CNC CIGRE SC COMMITTEE MEETING October 4, 2009 Toronto, Ontario SC – B1 Insulated Cables / Câbles Isolés Ray Awad, Hydro Québec TransÉnergie.

Slides:



Advertisements
Similar presentations
The Public Finance and Empoyment Database of the OECD Dirk Kraan National Accounts Working Party Paris 1 December 2010.
Advertisements

ZAE BAYERN Techniken für Energiesysteme und Erneuerbare Energien Dipl. Phys. Manfred Reuß 05/2012 IEA ECES ExCo in Lleida IEA ECES Annex 27.
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
CIGRE 2012 A brief report regarding B1 and D1 activities (related to cables) Ray (Refat) Awad
INTRODUCTION TO THE IEC AND THE ACEC EMC WORKSHOP Buenos Aires, Argentina – Diethard E.C. Moehr Secretary IEC TC 77 (EMC)
Current issues and trends in bibliographic control Overview of the Division’s interests and activities Bibliography Section Bohdana Stoklasova, Chair Talbott.
International Energy Agency Energy Conservation in Buildings and Community Systems Programme - ECBCS IEA Energy Conservation in Buildings & Community Systems.
Frankfurt (Germany), 6-9 June 2011 CIRED st International Conference and Exhibition on ELECTRICITY DISTRIBUTION Opening Forum Sven Lindgren President.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
11 th International Symposium Loss Prevention and Process Safety Promotion in the Process Industries 1 OECD Workshop on Sharing Experience in the Training.
Miles Shepherd Chairman ISO Technical Committee 258.
Sustainable Energy Systems Int’l H 2 Safety Conf, Pisa, Italy, 8-10 Sep IPHE projects focus on pre-competitive collaborative research, development.
1 OECD Work on the Safety of Manufactured Nanomaterials Environment, Health and Safety Division Environment Directorate OECD.
Leaders in Asset Management ISO Asset Management Systems 1 Prepared by Jim Dieter, MIAM CPPM CF NPMA Executive Vice President Director of Strategic.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
Information Security Management – Management System Requirements, Code of Practice for Controls, and Risk Management supervision Assistant Professor Dr.
STEP MANAGEMENT OVERVIEW STEP ISO ORGANIZATIONAL STRUCTURE Module 7 Estimated Viewing Time: 40 minutes.
9/4/20151 Cigre WG B1.41 Meeting Long term performance of soil and backfill of cable systems Milan, Italy Mar , 2013 Walter Zenger, USA Convener.
Introduction to ISO International Organization for Standardization (ISO) n Worldwide federation of national standards bodies from over 100 countries,
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba.
The Iterative Process of Project Planning 13 Structure the project
OECD Review of Russian Statistics Peer Review Mission to Russia April 2012 Tim Davis Head, Global Relations, Statistics Directorate.
GLP & Quality Assurance
1 Conference on U.S. Leadership in ISO and IEC Technical Committees Presented by Doug Durant Manager Product Strategic Standards, John Deere PEC Chair,
Environmental issues and local development Partnerships and the Green Economy Styria, 11 th October 2010 Gabriela Miranda
Conformity Assessment and Accreditation Mike Peet Chief Executive Officer South African National Accreditation System.
OECD Short-Term Economic Statistics Working PartyJune Establishing guidelines for creating long time series for short-term economic statistics.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
The Global Earth Observation System of Systems (GEOSS) A New Approach to Prevention, Early Warning & More Rapid Problem-Solving Vice Admiral Conrad C.
1 The World Road Association (PIARC). 2 A non-profit association founded in 1909 to promote international cooperation in issues related to roads and road.
Frankfurt (Germany), 6-9 June 2011 SmartLife Guillaume & SmartLife Core Group – France – S1 – Paper SmartLife initiative in Focus.
© Enterprise Europe Network South West 2009 The Eurostars Programme Kenny Legg R&D Funding for the Environmental Sector – 29 June 2010 European Commission.
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
Introduction to the OECD. 4 key questions Who are we? What do we do? How do we do it? What happens next?
GIGRE in the Dynamic Change of the Electric Power Sector GIGRE in the Dynamic Change of the Electric Power Sector Klaus Fröhlich President of CIGRE.
IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components.
IASC Mission IASC is a non-governmental organization whose aim is to encourage and facilitate cooperation in all aspects of Arctic research, in all countries.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
CNC CIGRE SC COMMITTEE MEETING September 19, 2008 Winnipeg SC – B1 Insulated Cables / Câbles Isolés Ray Awad, Hydro Québec TransÉnergie.
Strategic Management and Strategic Competitiveness
Protection Specialist
Batteries, chargers and charging stations
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
HIMSS STANDARDS INITIATIVES
ISO TC268 SC1 - Smart Community Infrastructures -
Evolution of the IECEx Scheme – Ex TAG Training Workshop Shanghai
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Evolution of HV Cable Systems
Electrification Products
ETSI update on Radio Frequency Identification
Electricity Distribution Network Design Training & Courses
Support to National Helpdesks
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
ICT & Environment Seminar
Marine Strategy Framework Directive: an introduction
A Global Approach for Ex-Products
دائرة الإحصاءات العامة
Development of a protocol for identification of reference conditions, and boundaries between high, good and moderate status in lakes and watercourses (REFCOND)
Standardization Management Board Decisions How They Affect Your TAG!
State of play of OP negotiations
The Public Finance and Empoyment Database of the OECD Dirk Kraan National Accounts Working Party Paris 1 December 2010.
Outline of the EU greenhouse gas emission trend report
A Framework for the Governance of Infrastructure - Getting Infrastructure Right - Jungmin Park, OECD Budgeting & Public Expenditures Division 2019 Annual.
National action plans to combat forced labour and trafficking:
Joint Action on Market Surveillance of medical devices (JAMS)
Presentation transcript:

CNC CIGRE SC COMMITTEE MEETING October 4, 2009 Toronto, Ontario SC – B1 Insulated Cables / Câbles Isolés Ray Awad, Hydro Québec TransÉnergie

SC – B1 Field of activity of the Study Committee The field of activity of SC B1 concerns the development and operation of all types of AC and DC insulated cable systems for land and submarine power transmission (preferably HV and EHV cables and accessories). Within this field, the scope of work of the SC covers theory, design, applications, manufacture, installation, testing, operation, maintenance and diagnostic techniques of insulated cables.

SC – B1 Mission of the Study Committee To facilitate and develop the exchange of engineering  knowledge and information between engineering personnel and technical specialist in the field of insulated cables; To add value to such knowledge and information exchanged by synthesising state-of-the-art and world practices; To make managers, decision-makers and regulators aware of the syntheses of SC B1's work in the field of insulated cables.

SC – B1 Goals of the Study Committee To contribute effectively to the progress of insulated cable systems technology; To facilitate the integration of insulated cable systems in electric power networks and in the environment, covering the complete life cycle of cables; To maintain its leading position in the field of power cables by providing unbiased and neutral information on all essential cable aspects systems; To be recognised by the Electric Power Industry (EPI) as a leading and reliable partner with competence in all engineering issues related to insulated cable systems, i.e. technical, economical, ecological and social.

SC – B1 Composition of the Study Committee   The SC currently consists of  a Chairman, a Secretary, 24 Regular Members and 8 Observer Members.   The 24 countries represented by Regular Members are Australia, Austria, Belgium, Brazil, Canada, Denmark, Finland, France, Germany, Ireland, Italy, Japan, Korea,  Norway, Poland, Portugal, Russia, South Africa, Spain, Sweden, Switzerland, The Netherlands, United Kingdom and United States whilst the 8 countries represented by Observer Members are China, Croatia, Egypt, India, Israel, Malaysia, Mexico, and Romania. The 34 constituents of the SC come from Utilities (11), Manufacturers (15) and Universities/Institutes (8).

SC – B1 Strategic Advisory Group (SAG) SAG will assist the chairman in the definition of the strategic direction of SC B1 SAG will initiate the set up of new WGs Duration: Permanent Many Working Groups are expected to finish their work by the end of 2009 and presented their preliminary reports in Poznan, Poland . The term "Task Force" will not be used, only "Working Group".

Customer Advisory Group (CAG) convener : E. Bergin (IR) SC – B1 Customer Advisory Group (CAG) convener : E. Bergin (IR) A common communication strategy of all SC CAG's should be establish through TC. CAG should consider if it is possible to improve the Paris session format. Duration: Permanent Identification of Target Group Communication means with TGs Collection and mapping of TG’s needs Collection and evaluation of feed-back from TGs Deliverables: report twice a year. external actions approval SC Chairman and the SAG

SC – B1 Tutorials Advisory Group (TAG) Convener : P. Argaut (FR) Duration: Permanent Target Groups : Students and young engineers; Teachers / lecturers in education and training bodies; Engineers and managers in the electrical power sector (including civil works); Public; Examples of topics to be covered: Physics : ageing mechanisms, insulation materials; Components & Products: design, testing, cables, accessories; Power system impacts : technical and environmental impacts; System design:insulation coordination, thermal design; Construction and installation: innovative techniques; Maintenance; Asset Management; Environmental Impact Assessment.

WG B1-08 (Completed 2009) convener : R. AWAD (CA) Cable systems in multipurpose or shared structures SC B1 decided to launch a WG to investigate all aspects related to the co-existence of cable transmission systems and other installations mainly in tunnels and bridges; The possibility of using existing structures like railway and motorway tunnels, subways, bridges, gas, water and sewage supplies etc. for the simultaneous installation of electrical power transmission systems is becoming more and more attractive with regard to construction cost, right of way etc. The questions behind this option are not only technical and economical but are also related to mutual impacts during construction, normal operation and hazards, environmental compatibility, safety risks and legal and administrative issues.

WG B1-10 (Completed 2009) convener : B. Rosevear (UK) Update of service experience of HV underground and submarine cables Activities Information and documents pertaining to previous studies on experience and reliability have been obtained; It has been decided that it will be necessary to prepare two questionnaires in order to collect the data; In order to facilitate and encourage replies, the questionnaire will be concise and made as simple as possible. Questions will be focussed only on the information required to complete the task; Two task teams have been formed to develop draft questionnaires – one for Land cables and a separate task team for Submarine cables; Definition of terms used within the questionnaire are being developed; The survey on land cable systems will cover the years 2000 to 2004 inclusive; The submarine cable system survey will cover the period from 1991 to 2004.

WG B1-11 (COMPLETED 2009) convener : F. Lesur (FR) Upgrading and up-rating of underground cable systems Upgrading: Applying a solution that leads to improve the performance of a cable system. The performance refers to at least one of the function or property of the cable system: transmitted power, service life, environmental impact, safety. Up-rating: Applying a solution that allows a cable system to be operated at a current level above its rated current: reassessing the current rating (overload conditions, thermomechanical stresses, temperature monitoring, dynamic temperature rating, new calculation procedures, new design parameters); decreasing losses (in metallic sheathes, in neighbour cables, in metallic structures or pipes); increasing heat transfer (forced cooling, ventilated tunnels, special backfills, filling ducts, irrigating ground surface, hot spot mitigation).

WG B1-22 (Completed 2009) convener : K. Leeburn (ZA) Cable accessories workmanship Trends identified: More Stress, Installers, Systems, Speed; Larger conductors, Length; Monitoring (Thermal, pd), Prefab; Less Technical focus (Commodity), Skills (Supervisors, MV migration); Change Foil Sheaths, Dry terminations, Water block; Enamel wires.

WG B1-23 (2006-2010) convener : H.Orton (CA) Impact of EMF on current rating and cable systems Terms of reference Define the correct terminology Review practical EMF management methods Review practical design and construction considerations Review the cost effectiveness of different methods Quantify cable ampacity de-rating aspects of the various field management methods The WG will neither cover any environmental or biological effects of EMF, nor discuss any specific levels of EMF

WG 24 (Completed 2009) Convener: Marco Marelli (IT) Test procedures for HV transition joints Terms of reference: Review the range of transition joints (TJ) currently available Review the existing international standards on TJ testing Align voltage levels to those specified in the IEC standards for extruded cable systems Propose test regimes for TJ and their associated cables. Type, routine, sample and after laying tests should be considered.

WG B1. 25 (completed 2009) Convener: Pierre Maribeau (FR) Advanced Design of Laminated Metallic Coverings Terms of reference: Review and update the test as on cables with extruded insulation and laminated protective coverings Issue a guide to use for non experts explaining what could be the different cable designs

Active Working Groups WG B1.28 On site Partial Discharge Assessment WG B1.29 Guidelines for maintaining the integrity of XLPE transmission accessories WG B1.30 Cable systems electrical characteristics WG B1.31 Testing of superconducting cable systems (TF) WG B1.32 Recommendations for testing DC extruded cable systems for power transmission at rated voltages up to 500 kV JWG B1/B3.33 Feasibility of a common, dry type system up to 500 kV

NEW TF (terms of reference TBD by 2010) TF B1.34 Mechanical forces in large cross section cable systems (J. Kaumanns) TF B1.35 Cable rating (F. de Wild) TF B1.36 Life Cycle assessement and environmental impact of U/G Cable Systems (R. Awad) TF B1.37 Guide for operation of Fluifd Filled Cable Systems (C. Peacock)

Future meetings of B1 SC Paris, France, end of August 23-28, 2010 Shnaghai, China June 2011 Jicable'2011 Versailles June 19-23, 2011 WETS 2011 Long Cable Links (Paris June 2011)

Preferential subjects for the 2010 session Technical challenges overcome in newly installed underground and submarine cable systems Current state-of-the-art in the designof AC and DC, submarine and underground traditional cable systems. Current state-of-the-art in cable system instllation techniques

Preferential subjects for the 2010 session 2. Key factors in current and foreseen development of cable systems Environmental impact Balancing investement costs (including costs of right of ways) vs life time costs (including costs for operation and maintenance, social costs, losses, dismanteling etc.)

Preferential subjects for the 2010 session 3. State-of-the-art and trends for cable system testing Qualification, type testing, routine testing, sample and after installation. Representation of installation and operational stresses in testing Diagnostic testing of cable systems