Council Rock High School South

Slides:



Advertisements
Similar presentations
New N. Atlanta High School 4111 Northside Parkway Project Overview March 25, 2010 Facilities Services Department September 20, 2011.
Advertisements

Update on FCPS Construction/Renovation Projects August 2009.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Thesis Presentation April 13, 2004 Brian Regan The Virginia Historical Society Building Lighting/Electrical.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Council Rock High School South Brad Kirkham Structures Council Rock High School South Northampton Township Council Rock High School South Brad Kirkham.
Wilkes-Barre/Scranton International Airport Avoca, PA Adam G. Weis Construction Management Option 2006 Senior Thesis Presentation.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Houston Independent School District James A. Berry Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS Berry Elementary is an environmental sciences magnet.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Thesis Presentation April 13, 2004
North Pocono High School
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
Maryland Transportation Authority Police Training Facility Schematic Design Presentation December 13, 2007 Leah Clark.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Student Health Center Jacob Brambley - AE (structural option)
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
T HE D UNCAN C ENTER D OVER, D ELAWARE R ACHEL G INGERICH, S TRUCTURAL O PTION S ENIOR T HESIS P RESENTATION A PRIL 15, 2008.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Washington-Lee High School Arlington, Virginia Matthew Hoerr The Pennsylvania State University Construction Management.
Andrew Diehl, EIT The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project.
Villanova University: School of Law Jason Greer The Pennsylvania State University Architectural Engineering Lighting/Electrical Option Senior Thesis –
Fun Facts: James M. Bennett High School
Pearl Condominiums Philadelphia, PA
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
David Anderson Mechanical Option
Advisor: Professor M. Kevin Parfitt
Redifer Commons Addition & Renovation Project
Wrangle Hill Elementary School New Castle, DE
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
INDOOR BASEBALL / SOFTBALL FACILITY
Daniel Suter Unknown Data Center Somewhere, USA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
The Bond Street Wharf Baltimore, Maryland
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Lehigh Valley Heritage Center
Wellington Condominiums Project
Located at Tufts University in Boston, Massachusitts
Project: 250 West Street, Columbus, Ohio
Tri-Valley Jr./Sr. High School Hegins, PA
RiverView Condominiums II Chicago, IL
Presentation transcript:

Council Rock High School South Construction Information Construction Started – September 2000 Scheduled Completion – December 2002 Total Cost: $74 million Project Team Owner: Council Rock School District Construction Manager: Bovis Lend Lease General Contractor: Bilt-Rite Contractors Architect: Gilbert Architects Structural Engineer: Baker, Ingram & Associates Mechanical/Electrical Engineer: Moore Engineering Company Lighting/Electrical Fluorescent lamps in classrooms High Intensity Discharge Fixtures in certain areas Low voltage switching system Each classroom wired with RJ-45 network cabling Architecture 360, 000 SF Total Area Two stories of classrooms Exterior walls are a colored brick façade Large Auditorium and Gymnasium Areas 500 seat cafeteria Site Development Full outdoor Tennis and Basketball Facilities ¼ mile Track Football, softball and baseball fields throughout site Two road relocations Structural Concrete footing system Primarily a steel system Slab on Metal Deck Flooring Large Truss systems in Auditorium and Gym Mechanical Forced air system Two Boilers Air Conditioning throughout Rooftop Cooling Tower Seth A. Glinski AE Senior Thesis 2002-2003 Construction Management Option Council Rock High School South 2002 Rock Way Holland, PA 18966