Report from ICFA neutrino panel

Slides:



Advertisements
Similar presentations
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Advertisements

Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
DOE Neutrino Program Plans
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
The meeting in Paris: The agenda has been built and optimized.
ISS After One Year Peter Dornan Imperial College London.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Independent Monitoring & Evaluation for Accountability Presented to Health Sector Steering Committee, 21 st July 2009.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
European Strategy for Particle Physics Proposed Draft to the CERN Council ECFA Linear.
ICFA Report to Lepton-Photon 2015 July 2014 to August 2015 J. Mnich (DESY) August 21, 2015.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
The European Strategy Group (ESG) The remit of the ESG is to establish a proposal for an Update of the medium and long- term European Strategy for Particle.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Dave Barney, Michael Kobel Overview Key objectives Motivation Next Steps.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria November 8, 2014RECFA UK1.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Long Baseline Neutrinos How we got here Nigel S. Lockyer Fermilab Open Meeting on Neutrinos 12/12/2014.
Strategic Advisor for Social Work and Social Care Research.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
What was the goal of the International Meeting ? –Involve world-wide project leaders and agency responsibles to set-up instruments for the encouragement.
Goals of the consultation meetings From the ToR, the goals of the meeting in the first year should be: communicate that the panel exists; collect input.
The CERN Near Detector(s) initiative
Well Trained International
Strategic Advisor for Social Work and Social Care Research
Final Discussion THE EUROPEAN STRATEGY FOR FUTURE NEUTRINO PHYSICS
IT Strategy Roadmap Template
Transition Implementation Status Reporting
The European Strategy for Particle Physics
E-Rare and IRDiRC: Future collaboration perspectives?
Collaboration Board Summary
Transition Implementation Status Reporting
The Way Forward ISS to IDS
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Update on FIM4R David Kelsey
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Status report on the activities of TF-CS/OTA
Presentation to the GAC: A preliminary presentation of the Capacity Building program evaluation Alice Munyua 25 June 2018, ICANN 62, Panama.
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
FALC report and KEK’s plan for the ILC
Gas Regional Investment Plan project
ICFA Neutrino Panel: Roadmap discussion document
Operations sustainability
Roadmap for Programme of Work
AMICI WP1 – Management, coordination and dissemination
SOCIAL DIALOGUE WITHIN EUPAN
ESS Standardisation State of play
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
IUPAP Neutrino Panel.
Exit Capacity Substitution and Revision
PORTUGUESE PRESIDENCY MANDATE FOR SOCIAL DIALOGUE
ASTRONET Coordinating strategic planning for European Astronomy
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Draft Mandate and Proposed Approach for the Drafting Group on
ICFA Report to FALC June to November 2015 J. Mnich (DESY)
Second Independent Evaluation of UNAIDS
1.
Extension of the European statistical programme Roadmap
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Pilot of revised survey
Task Force Peer reviews and quality Eurostat
Presentation transcript:

Report from ICFA neutrino panel D. Duchesneau June 6th 2016 The Third International Meeting for Large Neutrino Infrastructures Agenda: https://kds.kek.jp/indico/event/20176/other-view?view=standard#20160530.detailed organized by KEK, ICRR, Fermilab, the Astroparticle Physics European Consortium (APPEC), the ICFA Neutrino Panel, the IUPAP Astroparticle Physics International Committee (APPIC) and several worldwide funding agencies took place at KEK on the 30th and 31st of May 2016

ICFA Neutrino Panel: Roadmap discussion document Excerpts from Ken Long’s talk at the KEK meeting on 30/05/16 ICFA Neutrino Panel: Roadmap discussion document

Contents The Panel and its mission Roadmap discussion document Next steps

The Panel and its mission ICFA nuPanel: roadmap discussion document The Panel and its mission http://icfa.fnal.gov/panels/neutrino_panel/

http://icfa.fnal.gov/panels/neutrino_panel/

Asia: 5 Americas: 5 Europe: 5 + chairman

Roadmap discussion document The terms of reference for the ICFA Neutrino Panel require the Panel to develop a roadmap for the accelerator-based neutrino-oscillation programme. ICFA nuPanel: roadmap discussion document Roadmap discussion document Version May 7th, 2016

https://kds.kek.jp/indico/event/20176/material/0/ http://icfa.fnal.gov/wp-content/uploads/2016-05-07-nuPanel-roadmap-Final.pdf https://kds.kek.jp/indico/event/20176/material/0/

Discussion document Documents: Evaluation: Panel derived interim: Approved objectives for experiments in operation Approval, construction/exploitation timeline for experiments under consideration Proposed timeline for experiments not yet under consideration Evaluation: Evolution of precision of SvM mixing parameters Panel derived interim: Branch points based on evolution of precision Recommendations on development of programme

Roadmap goals Vibrant programme must: Have discovery potential & deliver critical measurements in the short and medium term: Present and next-generation experiments Implies parallel theory and phenomenology programmes Develop the capabilities required to out-perform the present and next-generation experiments: Implies detector and accelerator R&D programmes

Accelerator-based neutrino community Complete, consistent census unavailable Panel assembled partial information: Europe: ECFA census of European particle-physics community 2009 The Americas: Number of researchers involved in FNAL-based neutrino experiments Canadian survey of particle-physics community prepared during 2015 long-range planning exercise Asia: Asian panel members conducted an ad hoc “mini survey” of the accelerator-based neutrino community

Accelerator-based neutrino community Asia: Europe, 2009 ECFA survey: Of particle physics community: 10% (1000) involved in neutrino experiments; Of these, 40% (400) involved in accelerator-based programme Americas: Canada, 2015 survey: 105 involved in neutrino expts 35 involved in accelerator-based programme

Accelerator-based LBL nu-oscillation programme

Synergy and complementarity Running experiments: T2K & NOvA: Complementary: baseline, technology, beam Synergy: enhanced discovery potential in combination Going forward: DUNE & Hyper-K: Yasuda-san: Complementary approaches, synergy in measurement On the complementarity of Hyper-K and LBNF ICFA Neutrino Panel; arXiv:1501.0391

Accelerator-based LBL nu-oscillation programme

Accelerator-based LBL nu-oscillation programme

Sterile-neutrino searches at accelerators

Sterile-neutrino searches at accelerators

Supporting programme + + + + + + Collaboration lists taken from “parent” collaboration.

Supporting programme

Supporting programme

Supporting programme

Roadmap next steps Consultation; starts today: Census: With collaborations Collaborations have checked text With neutrino and particle-physics community; Mechanism to be defined With stakeholders: Laboratories and funding agencies Census: Propose to execute through simple questionnaire: Adopt format similar to recent ECFA & ApPEC surveys Well trodden, successful path Data-gathering mechanism, to be defined

Roadmap next steps Formal opportunities for presentation/feedback: Neutrino 2016: London, 4—9 July 2016 Finalise roadmap through autumn 2016: Propose: Deliver final roadmap document at Feb17 ICFA meeting Beyond the ICFA Neutrino Panel: How to maintain and enhance what has been done? How to recognise breadth of field? Neutrino Panel mandate is accelerator-based programme

ICFA nuPanel: roadmap discussion document Backup

Census Propose to execute through simple questionnaire: Adopt format similar to recent ECFA & ApPEC surveys Well trodden, successful path Proposed timetable: 09Jul16: finalise questionnaire (Neutrino ’16) 10Aug16: revise after stakeholder feedback (ICHEP ’16) Mid Sep16: launch data gathering Wk 1 Nov16: receive data form stakeholders Wk 1 Dec16: circulate digest of results to stakeholders End Dec16: finalise census section of roadmap doc