c 7 10 f 20 23 d 4 13 e 18 g 21 24 h 27 5 1 2 3 6

Various dependencies Dangler activities! b f a c e h g d 3 5 1 2 4 5 2 1 c 3 e 4 h 3 2 4 5 g 5 2 2 d 4 1

Various dependencies b f a c e h g d 3 5 1 2 4 5 2 2 1 2 1 3 4 3 5 4 4 6 13 14 19 2 3 f 9 19 10 20 1 5 1 a 1 c 5 8 3 e 13 17 4 h 20 24 1 21 3 2 4 5 g 17 22 5 2 2 d 2 5 16 18 22 4 1

Practicing b 3 d 2 1 4 a 4 2 e 4 5 c 7 3

Practicing b 4 7 9 13 16 3 d 8 10 9 17 19 2 1 4 a 4 2 e 19 23 4 5 c 9 16 7 3

Reading Textbook chapter 15