Work Order System Infor 10 (EAM) JCIM

Slides:



Advertisements
Similar presentations
Welcome to the Online Employment Applicant Tutorial Click here for next screen.
Advertisements

Work Orders Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
Live Text C1 Basics Create a Project Submit the Project for Review Check the Status of Review Read Instructor Comments.
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
HOW TO USE THE SYSTEM Specialty Crop Block Grant Program Online System.
TFACTS Private Provider Financial/Invoicing Overview 1.
Virtual Library Workshop. To access the Virtual Library you must be signed into Campus Connect. Once you are signed in: 1. Click on the Library tab at.
Quick Reference Guide Work Order System Infor 10 (EAM) URL for the System: A- INFOR Quick Reference Guide, ( )
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Letterhead Templates, Print Letters/Send s and Workflow Triggers Presented.
S9k Preventive Maintenance & Equipment Inventory.
Create Mailing Labels (Word 2007) Word 2007 using the Mail Merge function and an Excel spreadsheet Create mailing labels from Member Rosters in.
Copyright CovalentWorks Training Guide for Invoices MYB2B Powered by CovalentWorks.
MPA Online Entering Solos, Ensembles, and Bands. The first step is to log into MPA Online at: You will need.
1 Office 2007 & AppleOne Timecard Training March 19, 2009.
HP Project & Portfolio Management Entering Actual Hours for Project work July 11, 2007 CIMpleBS.com/HP-PPM/Training-Time Sheets.pps By Dan Gallagher See.
SOML Large Optics Daily Reporting Guide to using the new ETSEDMS server for Large Optics Daily Reporting.
Compliance Assist Refresher Instruction Guide Adding or Editing Student Learning Outcomes.
Editing Basics Lesson 8. Skills Matrix SKILL #MATRIX SKILL 2.2.1Cut, copy, and paste text 2.2.2Find and replace text 4.1.1Insert building blocks in documents.
To increase performance and to add future capabilities to ESC, the following screens have been converted to.NET: Customer Information Qualifications Screen.
Training Guide Copy/Print. Log into Inside Augsburg.
A user guide to accessing, reviewing and contributing to the Online Registry System.
SMART Agency Tipsheet Facility List This document focuses on setting up facilities within an agency. Total Pages: 7 Facility Profile Contacts Operating.
Complete Ordering System for Promotional Literature and Samples Quick Reference and Training Guide.
Start the slide show by clicking on the "Slide Show" option in the below menu or – hit the F5 Key.
ELISTING How to use eListing to conveniently and quickly file your personal property listing online. DEPARTMENT OF ASSESSMENTS King County To navigate.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Emdeon Office Batch Management Services This document provides detailed information on Batch Import Services and other Batch features.
Customer Report Manual
A step-by-Step Guide For labels or merges
Submitting an invoice with the Tungsten Portal
FEPMIS Acquisition Plan
Standard Operating Procedure
Microsoft Outlook By: Phuong Nguyen.
How to get the most of Outlook
SUBMITTING A PAYMENT REQUEST FORM
Standard Operating Procedure
ePAR - Secondary Assignment
(Global / All Markets View)
Mount Aloysius College
EPAR Training Module Transfer 11/9/2018 ePAR - Transfer.
Marking a Piece of Equipment for Transfer/Scrap/Withdrawal
Work Order System Procedure Creating Tool & Meter Release
I-Supplier Training Guide
Overview & Basic Functionality
Generating, Printing & Reprinting Work Orders
Generating & Printing Work Orders
How To UPLOAD Policies.
ePAR - Job Attribute Change
Proper Format for PM Task Add Request
Working with Headers and Footers
Managing Rosters Screener Training Module Module 5
Work Order System Infor 10 (EAM) JCIM
Word offers a number of features to help you streamline the formatting of documents. In this chapter, you will learn how to use predesigned building blocks.
Work Order System Infor 10 (EAM) JCIM
Type your event details here
Type your event details here
References & Recommendations
TEAMWORKS TRAINING 101.
Quick reference: entering a requisition In escape RECEIVING AN ITEM
Review, Updating, & Closing Work Orders
Spare Parts - PRONTO Invoicing for P-Jobs (Prosquid / Pronto)
Approving Time in Kronos Manager/Supervisor Reference Guide
Work Order System Infor 10 (EAM) JCIM
Attach Certification Document to WO
Work Order System Infor 10 (EAM) Yanfeng
CSI Human Resource (HR) Data Collection Prep
Position Control Fiscal Year End
References & Recommendations
Type your event details here
Presentation transcript:

Work Order System Infor 10 (EAM) JCIM 12-04-14 Creating PM Schedules Work Order System Infor 10 (EAM) JCIM 12-04-14 C- Creating PM Schedule, (12-04-14)

HINTS CREATING PM SCHEDULES FOR EQUIPMENT TO CREATE A PM SCHEDULE FOR A PIECE OF EQUIPMENT YOU NEED to Pre-Determine 4 ITEMS Step A. Write Down Equip. Number(s) . (Hint use excel extract on Equip. List screen) Menu: Equipment>Equipment List Step B. Determine PM Task (Job Instruction) Menu: Work Orders>Work Order Planning>Tasks (Job Instructions) Step C. Decide on Frequency of PM for the field “Perform-Every-(Recommend-Use-Weeks)” Recommend: Frequency should be Daily or Weekly Increments (avoid mth, year (D-Daily, W-Weekly, 4WK-Monthly, 13WK-Quarterly, 52WK-Annual, C-Periodic Based on Meter) Step D. Determine 1st PM Start Date, Recommend: Always use a Monday for the field “Next-PM/Calib.-Start-Date” Recommendation: If you have LIKE equipment that will use the SAME PM TASK, put them all on one PM Schedule, the frequency can vary for each piece of equipment attached to the PM Schedule ONCE YOU HAVE DOCUMENTED STEPS A THROUGH D ABOVE; Menu: Work Orders> Work Order Planning>PM Schedules Tab>Step 1 - Record View PM Schedule Code: Create the SCHEDULE Code & Description field “PM-Schedule-Code & Description (Start-with-Plant-Code Followed by the PM Task Code You Will Attach)” (Example: 200-00-CV09-6WK) Tab>Step 2 - Add Task(s) Job Instruction: Add the Task Code to the Schedule Tab> Step 3- Add Equip. No.: Add “Equip.-No.” or numbers to the PM Schedule, Modify Frequency & Next PM Date on each Equip. as Required On-Going: Add or Remove Equip. from the Schedule IF YOU WANT A ROUTE BASED PM PLEASE GO TO THE FULL TRAINING Tab> Step 4 - Optional Add Documents : Add Document Code to the PM Schedule C- Creating PM Schedule, (12-04-14)

CREATING PM SCHEDULES FOR EQUIPMENT When naming your PM Schedule make sure to follow the PM Code Convention Start with your Plant Code Followed by the Task Code Chosen Followed by The Frequency in Weeks Example 1: Plant 36, using Task Code 00-AGC01-2WK, frequency every 4 Weeks PM Schedule Code: 36-00-AGC01-4WK Description: Every 4 Week PM: Automatic Guided Cart (IDC Model E-500) Plant 200, using Task 00-CV09, frequency every 6 weeks PM Schedule Code: 200-00-CV09-6WK Description: Every 6 Week PM: Overhead Conveyor & Carriers (GM-31XX, E2SC) Example 2: C- Creating PM Schedule, (12-04-14)

1. Navigate to the Equipment List Screen FIND THE EQUIP. OR EQUIP. NUMBERS IN THE EQUIP. SCREEN Make sure you know the Equip. Number (HINT EXTRACT TO EXCEL) C- Creating PM Schedule, (12-04-14)

2. Navigate to the Task Screen Make sure you know the TASK Number that matches your PM Needs All Tasks Include their Equip.-Type, for easier filtering. WRITE DOWN YOUR TASK NUMBER C- Creating PM Schedule, (12-04-14)

2. Navigate to the Task Screen Read the Instruction to Make Sure It Applies, Note: PLANTS SHARE TASKS C- Creating PM Schedule, (12-04-14)

NEED A TASK ADDED OR EDITED BASED ON PLANT EXPERIENCE/LEARNING JCIM: Contact AME, Joe Buffa, SEATING: Add Your OWN IN INFOR, Highlight the text, copy & paste (Ctrl C & Ctrl V on Keyboard) into an Work Request to Plant 90 with edits made It Goes on Work Log for AME to Complete, You will get emailed back if questions or when it is entered and ready to use. (do not send parts, send entire entry) That Way If Agreed it is a quick Cut & Paste FILL out a Work Request in INFOR to Plant 90, include the Following in the Comments of the Work Request to Plant 90. Text is formatted as Proper Case , (1st Letter Capitalized) No Periods at ends of lines, action to take if something is found comes after a “;” Heading Defines the PM Task & Frequency The equipment number & equipment description that will use this TASK is to be sent all Check Boxes are as shown Standard Header & Footer, ALL PMS get these **If not sent to this way, it takes emails back and forth to interpret, and longer to format for load. See example on next slide.** C- Creating PM Schedule, (12-04-14)

Example C- Creating PM Schedule, (12-04-14)

Elements of The Job Instruction C- Creating PM Schedule, (12-04-14)

3. Create A PM Schedule: HINT: COPY AN EXISTING & EDIT C- Creating PM Schedule, (12-04-14)

3. Create A PM Schedule: HINT: COPY AN EXISTING & EDIT Double Click on the Record You Wish To Copy, or Select for Adding All New C- Creating PM Schedule, (12-04-14)

4. Add the Task to the Schedule using the TASK TAB C- Creating PM Schedule, (12-04-14)

5. Add the Equipment to the Schedule using the EQUIPMENT TAB C- Creating PM Schedule, (12-04-14)

Special Note: Changing PM Schedule Frequency Note: Changing Frequency “Perform-Every-(Recommend-Use-Weeks)” on the PM Schedule mass updates the frequency on all of the equipment on the Equip. Tab as well. C- Creating PM Schedule, (12-04-14)

Special Note: Changing PM Schedule Frequency & Next PM Start Date from Equipment List C- Creating PM Schedule, (12-04-14)

6. Once you have all the equipment attached and activities attached to a PM Schedule, you are ready to GENERATE & PRINT Work Orders. See the other procedures for a quick reference on how to do that. PM SCHEDULES USING CHECK SHEET/PICTURE C- Creating PM Schedule, (12-04-14)

Optional- 7. Attach Document to PM Schedule Step 1- Determine if there is an existing document that fits your needs (write down the Document name or Copy it – Ctrl C). Step 2- If you found one that matched your needs, you can go to the Documents Tab of the PM Schedule screen and click on “Add Document.” Step 3- Type in the Document Name, or hit Ctrl V if you copied it, and select the Document. Step 4- Then check off the copy/print options that you want to apply. Step 5- Hit save. If you did not find a Document that fits your needs or you want an existing Document modified, you will need to submit a Work Request to Plant 90. Send an email to joseph.buffa@jci.com with the attached document (make sure if it is a modified document that you highlight the proposed changes). In the comments section state that you have sent an email with the attached document. Also, provide your rationale for needing the modified document or a new document to be added to the system. C- Creating PM Schedule, (12-04-14)

Optional- 7. Attach Document to PM Schedule If you found a Document that works: C- Creating PM Schedule, (12-04-14)

Optional- 7. Attach Document to PM Schedule If you did not find a Document that fits your needs or you want an existing Document modified: C- Creating PM Schedule, (12-04-14)