KENNESAW MOUNTAIN TRAIL CLUB WORKDAY 1/13/18 DRAFT

Slides:



Advertisements
Similar presentations
The people Look for some people. Write it down. By the water
Advertisements

Blade: Used for cutting the tree Loppers. Handle: Used for opening the loppers so you can put them around the tree you want to cut Loppers.
Work Weekend Projects Projects that need to be done around Lyrecrest.
Chapter 9 Water Erosion and Deposition
Village of Alden Stormwater Pictorial view. Here is a view of rainfall and notice how the water carry’s away from the center of the road to the sides.
Roads in MineSight.
Mr. Bowman’s Classroom Procedure Manual Student signature:
“Man’s heart away from Nature becomes hard.” -Standing Bear.
CONTENTS: What is contour, and why is it important? How can I use it to help my farm designs? What tools can I use to find it? Contours and maps CONTOURS.
Guided Notes for Mass Movements
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
Humans Impacts on Land Objective 2.07
Fire and Fire Safety Fires can be very useful in the outdoors if they are used right. Fires can be very useful in the outdoors if they are used right.
By Catherine Fontenot LTEC /29/ Preparations for your tree Preparations for your tree The tools you will need for the job The tools you.
Erosion and Deposition
Come on! Let’s take a field trip to the Timberline High School Pool.
How we do things in our classroom…
To make employees aware of potential hazards and methods for operating small-engine equipment safely.
This document is contained within the Traditional Tools and Skills Toolbox on Wilderness.net. Since other related resources found in this toolbox may be.
I am ready to test!________ I am ready to test!________
Sight Words.
Unit 3 – Use of Tools and Equipment. Objectives Demonstrate checking hand tools for serviceability, and how to perform basic maintenance As a member of.
School Bus Safety Policy for Podar Jumbo Kids BUS STUDENT TRAINING.
Safety Rules for 9 th Grade Shop Radial Arm Saw: Safety Rules Never cut a board that is less than 12 inches long. Always pull the saw using the handle;
Erosion and Deposition Pages D58-D64. Mass Wasting.
By Jamal Giornazi Lair of the Bear R11.htm Web sites Google.com 69/530wm/C
This house sits on the top of a hill that is covered with loose soil and rocks. The new owners of this house have some concerns about their property. What.
Tools and Procedures. HAND TOOLS Weeder Description: Metal shaft with handle that forks Use: Removes weeds Operation: Jab into ground, pry up weed Safety:
In this section, you will look at model performers in the following skills/techniques: Control Straight Dribble Indian Dribble Push Pass Slap Hit Reverse.
Sight Words.
Science Station Properties of Soil. Welcome Hello students!! Welcome to today’s lesson. We will discuss: the properties of soil, including texture and.
Do Now: - In your review books, answer questions # 1-4 on page 213. We will go over the answers in 5 minutes. Answers: Hand in your Chemical.
Packing Equipment.
High Frequency Words.
CLASSROOM PROCEDURES Mrs. Conn, Entering Class BE ON TIME, OR HAVE A PASS! (if you are not in your seat when class begins, YOU ARE TARDY!)
 Step 1: Digging the Hole  First dig yourself a good hole. I had a look at pond liners that were available first and knew that I could get one that.
View of well and location from the northern slope. According to a company representative, the location size has not been reduced because the well still.
When you pull the drain plug, wash clothes, or flush the toilet the magic of wastewater begins......
Chain Saw Safety 10-4 training 10 Slides, 4 minutes Lehigh/Hanson Region West Safety and Health.
Human Impacts Part 2- Watersheds. What’s a Watershed? An area of land that drains into a common body of water.
Created By Sherri Desseau Click to begin TACOMA SCREENING INSTRUMENT FIRST GRADE.
Welcome to Eagle’s Outlook Garden! Did you know SEES has lemon trees, tomatoes, and a butterfly garden? Eagle’s Outlook is our school garden behind the.
Fry Phrase List 3.
Landforms.
Rip vs. Cross-Cut Rip – cuts along the wood grain
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
ROAD HAZARD ASSESSMENT
AIM: Erosional and Depositional systems
Well Dressing.
Chapter 3: The Driving Task
Back Safety & Safe Lifting
Classroom Procedures for Mrs. Martin Room 302.
KENNESAW MOUNTAIN TRAIL CLUB WORKDAY DRAFT
WET FLOOR SAFETY Use Your PPE POST caution signs
Garden Installation Rebecca Wolf and Nguyen Le
Chapter 9 Water Erosion and Deposition
Reading and Interpreting Topographic Maps
Ms. Shockey’s Room Room 609 AE
Fry Word Test First 300 words in 25 word groups
Roots and Planting Trees
Hornaday Weekend Conservation Project
Chapter 3: The Driving Task
Double digging Double digging is a type of tillage, done by hand.
Second Grade Sight Words
Reading and Interpreting Topographic Maps
The of and to in is you that it he for was.
START.
Road Plans and Soil Retention 2019
Playground Rules and Expectations
Presentation transcript:

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY 1/13/18 DRAFT Trail ambassadors or others –see next page. 1 1 –work sites SCHEDULE: 7:00 Blow leaves off specific work sites? 7:15 Start load tools; Send registration stuff out 8:00 Send tools to grassy area near trail head. 8:15 Brief crew leaders 8:30 Greet & organize volunteers 8:40 Crew leaders hand out tools to each crew. Close Mtn. trail (need cones); Turn to. 12:00 Pack up and head out; Reopen trail 12:30 clean and stow tools 1:00 Head for President’s debriefing meeting 1 16 TOOLS 15 1 2 1C 3 2 Work for 1-13-18 will again be on the lower portion of the Mountain Trail below the fire road. Big, big job. Due to safety considerations, Mountain Trail hikers will be rerouted to the smoother Picket Line Trail so that we can close the Mountain Trail in the work areas. Parking will be at the Old 41 Lot-volunteers can assemble at the amphitheater. Don’t start what you can’t finish. If done early, help another crew trash the eroded areas. Make it fun, and above all –BE SAFE! WATCH THE WEATHER this month In case of emergency, call 911, then the Park, and send volunteers to meet help.

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY 1-13-18 draft Trail Ambassadors (or others) to politely 1) guide “up” hikers off Mountain Trail to Picket Line trail; 2) Guide “up” hikers back onto fire road/Mountain Trail to the top, and ‘”down” hikers back to Picket Line Trail to V. Center; 3) guide “down” hikers down to Picket Line Trail (2) & keep them off of Mountain Trail going down. Safety first. Trail Ambassadors: Registration at Old 41 (Many clipboards in tool shed). Snacks. Hiker reroute- see above. Material: Use all in-situ material. Equipment: 1 2-seat Gator. 2 ditch witches. Pick up truck to haul tools to grassy area near trail head. Have volunteers return them to maintenance area. Get keys from Park, check fuel, fill fuel log if added, clean equipment, return keys. Other: Registration desk, chairs, and registration signs to Old 41 parking area. About 7 cones to close trail. Trail club work signs. Water Danny will have a crew at the Visitor’s Center doing planting, etc. – see work site 1.

KENNESAW MOUNTAIN TRAIL CLUB Work Sites 1 (Visitor Center) and 1A (Kolb’s Farm) and 1C –clean fire road ditch 1 PER DANNY I plan on taking a 4-6 person group and working around the VC on 12/9. There are several new bushes that the park has purchased to put in right at the VC and we are going to add plants between the road and the picnic area. Now that the annual and perennial plants are done for the summer I also plan on sprucing up the area around the VC by cutting back the dead material on the summer plants. There are also several oak logs that need to be removed if a gator can be spared for part of the day. The picnic grills need to be cleaned out and 3 of them need to be replaced. Chip is supposed to get back with me on whether the posts need to be replaced as well or just the grills. There are replacement grills at the maintenance area. We could use the gator to move the old and new grills around.  If there is time I there is privet growing near the middle bridge going from the picnic area to the parking lot and bush honeysuckle further down the creek closer to the road. 1B Cam will be working with a group from Kennesaw Mountain HS again near the Kolb farm house destroying privet.  1C If we have too many volunteers or a young group, the ditch on the fire road is ready for its annual cleanout –remove silt, remove leaves, try again to channel spring near the turn into the ditch

KENNESAW MOUNTAIN TRAIL CLUB Work Site 2 KENNESAW MOUNTAIN TRAIL CLUB 3 1 2 This whole section looks incredibly good after last month’s work. However, we watched many hikers go through here, and almost all avoided the step on the left in the photo. In one group some people even walked around to the left which will just start the erosion again. The step looks too high as you hike up the mountain. 1 )We need to dig a flat rock into the ground below the step here to raise the grade, and also 2) one below the new step just below to make it look easy rather than high, and backfill with dirt to make it look smooth. Also, 3) we need to put some logs or something on the left of the photo on the rocks so that hikers won’t try to walk around. (sorry I don’t have a better picture.) Enlarge drainage above step with a wider trench. Suggested crew and tools - 2-3 people -1 Pulaski, 1 bucket, rock net. Need two flat rocks - Bruce has a good one.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 3 Widen nick and deberm where Bruce is standing. Minimum crew: 4-5. Suggested tools – 1 pick-mattocks, 2 Pulaski's, McLeod, 2 spade shovels, 2 buckets, 1 garden rake.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 4 KENNESAW MOUNTAIN TRAIL CLUB Deberm Widen nick Widen nick above Bruce’s feet to get water off the trail. Deberm above removing logs above to let water of trail, but leave one of the big logs there to stop hikers from causing more trail creep. Minimum crew 4-5, Tools -1 picks or pick mattocks, 2 Pulaski's, 2 McLeod, 2 shovels, 2 buckets, 1 garden or fire rake.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 5 Fill Trail is over here Build a short crib in line with tree above and below tree using rocks across trail and others that have rolled off the trail. Use material in creep section across trail to fill behind crib. Close and seriously trash creep section. Remove roots above grade and rocks to eliminate trip hazard and add fill to make trail more attractive to hikers. Take care to make water flow sideways off trail as much as possible. Crew 8-10. Suggested tools -2 picks or pick mattock, 3 Pulaski's, 3 McLeod, 3 shovels, 3 buckets, 2 garden or fire rakes, 1 wheelbarrow.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 6 Fill Deberm and place big log (or logs) where creep is occurring and wedge in place. Use deberm material to backfill behind rocks near step and compact as well as you can using the tamper. Remove trip roots near bench. Minimum crew 4-5. Suggested tools -2 Pulaski's, 2 McLeod, 3 shovels, 2 buckets, 1 tamper, 1 wheelbarrow.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 7 This area looks so much better after last workday, a better picture is needed. Cut trip roots in trail. Backfill around large roots to make a tread –may bury rocks to make a rock dam and fill behind. There is backfill available in berm under trash left of tree. . Remove odd rocks, add small step and/or rock dam and backfill to allow hikers to walk single file through he two trees. Use a well graded soil removed above and add organic soil to make tread to resist erosion. Minimum crew 3-4. Suggested tools -2 Pulaski's, 1 McLeod, 1 shovels, 1 buckets. Future fence here to keep hikers on trail.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 8 We watched about 35 to 40 people hike through here on Thanksgiving Friday – at least 10 or 12 walked to the left of the big rock! (Look at how smooth the real trail is.) Anchor big rock (with wedged rocks) so that only a major earthquake could ever move it again. I would pile ugly rocks behind it so that people won’t walk there anymore. Ugly rocks are piled just below picture to the left Lots more trashing behind rock. Ugly rocks here for trashing The trail is very smooth but slopes straight down the trail. There’s a lot of dirt where the old creep area was. We could use it to make the trail out slope and build a nick above and below to get water off the trail. Side hill a little at tree to make trail look wider and more appealing. Minimum crew 7-9. Suggested Tools -3 Pulaski's, 4 McLeod, 4 shovels, 2 buckets, 1 tamper, 1 wheelbarrow, 2 buckets.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 9 KENNESAW MOUNTAIN TRAIL CLUB

KENNESAW MOUNTAIN TRAIL CLUB Work Site 9 BIG JOB! Deberm and trash Future fence here to keep hikers on the trail. Remove new creep trail on left eroding down hill. Build short crib wall above and below tree using rocks in trail and rocks that have rolled off trail down the hill. Use dirt in creep area as fill where needed. Remove trip roots and move rocks to eliminate trip hazard and make trail more attractive. You can bury rocks to make a rock dam and backfill to smooth trail below roots. Side hill a little to make trail look wider. Fill in area between trees to give hikers a place to walk that won’t erode. Seriously trash the area to the left (downhill) of the new crib with nearby logs, branches, leaves. Minimum crew 10-12. Suggested Tools -1 pick, 4 Pulaski's, 4 McLeod, 4 shovels, 2 buckets, 1 wheelbarrow.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 10 Trash Cut dead roots, fill Deberm Trash Trash left of little stump. Cut roots and move any rocks that are trip hazards to make trail more attractive. Deberm and trash creep area using material as fill near tree. Suggested crew 3-4. Suggested tools -2 Pulaski's, 1 axe, 1 shovel, 2 buckets, 2 McLeod, 1 garden or fire rake. Possible future fence area all along here.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 10 TRASH Clean up trip roots and rocks by the tree to make that side of trail more attractive. Remove line of rocks as needed- the trail is on the right. Trash the bid creep section. Rocks can be used elsewhere. Crew 8-10. Suggested Tools -1 pick, 3 Pulaski's, 4 McLeod, 2 shovels, 2 buckets, 2 garden or fire rakes.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 11 Side hill a little Trash Build a short crib wall and backfill but allow for water to sheet off. Side hill a little near tree. Cut trip root. Backfill around big root near tree. If you can find a good rock or two, bury rock partway in front of root to make a rock dam and backfill behind it so the step over the root isn’t so high. Trash left of tree. Suggested crew: 3-4; tools: 2 Pulaski's, 1 McLeod, 1 garden or fire rake, 2 buckets.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 12 KENNESAW MOUNTAIN TRAIL CLUB Trash left of big stump above and below –use stump as part of the trash. Cut roots sticking out to the right of stump and move loose rocks. Deberm by moving old log just above stump. CUT Suggested crew; 2-3. Suggested Tools -1 sharp Pulaski or axe –remember the circle of death and have a spotter, 1 McLeod. TRASH

KENNESAW MOUNTAIN TRAIL CLUB Work Site 13 KENNESAW MOUNTAIN TRAIL CLUB This part of the trail is unique- we do not want water or silt to sheet off to the left. Note the rifle pits between here and the Pickett Line trail. We intentionally built berms and reverse sloped the trail to run water down the trail until it passed by the rifle pits then across and off the trail to protect the rifle pits. However, feet have compressed the soil in the middle of the trail and will start to rut. Therefore, we want to use the what Geoff calls the “New Zealand“ method* to reverse slope the trail to the right and cut a low area next to the right edge of the trail. The dirt can be used just downhill. Cut Crew size 4-5. Suggested Tools: 2 picks, 2 Pulaski's, 2 McLeods, 2 garden rakes/fire rakes *I haven’t seen this method in any trail building manual, although Geoff has hiked in New Zealand and always knows what he’s talking about, maybe he’s pulling our legs this time.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 14 We watched one hiker through this part of the trail –she walked downhill around to the left of the tree. No one else was around. Dig to slope Add a couple of rocks here. BE CAREFUL HERE NOT TO ALLOW RUNOFF TO GO TOWARD THE RIFLE PITS NEAR THE PICKETT LINE TRAIL Trash left of tree to block off creep section. Move rocks to make trail look attractive to hikers. Possible future fence in this area. Crew 8-10. Suggested Tools -1 pick, 3 Pulaski's, 4 McLeod, 2 shovels, 2 buckets, 2 garden or fire rakes.

KENNESAW MOUNTAIN TRAIL CLUB Work Site 15 Work at site 15 just above should divert the water that made the rut here. Clean out rut. Dig in rocks into the rut every 8 to 10 feet to make rock dams, backfill, and compact. Trash left of tree. Deberm near tree and build up trail and slope 3 to 5 degrees to the right. Get some fill from the work group up the trail. Crew size-5-7. Suggested tools : 1 pick or mattock, 1 Pulaski, 2 McLeod, 2 garden rakes or fire rakes, 2 buckets.

Work Site 16 KENNESAW MOUNTAIN TRAIL CLUB No photo yet. This future project will be to build drainage just above the trail head into the ditch below and a foot trail to get people around the gate when it is closed. The dirt pile near the trail is for that purpose –don’t use it elsewhere please. If your crew has time, the ditch to the uphill side of the trail that drains into the culvert under the trail need cleaning out. Have at it.