CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

The Cosmic R A y Telescope for the Effects of Radiation.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
STARLight PDR 3 Oct ‘01 G.1.1 Rashid STARLight STARLight Thermal Tahir Rashid STARLight Mechanical Engineer (734)
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
Fabrice Laturelle, Snecma Moteurs
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2008.
Proprietary BalloonWinds Update Author: Ivan Dors – UNH Presented By: Michael Dehring -- MAC 28 June 2006.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
1 SXC on SXG Aim: basic agreement about this SXC on SXG by the end of September (formalities may come later) Clarify key technological items Thermal environment.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope Pre-Environmental Test.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
System Performance Metrics and Current Performance Status George Angeli.
September 30th, 2008 Patrick Levacher. Plato Instrument System Group.
AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
C osmic R Ay T elescope for the E ffects of R adiation June 27, 2005Larry Kepko - Data ProcessingPage 1 CRaTER Characterization Data Products & Production.
Chapter 18 Temperature, Heat, and the First Law of Thermodynamics In this chapter we will explore the following topics: Temperature and the zeroth law.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
Kinetic and Thermal Energy. Energy ***ENERGY DURING PHASES CHANGES – Energy must be lost to the environment or gained from the environment in order for.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation CDR v1 Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Telescope - Mechanical
TEMPO Instrument Update
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
CINEMA System Engineering
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
SPP FIELDS V1234 Thermal PSR
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS INSTRUMENT SUITE
ISUAL Product Assurance
Starter Complete the quiz and hand in..
TEMPO Instrument Update
0.0 Instrument Suite Name Presenter’s name
CRaTER Pre-Environmental Review (I-PER) Programmatics Rick Foster
Instrument Preliminary Design Review (I-PDR) September 28th, 2005
CONTOUR NGIMS PRE-SHIP REVIEW
Characteristics of measurement systems
GLAST Large Area Telescope
BASICS OF MEASUREMENT AND INSTRUMENTATION
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2007.
Thermal Vacuum Test: Plans and Procedures
Systems Engineering Bob Goeke.
Digital Sub-System Bob Goeke.
Systems Engineering Bob Goeke.
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Integration and Test Organization Chart
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
CRaTER Performance Verification
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
CRaTER Thermal Analysis
GLAST Large Area Telescope
Systems Engineering (plus Data, Digital, Power)
From of energy By. Dashawn burwell.
Introduction and Overview
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2008.
Presentation transcript:

CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008

System Performance Changes Detectors Engineering units met requirements (32-05001); flight units were better. Internal Gain Thin detector gain changed from 1GeV full scale to 300MeV full scale. Mass, Power, Telemetry No substantive changes since CDR. Analyses presented at CDR are still valid No updates have been generated Mechanical loads, stress, and torque margins still adequate Thermal effects calculations still valid Radiation effects calculations still valid No limited life items

Engineering Unit Testing Extensive science performance testing in particle beams Ambient pressure temperature testing -40C to +40C Gain and offset drift are order of 0.1% over entire range; requirement is 0.5% Ran Functional Test Procedures to debug the testing process Vibration testing of ETU happened prior to CDR Models were validated at that time

Flight Unit Testing Comprehensive test (Long Form Functional) baseline completed Verification activities per Instrument Verification Plan (32-01206) in process. Category A/I/D/T Completed Percentage Science 2/9/0/7 0% Data 2/6/5/0 Electrical 3/8/0/2 Mechanical 8/1/2/3 Thermal 0/13/1/2