OCP Open Bridge Rack > OBR Denis Blouin Belden

Slides:



Advertisements
Similar presentations
© DIAMOND Headquarters / F-3000 r & rs / / 1 WERE WELL CONNECTED F-3000 r & F-3000 rs connectors.
Advertisements

Computer Room Requirements for High Density Rack Mounted Servers Rhys Newman Oxford University.
HYDRAULIC SCISSOR LIFT TABLES Model - DLT-5/10/20/30 Capacity: 500/1000/2000/3000 kg.
BPS12 Battery Power Supply. December 2003 Page 2 Better Than Standard UPS systems Longer battery life –unique charging scheme DC power output –instead.
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE.
1 Presentation Protect ph ~ / 3 ph ~ transformerless 3 ph ~ / 1 ph ~ 3 ph ~ / 3 ph ~ PROTECT PROTECT PROTECT PROTECT
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets ATCA Systems Technology Meeting CERN Genève.
Presentation of product. Production capacity New heater For 15 years VTS Clima Group has been a leader in industrial heating engineering. Volcano VR.
Drawer Systems Smart Slide Slidea Smart Box
Round Table: The Global Financial Crisis: Alternative Architectures of Financial System Shyam Sunder, Yale School of Management First Mediterranean Critical.
DIN Rails By Erik Flum 11/29/06. Background DIN rails are a standardized 35mm metal rail with a hat-shaped cross section. Widely used in Europe, becoming.
Components and Architecture CS 543 – Data Warehousing.
Automation Simplified conveyor system It is a system of mechanical handling equipment that moves materials from one location to.
Emerson Network Power Datacenter Infrastructure Solutions for Business Critical Continuity Many Needs, One Answer. May 28 th 2010.
Quadna Field Installation Expert Field Installation Including Start-up and Commissioning Field Service Quadna Field Installation Expert Field Installation.
German Engineering for British innovation. RS1 = Is there any chance to make our clamps even smarter? + The answer is clearly: “ YES! ”
Creating Interactive Course Assignment Pages The OSU Libraries ICAP Project Coalition for Networked Information Fall 2007 Task Force Meeting Kim Griggs,
Fronting Tomcat With Apache V0.1 – Nguyễn Bá Thành Software Manager, Game Platform & Integration.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Date of download: 6/25/2016 Copyright © ASME. All rights reserved. From: Efficient Predictions of Unsteady Viscous Flows Around Bluff Bodies by Aerodynamic.
Clamping & Braking Elements - hydraulically
Energy Conference and Exhibition 2007 Best Practices for Energy-Efficiency in Critical Power Applications Kit Killingsworth.
Belden Electronic Components in Dubai
Dell EMC Modular Data Centers
Delta’s Contribution for OCP Solution 2014
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
VMS Encoding, Decoding & Display
Emerson Network Power Datacenter Infrastructure
CIIT-Human Computer Interaction-CSC456-Fall-2015-Mr
OCP for Telco The challenge and the solution
Material definition & properties Shipment Configuration
HYDRONIC HVAC: The Most Comfortable and Efficient System
HYDRONIC HVAC: The Most Comfortable and Efficient System
Platform for Target Spectrometer using linear montion drive Rexroth
Proposed changes to the EEC UN Regulations 29
Consecutive Dispensing
Basic Computer Networking at the Toolik Field Station
Date of download: 11/13/2017 Copyright © ASME. All rights reserved.
Date of download: 12/25/2017 Copyright © ASME. All rights reserved.
DIGITAL POWER AMP Xib4 [LINEA RESEARCH]
The mission of YY-W2xx Server Chassis
Things You Should Know About Cantilever Rack
Design Package Contribution for Project Olympus US1-EPYC
Section 1.0 — Fundamentals and General
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 Data Center Rack & Enclosure.
ANSI/ASHRAE 90.4 Energy Standard for Data Centers
Carrier Grade OCP Open Solutions for Telecom Data Centers October 2016
ActivRAC® 7M Mobilized Storage System
Roller Shade system from Hunter Douglas
Physics 111 Practice Problem Solutions 01 Units, Measurement, Vectors SJ 8th Ed.: Ch , 3.1 – 3.4 Contents: 1-7, 1-9, 1-10, 1-12, 1-15, 1-21* 3-5,
Representing SIMCO Machinery in North America
Representing SIMCO Machinery in North America
Material definition & properties Shipment Configuration
OCP for Telco The challenge and the solution
JC22 SERIES CONNECTORS Product Bulletin
West Point Bridge Designer
FS ” Maximum Blade Capacity 9 HP Honda engine Weight – 141Lbs
Update on Multi Vendor Interop Project.
Standardization Issues
Examples of mechanical coupling devices
Suspension arm system.
OCP Adoption in Datacenter, Legacy Facility, and Telco
Pallet Containers.
Productdevelopment TVE / RG22
OCP Engineering Workshop Rack & Power, Advanced Cooling Solutions, Data Center Facility
OCP Engineering Workshop Hosted by Flex
LINAC 3 Meeting ICL machines Injectors
REESS mechanical integrity test structure
Presentation transcript:

OCP Open Bridge Rack > OBR Denis Blouin Belden Product Line Manager, Infrastructure Solutions denis.blouin@belden.com, 803-493-2634

19” mount std … EIA-310-E (1934 > 2005)

Broader adoption … leveraging existing infrastructure; at your own pace … Allowing installed rack to be converted to OCP standard … Most installed rack in last 2-3 years are wider (28-30”) and deeper (48”), prone to conversion to OCP compatibility

Broader adoption … industry specific security regulations Rack allowing meeting specific security, access requirements

Broader OCP adoption … cooling and air handling compatibility … rack allowing integration into various cooling approach …

Belden Open Bridge Rack - OBR Compliant with EAI & Open rack standard 28”W x 48”D x 89”H (40 OU – 48 RU) 710mm x 1220mm x 2260mm Field conversion EIA>OCP>EIA>OCP +/- 40 min. operation 1000 kg dynamic load capacity, 1350 kg static load (on going testing)

OBR rack conversion components … Quick conversion from EIA to OCP ….

Open Rack Cross Section Rack Columns Key OCP dimensions… front to rear relative rail positioning critical, major difference to EIA-310 Open Rack Cross Section Rack Columns Ref. Open Rack Standard V1.1, p.8 Figure 6: Open Rack Cross-Section Ref. Open Rack Standard V1.1, p.6 Figure 3: Open Rack Front Detail

Belden Open Bridge Rack - OBR Compliant with EAI & Open rack standard Field conversion EIA>OCP>EIA>OCP +/- 40 min. 1000 kg dynamic load capacity, 1350 kg static load (on going testing) Rail location tool insuring all rack meeting OCP requirements

Thank you ! Denis Blouin Mechanical Eng., Belden PLM Infrastructure Solution Products denis.blouin@belden.com 803-493-2634 Thank you !