The progress of Beam Instrumentation for BEPCII

Slides:



Advertisements
Similar presentations
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Advertisements

Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Progress of the BEPCII Injection System Kang Wen.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
Beam Instrumentation for Orbit Stability I. Pinayev.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
PITZ – Introduction to the Video System Stefan Weiße DESY Zeuthen June 10, 2003.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
Computer Science and Instrumentation Research Opportunities at CLS Johannes M. Vogt Canadian Light Source University of Saskatchewan
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
The Stripping Foil Test Stand in the Linac4 Transfer Line
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
WELCOME TO IHEP. RF Phase Control for BEPCII Linac Accelerator Wenchun Gao.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
October, 2009 Internal Review Beam Instrumentation David Gassner.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
U. Raich CERN Accelerator School on Digital Signal Processing Sigtuna Digital Signal processing in Beam Diagnostics Lecture 1 Ulrich Raich CERN.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
SESAME TL2 and SR Diagnostics
Diagnostics for ThomX N. HUBERT, M. LABAT, M. EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL I. CHAIKOVSKA, N. DELERUE, N. EL-KAMCHI LAL.
Dither Luminosity feedback versus Fast IP feedback
Diagnostic & Control Status
Instrumentation for Accelerators Technologies for the HL-LHC
Summary of experience with Tevatron synchrotron light diagnostics
P. Forck, P. Kowina, M. Schwickert, R. Singh
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
Controls CBETA controls will extend existing EPICS control system
Commissioning the Fast Orbit Feedback System at SSRF
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Fill-pattern Control System for KEKB
ERL BPM System Mike Billing, Mark Palmer
Proton Beam Diagnostics
Beam Current Monitoring with ICT and BPM Electronics
Considerations on Beam Diagnostics Physics
Electron cloud studies at CESR
Non-invasive Beam Position Monitor Research in HUST-PTF
Instability measurement plans at ATF
BEPCII Background Issues: Collimators and Masks
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Commissioning Experience
Breakout Session SC3 – Undulator
CEPC Beam Instrumentation
Presentation transcript:

The progress of Beam Instrumentation for BEPCII Beam Instrumentation Group Accelerator Center, IHEP 2018/9/22 4th-IMAC meeting

Outline Introduction Linac BI progress Ring BI progress Summary 2018/9/22 4th-IMAC meeting

Introduction After the 3rd IMAC meeting, we took full advantage of the great opportunity that the BEPC was operating. Most of the monitor prototypes for storage ring had been tested with beam, such as MX-BPM, DCCT, TFB and so on. We think these test results can certainly promote our work. For the linac, we also did many experiments together with physics people. We measured the electron and positron emittance at different location, the beam energy and energy spread by using analyzing magnet of AM1 and AM3, beam current, two bunches acceleration and beam orbit along the linac by using BPM system. 2018/9/22 4th-IMAC meeting

Linac BI The Linac Beam Instrumentation System consists of BPM, BCT, Emittance Measurement, Profile monitor and EPICS based DAQ system. In the last year, The DAQ system based on EPICS had been built and we successfully completed the system commissioning. There are 5 monitor stations along the linac gallery. Each monitor station consists of a VME computer, a gated integrator for BCT, and a log-ratio BPM, a DG535 for triggering and a signal-switching box. Each monitoring station can control 6 BPMs and 6 BCTs at maximum. 2018/9/22 4th-IMAC meeting

Linac BPM Total of 20 BPM’s 15 Stripline BPMs at each quadruple triplets 1 Stripline BPMs at linac end, 1 Stripline BPMs at pre-injector end, 1 Stripline BPMs near AM3 2 button BPMs at gun exit A computer located in control room can acquire the beam position data through IOC and then to display the beam orbit in real time. 2018/9/22 4th-IMAC meeting

Linac BPM Because of the budget, we have to adopt switching mode for the BPM system. In order to prolong the lifetime of the RF coaxial relay, the data-taking cycle speed at present is about 1Hz for one monitoring station. This data acquisition speed is enough for normal orbit measurement. But in some cases, the fast data-taking can help us to record the beam transverse position for every pulse. We ever considered to adopt solid-state MUX switches to achieve higher switch rates. But after the investigation, we find the solid-state switch has smaller signal dynamic range than coaxial relay and solid-state switch is easily to occur current leakage between different channels. 2018/9/22 4th-IMAC meeting

Linac BPM The BPM data is used for the system resolution analysis. This figure shows a group of data of BPM5. The red line and blue line represent the BPM resolution (RMS values) in horizontal and vertical direction, respectively. This RMS values contain beam orbit oscillation and BPM system error. By comparing the horizontal and vertical direction, we think that the beam orbit oscillation is the main source to affect the system resolution of BPM. For BPM01 and BPM02, the beam position resolution of less than 100 m can be easily obtained. 0.15mm RMS value 0.43mm RMS value 2018/9/22 4th-IMAC meeting

Linac BI After BEPC shut down, the beam instrumentation system of linac was continually improved according to the operation situation. We improved the optical path of AM3 and positron target screen, a new alignment support for BPM01 and BPM02,a molybdenum mesh at the front of screen of PR1 and PR2 in order to avoid the static electron accumulating, and newly installed BPM and fluorescent screen monitor located at the downstream of AM3 and AM2, respectively. In order to measure the beam energy spread non-intrusively, a BPM with 8 stripline electrodes was installed in the large dispersion section of the transport line. 2018/9/22 4th-IMAC meeting

Linac BI the optics path of positron target screen AM3 optics path 2018/9/22 4th-IMAC meeting

newly installed BPM at downstream of AM3 Linac BI 8 stripline electrodes BPM molybdenum mesh newly installed BPM at downstream of AM3 2018/9/22 4th-IMAC meeting

Linac BI BPM01 and BPM02 are located at the gun exit. Due to the tight space, there was no support for these two BPMs to keep the relative position between the BPM and adjacent magnetic unchanged. This time we try to install a alignment support. Alignment support 2018/9/22 4th-IMAC meeting

Linac BI 11 BPMs and 12 Collimators had been installed in transportline. Collimator will be used for the control of beam emittance and beam energy spread. In order to monitoring the transportation efficiency of positron, two beam charge monitors were installed at the end of linac and positron transportline, respectively. Beam Charge Monitor Collimator 2018/9/22 4th-IMAC meeting

Summary of Linac BI The BPM system and beam profile monitor for the positron target play an important role when the positron beam commissioning. The BPM’s sensitivity is enough for the weak positron beam. The device of BCT, Emittance Measurement and Profile can work well. But for BPM system, sometimes the resolution (RMS value) is larger than 0.2mm. Maybe it is caused by the transverse wakefiled, beam energy fluctuation or others. The EMI issue is still to be. 2018/9/22 4th-IMAC meeting

BI of Storage Ring Beam Position Monitor Bunch Current Monitor Syn. Light monitor DCCT Transverse Feedbake System Tune value measurement Beam Loss Monitor 2018/9/22 4th-IMAC meeting

Beam Position Monitor Almost all of BPM blocks have been manufactured by vendor. The cabling in the tunnel was finished. Near half of BPM blocks were calibrated in laboratory by using calibration antenna. The calibration results were double checked by physics group and our group. For the BPM DAQ system, an IOC for MX-BPM electronics had been developed and tested in laboratory. The prototype of digital BPM (Libera) was tested as well. It will be used for the turn-by-turn beam orbit measurement. As for the closed orbit feedback or IR feedback, the hardware is same with BPM system, but the control software will be developed by physics group and control group. 2018/9/22 4th-IMAC meeting

Beam Position Monitor Table: The type and quantity of BPM blocks BPM type BPM quantity Feedthrough Type Antechamber 1 76 15mm, stainless steel, USA Antechamber 2 20 Racetrack type 16 Circular Type 100、150 6 316L-15mm, Japan O-BPM1 2 I-BPM2 10 C-BPM8 CuNi-8mm, Japan I-BPM1 IR Y-type 4 Small aperture 2018/9/22 4th-IMAC meeting

Beam Position Monitor BPM BPM Cable fixing 2018/9/22 4th-IMAC meeting

Beam Position Monitor BPM was being calibrated The curve-fitting X ±10mm, Y ±5mm BPM was being calibrated The curve-fitting Calibration results for antechamber type BPM: Sensitivity: (25.606601, 23.359486) Simulation results by using finite element method: Sensitivity: (25.1, 24.9) 2018/9/22 4th-IMAC meeting

Beam Position Monitor MX-BPM tested results with beam COD mode Resolution < 0.01mm ( I > 5.5mA ) MX-BPM tested results with beam 2018/9/22 4th-IMAC meeting

Beam Position Monitor Chassis Layout for BPM electronics 2018/9/22 4th-IMAC meeting

Beam Position Monitor DAQ structure OPI TCP/IP LAN Sync IOC e+ IOC e+ BPM Station 1 BPM Station 3 BPM Station 1 BPM Station 3 BPM Station 2 BPM Station 4 BPM Station 2 BPM Station 4 BPM Station 5 BPM Station 5 DAQ structure 2018/9/22 4th-IMAC meeting

Beam Position Monitor Development environment 2018/9/22 4th-IMAC meeting

Bunch Current Monitor The bunch current system is consisted of front end circuits, data acquisition and shared memory system. It is distributed in two places. one is in the beam instrumentation station. The other one is in the Central Control Room. 2018/9/22 4th-IMAC meeting

Bunch Current Monitor front end circuits Shared memory 2018/9/22 4th-IMAC meeting

Bunch Current Monitor FADC:ECAD2081500 Sampling clock : 1.5GHz Internal FPGA for DSP programming Schematic drawing of FADC structure 2018/9/22 4th-IMAC meeting

Some experiments done in lab Bunch Current Monitor Some experiments done in lab Build the development environment Install the FADC、shared memory card VMIVME-5565 and a CPU(MVME5100) in a VME computer. Install the VMIPCI-5565 card in a PCI bus based computer. Connect the VMIVME-5565 and VMIPCI-5565 with multimode optic fiber. Download the application program into the CPU. Test the shared memory cards Test the FADC card 2018/9/22 4th-IMAC meeting

Development environment Bunch Current Monitor Development environment 2018/9/22 4th-IMAC meeting

Recovered signal by using sampling points Bunch Current Monitor AD test results Recovered signal by using sampling points Flow chart for AD test 2018/9/22 4th-IMAC meeting

Bunch Current Monitor The front end circuit is same as the Transverse Feedback System of BEPCII. For the FADC board, the AD part has been tested but the FPGA development is in progress. The BCM system should work with the timing system of BEPCII. So we should discuss the data format and injection algorithm with the control group in further. 2018/9/22 4th-IMAC meeting

Synchrotron Light Monitor SRM layout First mirror 2018/9/22 4th-IMAC meeting

Synchrotron Light Monitor The SRM detectors had been manufactured and assembled by vendor. After finished the vacuum checking, we started some experiments on alignment and calibration in our laboratory. The detector supports for the alignment and calibration had been modified according to the experiment results. This figure shows the detector was being aligned. 2018/9/22 4th-IMAC meeting

Synchrotron Light Monitor The calibration of the transverse magnification of the imaging system is needed to obtain measurements of absolute dimensions. This is done in a very simple way by sliding the lens. Displacing the lens a precise value in horizontal plane or vertical plane represents a transverse source point displacement of the same value (but of the opposite sign) and a displacement of the beam spot on the CCD camera of that value multiplied by the system-magnification. 2018/9/22 4th-IMAC meeting

Magnification (simulation value) Synchrotron Light Monitor The calibration of the transverse magnification Calibration results: Laser wavelength: 650nm Lens displacement = 0.150mm Image displacement = 0.3765mm Magnification = 3765/150 =2.51 wavelength Magnification (simulation value) 365nm 2.2 450nm 2.3422 550nm 2.4392 650nm 2.5 2018/9/22 4th-IMAC meeting

Synchrotron Light Monitor Determine the SRM resolution: 10% of vertical beam size (~20 µm) The beam size is about 0.2mm in vertical direction. The magnification of the imaging system is 2.2 for 365nm light. A selected camera with specifications as blow: ·Number of effective TV Lines Pixels 736 (H) x 568 (V) ·Pixel size 11 µm (H) x 11 µm (V) ·Optical size 1/2 type So, the image size is 0.2mm x 2.2=440µm. Corresponding number of pixels is 440µm / 11µm = 40. Resolution is 200µm / 40 = 5µm So, if the beam orbit is stable, then the system resolution will be good than 10% of vertical beam size. 2018/9/22 4th-IMAC meeting

DCCT The new DCCT had been tested in BEPC. According to the experiment results, we modified the structure of ceramic pipe. In the machining process of ceramic pipe, the vendor met some difficulties on the Kovar welding. Finally, they solved this issue. New DCCT tested with beam 2018/9/22 4th-IMAC meeting

DCCT New DCCT tested with beam 2018/9/22 4th-IMAC meeting

Consideration to noise rejection DCCT Consideration to noise rejection   The noise caused by EMI and RFI can be demodulated in the readout instrument due to it’s high-impedance input. These interference's can be significantly reduces or eliminated by the use of common-mode filters. Simple common-mode filters can be made by passing the signal cable through a ferrite core. The magnetic characteristics of the ferrite cores must correspond to the frequency spectrum of the noise to be rejected. To reject differential mode noise, install a ceramic capacitor between signal wire and ground at the input of the readout instrument. Moreover, we hope the BEPCII new grounding system can make effects to reduce the noise in further. 2018/9/22 4th-IMAC meeting

DCCT The Labview-Based DAQ system for DCCT is developed. This is the DAQ structure. 2018/9/22 4th-IMAC meeting

DCCT The control system of BEPCII is based on EPICS, so the DAQ system as an EPICS IOC is developed by using the Channel Access VIs. CA-Server in LabVIEW CA-Client in LabVIEW LabVIEW Interface to EPICS IOC 2018/9/22 4th-IMAC meeting

DCCT An example of software development of CA server and CA client 2018/9/22 4th-IMAC meeting

Transverse Feedback System The prototype of TFB system was built and tested in BEPC. With the help of KEK expert, we were successful in the prototype experiments. This figures show the experiment results. TFB turn-off TFB turn-on The experiment results of TFB prototype 2018/9/22 4th-IMAC meeting

Signal from Kicker for monitoring Transverse Feedback System Single shot mode Pickup signal Beam orbit ContinualAcq. mode Experiment data Signal from Kicker for monitoring TFB turn-off TFB turn-on 2018/9/22 4th-IMAC meeting

Transverse Feedback System The machining of one unit of kicker has been finished. The electrical performances were checked in laboratory. 2018/9/22 4th-IMAC meeting

Tune value measurement According to the operation experience of BEPC and the requirements of BEPCII, the tune measurement system adopt both Fast Fourier Transform (FFT) method and swept-frequency method. 2018/9/22 4th-IMAC meeting

Tune value measurement For the swept-frequency method, the betatron tune is measured by exciting the beam externally in the horizontal and vertical planes simultaneously through a stripline, similarly, picked up by another BPM and sending to the spectrum analyzer . Tune system structure 2018/9/22 4th-IMAC meeting

Beam Loss Monitor After the electronics design was finished, we signed a contract with the vendor through a public bidding for the electronics manufacture. Now, the electronics prototype had been manufactured. The DAQ system has been developed as well. The BLM detectors were bought from Bergoz company. We tested the BLM prototype by using radiation source in laboratory and residual activated dose in linac tunnel, respectively. 2018/9/22 4th-IMAC meeting

Beam Loss Monitor The electronics prototype DAQ sample 2018/9/22 4th-IMAC meeting

Summary System AP Requirements Test results BPM SRM COD accuracy:0.1mm Resolution:<0.01mm   BBA will be adopted <0.01mm (I > 5.5mA) Tune Resolution:0.0001(0.1kHz)  0.03kHz SWF mode DCCT Dynamic range:0.0~1.5A Linearity:0.1 % 0.0~20.0A   < 0.05% in lab. BCM Relatively precision:1/256 Bunch spacing:2ns  8 bits AD & 256 cycles averaged SRM Beam size Resolution:(10%)sy   < (10%)sy simulation Bunch length Resolution:2 ps   using streak camera 2018/9/22 4th-IMAC meeting

Summary In general, the progress of the beam instrumentation system, especially hardware could keep the synchronous with the BEPCII CPM plan. Firstly, the mechanical machining of most devices had been finished. Secondly, most prototypes were tested with beam. According to suggestion of IMAC experts, 5 Profile monitors for positron ring commissioning had been designed and the manufacture will be finished next month. Next step, our work will focus on the software development. The software interfaces between diagnostic system, control system and physics group has been determined. 2018/9/22 4th-IMAC meeting

Thanks! Thank you for your attention! 2018/9/22 4th-IMAC meeting