ECE 477 Design Review Team 13  Spring 2007

Slides:



Advertisements
Similar presentations
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

Left to Right: Michael Kelton, Ethan Hall, Greg Wegman, Vashisht Lakhmani.
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation.
Autonomous Dual Navigation System Vehicle Dmitriy Bekker Sergei Kunsevich Computer Engineering Rochester Institute of Technology December 1, 2005 Advisor:
Twitch Plays ECE477 ECE 477 Design Review Team 1 − Spring 2015 Hannan Harlan Root Tornquist.
Design Review: RoboSiM Robotic Surveillance in Motion
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Solar Telematics System ECE 477 Design Review, Team 8, Spring 2012 Paste a photo of team members here, annotated with names of team members. Craig Lechlitner,
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Final Presentation Team 14  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 14  Spring 2006 Jason, Nathanael, David, David.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
ECE 477 Final Presentation Team 18  Spring 2013 Derek Pesyna, Tim Brown, Evan Foote, Doug Wile.
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
Team /02/28 1. Chun Ta Huang Xirong Ye 2 Libo Dong Zongyang Zhu.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
Software Narrative Autonomous Targeting Vehicle (ATV) Daniel Barrett Sebastian Hening Sandunmalee Abeyratne Anthony Myers.
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Final Presentation Team 01  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
<Add team picture or relevant project picture here>
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Design Review Team 8  Spring 2007
ECE 477 Design Review Team 21 - Spring 2013
ECE 477 Design Review Group 3  Fall 2005
ECE 477 Design Review Team 6 - Spring 2012
ECE 477 Senior Design Group 13  Spring 2007
ECE 477 Final Presentation Group 5  Spring 2005
ECE 477 Design Review Group 6  Fall 2005
Project Success Criteria
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE477 Senior Design Android Street Car PCB TCSP
ECE 477 Final Presentation Team 4  Fall 2011
AUTOCAR Team #13 Greg Futia Greg VonFange Phil Kasper Ani Bhende.
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 14  Spring 2012
Group 10 – Extensible Digital Logic Educational Tool
ECE 477 Final Presentation Team 10  Spring 2008
ECE 477 Design Review Team 5  Fall 2006
ECE 477 Final Presentation Team 1  Spring 2008
TCSP – Design Constraint Analysis
ECE 477 Design Review Team ??  Fall 2012
ECE 477 DESIGN REVIEW TEAM 14  SPRING 2010
ECE 477 Final Presentation Team 13  Spring 2011
ECE 477 Final Presentation Group 10  Spring 2005
Presentation transcript:

ECE 477 Design Review Team 13  Spring 2007 Greg Futia Greg VonFange Anirudha Bhende Phil Kasper Paste a photo of team members here, annotated with names of team members.

Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation PCB layout Software design/development status Project completion timeline Questions / discussion

Project Overview Waypoint Navigation Control System Automated Roadway Equivalent to visual systems User programmed GPS waypoints and route information Demonstrate Feasibility by building system for R/C car

Project-Specific Success Criteria An ability to determine position and heading of the vehicle enter and follow user programmable route control the steer angle and speed of the vehicle display heading and position information on a local lcd stop and resume motion of the vehicle, if an obstacle blocks its path

Block Diagram

Component Selection Rationale GPS Selection Selected Part: Garmin GPS 18 Accuracy WASS Capable OEM Solution Built in Antenna Refresh Rate 5 Hz Cost - $200 Competing Parts: SiRF III, U-Blox & Atmel, Magellan Engine

Component Selection Rationale Microcontroller Selected Part: PIC18F2410 Low Pin Count Built In Oscillator C Development Tools Availability of Development Tools in Laboratory Competing Parts: Freescale MC9S12UF32, TI MSP430F167

Component Selection Rationale Ultrasonic Sensor & Digital Compass Ping Ultrasonic Sensor Simple one 1 Interface Availability & Cost Hitachi Digital Compass Cost Minimal Accuracy Competing Parts: I2C Ultrasonic Sensor TBD

Packaging Design Considerations Mounting Protecting the PCB Connectivity for the Motor Controller, Steering Servo, and GPS Unit Port Holes for the Ultrasonic sensor Mounting of the GPS Receiver Opening for the LCD Size

PCB Enclosure CAD Model Packaging Design PCB Enclosure CAD Model

Autocar Schematic Page 1

Autocar Schematic Page 2

Software Design/Development Status Motor Control Signals Complete Center/Stopped Right/Forward Left/Reverse

Software Design/Development Status

Project Completion Timeline   2/25-3/3 3/4-3/10 3/11-3/24 3/25-3/31 4/1-4/7 4/8-4/14 4/15-4/21 4/22-4/28 4/29-4/30 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Motor Control (done) Ultrasonic Sensor (done) PCB Layout LCD module GPS module Compass module Route Navigation User Programability User Manual Final Report Poster

Questions / Discussion