iALMA WP4 – ALMA band 2 passive components

Slides:



Advertisements
Similar presentations
Demetrio Magrin INAF – Astronomical Observatory of Padova Optical Design Catania, 11/06/2014.
Advertisements

Using Surfcam to Produce a Numeric Control (NC) Program An Introduction to the CAD/CAM Process Instructions for 3 Axis Programming Using the D&M CNC Milling.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
 RSM TM is an important component in the processes of  DESIGN,  MANUFACTURING,  MAINTENANCE and  REPAIR of PARTS and WELDED ELEMENTS RESIDUAL STRESS.
An Introduction to mini-SONG Project Xiaojun Jiang Natioanl Astronomical Observatories Chinese Academy of Sciences.
The Evaluation of Cutting-Force Coefficients Using Surface
Fundamentals of Information Systems, Second Edition
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
2 nd collaboration meeting on X-band Accelerator Structure Design and Test-Program Structure fabrication Comparative analysis of disk and quadrant manufacture.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
CDL Band 2 Design Study Kickoff Meeting Goals of this meeting – Finish in one hour – Everyone upon leaving knows their role and responsibility and how.
Status of X-band program at RadiaBeam
Universities Space Research Association Page 1 HAWC Optical and Photometric Specifications 27 July 2007.
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
ICT Coordination and Planning Meeting #1 (17-19 April 2013) ALMA Dashboard 1.0 Giorgio Filippi The Atacama Large Millimeter/submillimeter Array.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
Aldo Dell'Oro INAF- Observatory of Turin Detailed analysis of the signal from asteroids by GAIA and their size estimation Besançon November 6-7, 2003.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
Medical Device R&D / manufacturing in Mexico for worldwide markets Summary of Technical Capabilities ZIPTEK MEXICO SA DE CV.
MULTI-FREQUENCY OBSERVATIONS USING MULTIFEED SYSTEMS ALESSANDRO ORFEI, INAF-ORA (IRA) (Istituto Nazionale di Astrofisica-Osservatorio di Radioastronomia)
Frayer (1) The GBT 4mm Rx David T. Frayer (NRAO) Instrument’s purpose: GHz spectral-line science {Called “4mm” since middle of band is 80GHz (3.75mm)
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Band-2 Prototype Cartridge Project – Summary for ASAC meeting Optical design was completed, implemented and characterized. MMIC CLNA designs complete,
Istituto Nazionale di Astrofisica - Osservatorio Astrofisico di Arcetri Radionet ERATec On the development of mm passive components for ALMA Renzo Nesti.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
The MesoMill™ An Off-The-Shelf Small Milling Machine By Roger Cortesi MIT Precision Engineering Research Group.
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
11 Apr The Versatile Link Project CERN CERN Jan Troska, Francois Vasey, et al. Jan Troska, Francois Vasey, et al. Oxford Oxford.
CNC Programming Lathe Axes Designation Lathe Lathe Axes Designation.
Industrial Laser Cutting Machine Navigator KS based on fiber laser and linear motors JSC VNITEP (Russia)
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
Rewriting the Band 6 Cartridge Test System + Phase Stability
SNS COLLEGE OF ENGINEERING
Thermag VII Torino Italy
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Jim Fast Pacific Northwest National Laboratory
Status of BPMs and Electronics System at KNU.
Beam Measurement Characterization and Optics Tolerance Analysis of a 900 GHz HEB receiver for the ASTE telescope Alvaro Gonzalez, K. Kaneko, Y. Uzawa.
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Composite Mirror Applications, Inc
IR Detector - Test cryostat : Machining
An FP5 RTD programme Participants: University of Manchester: UK
Warm structure requirements :
Analytical Cost Model (16 T dipole)
iALMA WP4 – ALMA band 2 passive components
Status of the PANDA Solenoid Magnet Production in BINP
Using Surfcam to Produce a Numeric Control (NC) Program
Atacama Large Millimeter Array
Lathe Operations. Lathe Operations Lathe Operations.
NC and CNC machines and Control Programming
EVLA Advisory Committee Meeting System Status
Eastern Mediterranean University Department of Mechanical Engineering
Mark McKinnon EVLA Project Manager
Operations Perspective
Downingtown Area Robotics
3D sensors: status and plans for the ACTIVE project
Sterling Industries.
PROPOSAL TO INCLUDE FREE FORM MIRRORS IN REG. ECE 46.06
Presentation transcript:

iALMA WP4 – ALMA band 2 passive components Science and Technology in Italy for the upgraded ALMA Observatory WP4 – ALMA band 2 passive components Renzo Nesti

Outline WP4: Summary WP4: Development WP4: Risks WP4: Devices WP4: Done some preliminary work WP4: Band 2 or Band 2+3 ?

WP4 Summary Development of new technology and instrumentation for ALMA Aimed to develop a prototype band 2 cartridge for ALMA Design prototyping and test of band 2 passive front-end: Refocusing Mirror System (MIRRORS) Corrugated feed horn (Feed) Orthomode transducer (OMT) Band 2 Vs Band 2/3 from the passive front-end point of view

WP4 Summary External Links Management Science Receiver Laboratory Green E Outreach WP4 Passive Components WP5 Cartridge Prototyping WP9 Cartridge Electronics/SW

WP4 Development First year activity

Activity in subsequent years WP4 Development 1st year activity enhancement due to the work done in the recent meanwhile with respect to the original proposal Engineering of FEED, OMT and possibly MIRRORS Fabrication of FEED, OMT and possibly MIRRORS Activity in subsequent years 2nd year activity Set up facilities and environments for measurements Software development for data acquisition and processing Electromagnetic test on FEED, OMT and MIRRORS 3rd , 4th year activity Test analysis and critical design review Test report and WP4 documentation production Support to WP5 activity (cartridge system)

WP4 Risks Hardware: Prototyping of Feed, OMT and mirrors (1st year), mainly with band 2/3 specs Testing (2nd year): Procurement of VNA@100GHz (1st year, call for tender)

WP4 Devices Mirrors or lens ? J. W. Lamb et al. ‘ALMA Receiver Optics Design’ ALMA Memo 362, Apr 2001

WP4 Devices Mirrors Cold or Warm Optics ? GBA + PO

WP4 Devices Feed

WP4 Devices Feed Array of 7 elements at Q band High reproducibility High software accuracy About 20 micron tolerances

WP4 Devices CW_y OMT CW_y CW_x CW_x X Y

WP4 Devices OMT CNC machining prototype at Q-Band High reproducibility High software accuracy About 20 micron tolerances

WP4 Devices OMT Measurements

WP4 Band 2 or band 2+3 ? Band 2 to Band 2+3 extension: Passive front-end design more difficult. One reason…..

WP4 Done some preliminary work ALMA Band 2+3: Electroformation hypothesis Copper elettroformation hypothesis About π x 20 x 20 x 40 mm3 volume About 30 g weight

WP4 Done some preliminary work ALMA Band 2+3: Lathe hypothesis 44 aluminum lathe machined plates About π x 36 x 36 x 60 mm3 volume About 90 g weight

WP4 Done some preliminary work ALMA Band 2: CNC milling hypothesis 8 aluminum equal-thick layers sandwiched by two plates About 43 x 43 x 30 mm3 volume About 100 g weight

WP4 Done some preliminary work ALMA Band 2/3: CNC milling hypothesis 11 aluminum not equal-thick layers sandwiched by two plates (8 AND equal-thick) Minimum milling tool diameter of 0.5 mm (1 mm) About 46 x 46 x 38 mm3 volume (43 x 43 x 30) About 150 g weight (100 g) (vs Band 2 OMT features)