The CosMic Telescope Construction of a self-triggering prototype telescope at GHz funded at the Università del Salento (Lecce) – 2 years project (end 2013)‏

Slides:



Advertisements
Similar presentations
How to trigger to test MDT with cosmic rays? authors.
Advertisements

Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
S. Veneziano, Lecce 21 February 2002 RPC readout and trigger electronics status Lecce 21/02/2002.
Status of the project E xtreme E nergy E vents area of Bari Prof. F. Romano - Politecnico di Bari & INFN Bari Dott. M. Abbrescia – Ricercatore Università.
Group Meeting 03/02/2004. Format of Weekly Group Meeting  Daily chore  Research report: electronic presentation required  Journal report.
Proposal for a barrel prototype H. Álvarez-Pol, J. Benlliure, E. Casarejos, D. Cortina, I. Durán, M. Gascón Status of the USC 15 th October 2007.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” LC-TPC-LBL 18-Oct Tracking Detector R&D at Cornell University and.
Final Remarks. Workshop program Remarks Large synergies with other neutron detectors: MONSTER, DESCANT Continuous feed back from gamma spectroscopy arrays:
D. Peterson, Cornell University, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG Arlington 09-Jan-2003 Tracking Detector R&D.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.
Proposal for a barrel prototype H. Álvarez-Pol, J. Benlliure, E. Casarejos, D. Cortina, I. Durán, M. Gascón Status of the USC 27 th September
ATA Antennas Feeds and Systems NSF Review 8/05/08 Jack Welch.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
GIF++ DAQ architecture 1. Requirements Support of SRS, VMM (UDP packets), VME Several groups can run at the same time Each group should be able to start,
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
AMY Meeting. 24 Mar 2011 status Auger Lecce Meeting,
May 4-5, 2006 T.Schweizer, CTA meeting Berlin Concept idea for a future telescope array observatory CTA meeting Berlin May 4-5, 2006 Thomas Schweizer.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
AMY Meeting. 25 Feb 2011 Status.. AMY Meeting. 25 Feb 2011 AMY- First tests in Lecce AstroParticle Lab Signal Generator R&S SMB100A 9kHz to.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
Measurement of the UHECR energy spectrum from hybrid data of the Pierre Auger Observatory Presenter: Lorenzo Perrone Università del Salento and INFN Lecce.
Performance of CRTNT for Sub-EeV Cosmoc Ray Measurement Zhen Cao IHEP, Beijing & Univ. of Utah, SLC Aspen, CO, 04/2005.
H.E.S.S. - MAGIC – CTA meeting Installation of Working Groups Physics & Science Goals MC Simulation & Layout Telescope structures & mirrors Camera designs.
March 6, INST02, Novosibirsk1 Electronics for the  e  experiment at PSI Short introduction Trigger electronics DAQ electronics Slow Control For the.
T2K Data Acquisition System Matt Thorpe STFC Rutherford Appleton Laboratory 17 th IEEE Real-Time Conference 2010, Lisbon, Portugal.
P.W. Gorham et al.. TEST BEAM A SLAC Time relative to beam entry Antenna V/V rms Time relative to beam entry Antenna V/V rms close to shower maximumshower.
AMY Meeting. 21 Mar 2011 what is new? Auger Lecce Meeting,
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
Measurement of the UHECR energy spectrum from hybrid data of the Pierre Auger Observatory Presenter: Lorenzo Perrone Università del Salento and INFN Lecce.
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting June 5, 2001.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
1 Carleton/Montreal Electronics development J.-P Martin (Montreal) Shengli Liu & M. Dixit (Carleton) LC TPC Meeting DESY Hamburg, 4 June 2007.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
The Mu2e experiment at Fermilab Finding a needle in a trillion haystacks Bertrand Echenard California Institute of Technology APS Meeting – April 2013.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
Progress of GEM R&D in Lanzhou Univerity
Meeting at Erice Great success!
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Atlas: Upgrade Phase I Massimo Della Pietra.
CLAS12 Commissioning with Cosmincs
New 500 MSa/s 12 bit FADC in VME Sangyeol Kim Notice Co., Ltd.
An FP5 RTD programme Participants: University of Manchester: UK
FF-LYNX (*): Fast and Flexible Electrical Links for Data Acquisition and Distribution of timing, trigger and control signals in future High Energy Physics.
Tassielli G.F. INFN Lecce & Università del Salento
10/month is the present production rate 2 FTE + sporadic contributions
IDEA Detector Simulation Status
Update on Cluster Counting Technique
Activity on the TO ASIC project
30th International Cosmic Ray Conference
0755 Azimuthal modulation of cosmic ray flux
تعريف التواصــل يرجع أصل كلمة التواصل Communicationإلي الكلمة اللاتينية communes ومعناها common أي " مشترك " أو "عام" وبالتالي فإن الاتصال كعملية.
PARTICLE Classroom Cosmic Ray Physics
during Fall GMp run (high current)
Status of the Detector Dependent Unit 2 channel prototype
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.

Testbeam status report
Possible parasitic measurement during Fall GMp run
CTA Why ?.
Readout electronics system for Laser TPC prototype
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

The CosMic Telescope Construction of a self-triggering prototype telescope at GHz funded at the Università del Salento (Lecce) – 2 years project (end 2013)‏ Small budget, commercial components Design under study, MIDAS inspired. 4 m dish camera with 24(32) channels feed C-band‏ 15° x 15° field of view Power detectors based on MXMMAX2015EUA (to be developed at the INFN Lecce electronics lab) DAQ: FADC (250 MS/s, 12 bit), VME Location: Roof of the Physics Department in Lecce (Possibly a didactic outcome)