Step-by-step assembly instructions

Slides:



Advertisements
Similar presentations
Step-by-step assembly instructions
Advertisements

Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Click on this image to open the full PDF document.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Step-by-step assembly instructions
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Pneumatic Arm Assembly Instructions
The Raven Level 2 Rubber Band-Powered Flight. Dimensions 2”
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Fluid Power Challenge: Workshop Day
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Pneumatic Clamp Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Fluid Power Challenge: Workshop Day PRESENTERS:. Fluid Power Workshop Day INSERT DATE HERE Fluid Power Challenge Day INSERT DATE HERE Discovering Fluid.
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
Day and Night by M.C. Escher
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
1. b. Rip Saw 2. d. Used for cutting with the grain.
Step-by-step assembly instructions
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Investigating Fluid Power Rig Operating instructions (c) 2012 Mechanical Kits Ltd.
Wheels and Axles Model Assembly Instructions copyright Mechanical Kits Ltd
Levers & Fluids Rig Step-by-step assembly instructions (c) 2012 Mechanical Kits Ltd.
Up and Over Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Wheels and Axles Model Assembly Instructions copyright Mechanical Kits Ltd
What’s in the Box?
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Build A Motor You must follow the directions step-by-step!
Gluing procedure for BGO, fast and slow scintillator Mózsi Bank Kiss & Tomi Ylinen Nov. 23, 2005.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Fluid Power Challenge: Workshop Day
Fluid Power Challenge Introduction & Hints
25th Annual 7th and 8th Grade Battery Car Challenge
Catapult.
Investigating Fluid Power Rig
Hand-cranked Windmill Assembly Instructions
Workshop Rotating Platform
Workshop Rotating Platform
Step-by-step assembly instructions
Workshop Rotating Platform
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
What’s in the Box?
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
Workshop Rotating Platform
Crumble PowerPoint 4.
Step-by-step assembly instructions
Step-by-step assembly instructions
Ballista Project 2 120mm Axle hole 3 Nails 1 200mm
Step-by-Step Assembly Instructions – Cube Version
What’s in the Box?
Rocket Stability Building a Test Rocket LabRat Scientific © 2018.
Step-by-step assembly instructions
Step-by-step assembly instructions
Building an Experiment Cart
Building a Tissue Paper Hot Air Balloon
Presentation transcript:

Step-by-step assembly instructions Lifter Step-by-step assembly instructions V.5 – 2018 03 25

Contents of the Lifter Kit (Parts are pre-cut and drilled) Wooden pieces (1cm cross-section): 8 X 9cm; 6 X 8cm; 4 X 20.25cm; 2 X 8.25cm; 2 X 38mm; 3 X 25mm Green corner gussets: 2 cards Syringes, 20cc: 2 (1 has a hole in the plunger) Plastic Tubing: 1 length Wooden dowel, 5mm diam.: 2 X 12.75cm; 1 X 7.75cm Axle Holders: 16 Syringe Holder: 1 Mini-washers: 8 Stirring Sticks for spreading glue: 2 Plus a small piece of sandpaper Gluing techniques: Use sparing amounts of glue. Use craft stick to spread a thin layer of glue at all joints. Glue wood together 1st then use corner gussets (paper triangles) to reinforce the joints. 2

Glue corners on one (1) side only First, make a cube 10cm³ (outside dimensions) To make the cube you will need 8 pieces 9cm long and 4 pieces 8cm long These images show the steps involved in making the cube as set out in the next slide. Glue corners on one (1) side only 3

Just in case your team needs help making the cube 4

Add to the cube to make the structure for the Lifter. Glue two 20 Add to the cube to make the structure for the Lifter. Glue two 20.25cm pieces to one side of the cube. Reinforce by gluing two strips 10cm X 2cm on the side and the long pieces 5

Glue two 8cm pieces between the long uprights and reinforce with four green gussets or triangles 6

---------- 6cm ------ Glue an axle holder onto the outside of the top of the cube as shown. Mark the center of the axle holder and mark 6cm from the edge furthest from the uprights. Glue the axle holder into position checking it is horizontal and parallel to the 8cm piece you glued in last ---------- 6cm ------ 7

Glue two more axle holders on the inside edges to reinforce Glue two more axle holders on the inside edges to reinforce. Make sure the holes line up 8

Glue an axle holder onto the outside of so that the centre of the hole is 38mm from the top of the upright and the hole points towards the cube. Once horizontal and perpendicular to the uprights glue two more axle holders on the inside 9

Glue together three 25mm pieces using glue between the pieces Glue together three 25mm pieces using glue between the pieces. Glue two axle holders to opposite sides and trim to fit the pieces. This is the platform that will hold the acting syringe. 10

Cut out a rectangular piece from the green card and glue to the base of the platform 11

Once everything is dry, test in the structure using a longer axle and ensure smooth rotations 12

Make the arm by connecting two 20. 25cm pieces and two 38mm pieces Make the arm by connecting two 20.25cm pieces and two 38mm pieces. Use 8 corner gussets – four on each side 13

On this frame glue an axle holder in place so that its smallest angle touches the corner of the frame. Use a long axle to align and glue another axle holder on the outside of the opposite side. Test that the long axle sits across the frame parallel to the shortest end. Glue another axle holder in place so that its smallest angle touches the other smallest angle of the axle holder already glued to the frame. In the same way and using the shortest axle, align and glue in place another axle holder on the outside of the opposite side. 14

Follow by aligning and gluing in place two more axle holders on the inside of the frame as shown below The four axle holders must allow for a smooth rotation by the shorter axle. 15

There are a number of steps in assembling the lifter mechanism There are a number of steps in assembling the lifter mechanism. The first is to identify the syringe that has a hole drilled in its plunger. The shorter, 7.75cm axle fits through this hole and should turn in it – if it sticks a little use the round file to make it larger. The axle and plunger fit between the double axle holders on the arm and the outside, protruding axle is secured using a mini-washer on each end. 15

Strip the backing from the white piston syringe holder and press it firmly onto the green card on the platform 17

Place the barrel of a piston syringe into the clip Place the barrel of a piston syringe into the clip. Be careful to orientate the barrel as shown. Place the barrel of the syringe into the clip so that the clip aligns with the 15ml mark or thereabouts. 18

Mount the syringe platform onto the structure so the lip points toward the long uprights and the barrel is above the axle. Secure with four mini-washers, two securing the syringe platform and two securing the axle ends on the outside of the structure. Attach the length of plastic tubing to the end of the syringe. 19

Carefully insert the plunger into the barrel of the syringe until the holes at the end align with the holes in the axle holders glued to the uprights on the structure. Once aligned, carefully insert the axle through all six holes. The axle is secured with a mini-washer at each end. 20

To operate the mechanism attach the length of plastic tubing to the end of the acting syringe that is now housed in the structure. The other syringe should be fully extended (open) before it is connected to the other end of the tubing. Gently push the plunger down. This syringe drives the acting syringe. 21

LIFTER - open 22

LIFTER - closed 23