Reducing construction waste through design Dave Marsh Construction Project Manager.

Slides:



Advertisements
Similar presentations
Greening Construction
Advertisements

Christine Pasquire, Nick Blismas, Alistair Gibb
Site Waste Management Plans and the Code
SONAE INDÚSTRIA Environmental Policy sets the following principles for the eco-efficient management of its own business: Sustainable Forest Management;
Taking Action on Construction Waste South Ayrshire Council.
BREEAM use at the University of Bristol. Overview Background Our Approach Progress to date Lessons learnt.
Resource Efficiency Seminar Eco Design. Content What is eco design? What is eco design? Benefits of eco design? Benefits of eco design? Environment or.
Becoming a signatory to The Local Authority Business Waste Recycling Commitment Name of officer presenting Date of.
RIBA Plan of Work 2013.
REGENERATION eddBE2011 Proceedings Morgan J. Bleek, BSc (Hons) MAIBS
Demolition and Refurbishment Information Data Sheets DRIDS.
Green Remediation An Overview of the State of the Practice
Green Supply Chain Management. Introduction u Background u Product Life Cycle u Supply Chain Management u Industry Practices u The Future u Conclusions.
Waste Update Rail Environment Infrastructure Presentation Thursday 15th August 2013.
Introduction to SMARTWaste Plan – benefits for Strategic Waste Planning Katherine Adams Centre for Resource Efficiency.
IHEA Qld – 2007 Mid-Year Conference Project Development – Value Management 20 July 2007 Michael Ord.
Alan Hendry Envirowise Scotland Manager. TODAY’S OBJECTIVES  Introduce Envirowise  Introduce the Public Sector Supply Chain Project  Other examples.
WRAP and sustainable construction Mervyn Jones Head of Products and Materials WRAP 19 September 2012 SCI Network.
Realising opportunities for resource efficiency through surveying Introducing the Refurbishment Survey Toolkit (Pilot)
Waste measurement & improving performance trainer organisation location date.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #17.
Welcome Richard Waterhouse, Chief Executive, RIBA Enterprises
PRINCE2: 2009 in Practice Andy Murray, Outperform BPUG Workshops at Project Challenge are supported by:
Construction Category Management Planning Version 1.1 (May 2015)
Heading TfL Sustainability Approach and Resource management Helen Woolston, TfL Sustainability Coordinator BASE London June 2013.
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
Inger Kristiansen & Sarah Williams Envirolink Creating the Next Industrial Evolution.
Construction Commitments: Halving Waste to Landfill Workshops March 2009.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
TECHNICAL UNIVERSITY OF DENMARK G. Singh Bhander LCM2003 Conference Seattle, USA 22 – 25 September 1 DEPARTMENT OF MANUFACTURING ENGINEERING AND MANAGEMENT.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Airbus Production System
Cannon Place, London, UK Resource Efficiency in Construction Eddy Taylor – Head of Sustainability, Laing O’Rourke BASE London, 11 July 2013.
Construction Commitments: Halving Waste to Landfill Workshops November - February 2009.
1. Hybrid Planning Application Detailed Application = Stadium and related infrastructure Outline Application = Enabling development sites 2.
2014 Reports to the Minister Markets Team Ken Michael Room, 25 September 2014 Ensuring quality services for a reasonable price 1 Workshop.
Resource Efficient Construction Richard Buckingham Head of the Built Environment WRAP BASE London 11 th July, 2013.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
1 Poole Grammar School Accommodation of Yr 7 Children Partnership Agreement February 2007 Michael Thompson TEAM FOCUS – RTL Ltd.
INTD 51 sustainable environments asking the right questions.
©2002 Gammon Construction Limited. All Rights Reserved Low Carbon Construction – A Contractor’s Perspective and Experience 21 September 2010 Hong Kong.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
An introduction to the Net Waste Tool An overview of its benefits and functions.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Workshop on Eurocodes: Training the trainers, Moscow, 9-10 December, European Legislation and Standardization: Benefits of International Cooperation.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
A Professional Development Series from the CDC’s Division of Population Health School Health Branch Professional Development 101: The Basics – Part 1.
FRA34 Framework training and update. Agenda introductions Halving Waste to Landfill update design out waste tools – what's new? coffee break cost benefit.
1.4 Developing business plans. Candidates should be able to: explain the purpose of a business plan list the contents of a business plan analyse the benefits.
The Nigerian Institute of Quantity Surveyors PRICING TENDER DOCUMENT BASED ON BESMM4 By Dr. GANIYU AMUDA YUSUF (FNIQS, RQS) Department of Quantity Surveying.
Construction and the Built Environment Diploma September 2006.
The Design Tool for Civil Engineering projects – an overview Phil Birch & Susan Steensma Cyril Sweett
Marketing Task 2 Research and analyse the resources available to the business.
TI Manual for Assessing Integrity in the Development and Implementation of National REDD+ Strategies Claire Martin PAC REDD Project.
THE VALUE OF STRUCTURAL ENGINEERING TO SUSTAINABLE CONSTRUCTION
‘Sustainability Matters – it’s the future of your business’
Design Quality (30%) - 6slides
Sustainability and the Built Environment
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
Design Quality (30%) - 6slides Explain your key concept? (2slides)
Green Building and Sustainable Architecture
Circular Economy Opportunities in The Construction Sector
Water Services Trust Fund
Resource Efficient Scotland
Supply Chain Challenge
Green Building and Sustainable Architecture
Design Quality (30%) - 6slides
Poole Grammar School Accommodation of Yr 7 Children
Sustainable buildings
Presentation transcript:

Reducing construction waste through design Dave Marsh Construction Project Manager

WRAPs approach How to Design out Waste – key principles – design review process Tools and resources contents

WRAPs approach

Architects Civil engineers Geotechnical engineers Structural engineers Cost consultants / quantity surveyors Specialist technical consultants Landscape architects Interior / fit out designers designers including

Designing out waste water efficiency accessibility sustainable procurement energy efficiency future proofing recycled content BREEAM embodied carbon

Raising awareness Tools and guidance Advocacy and training WRAP with designers

Raising awareness –Workshop events –RIBA design competition –Case studies –Marketing & PR WRAP with designers

Raising awareness Tools and guidance –Design guides –Design detailing data sheets –Cost benefit analyses –Design tools WRAP with designers

Raising awareness Tools and guidance –Design guides –Design detailing data sheets –Cost benefit analyses –Design tools WRAP with designers

Raising awareness Tools and guidance Advocacy and training –Direct engagement –In-house seminars –Self-help resources WRAP with designers

How to go about it

Design for … 1. Reuse and recovery 2. Off site construction 3. Materials optimisation 4. Waste efficient procurement 5. Deconstruction & flexibility five principles

design for reuse & recovery Insert relevant image

reuse & recovery Can materials from demolition be reused in the design? Can reclaimed products or components be reused? Can materials be reused at their highest value? Can excavation materials be reused? Can cut and fill balance be achieved? How can it be optimised to avoid spoil removal from site? key questions

design for off site construction

off site construction Can any part of the design be manufactured off site? Can site activities become a process of assembly rather than construction? key questions

design for materials optimisation

materials optimisation Can the design, form and layout be simplified? Can the design be coordinated to minimise excess cutting and jointing? Is the building designed to standard material dimensions? Can the range of materials required be standardised to encourage reuse of off-cuts? Is there repetition and coordination of design to reduce number of variables? key questions

design for waste efficient procurement

Has research been carried out by the Design Team to identify where onsite waste arises? Have specialist contractors been consulted on how to reduce waste in the supply chain? Have the project specifications been reviewed to select elements / components / materials and construction processes that reduce waste? key questions waste efficient procurement

design for deconstruction & flexibility

Is the design adaptable for a variety of purposes during its life span? Does the design incorporate reusable/recyclable components and materials? Are the building elements/components/materials easily disassembled? key questions deconstruction & flexibility

Design for … 1. Reuse and recovery 2. Off site construction 3. Materials optimisation 4. Waste efficient procurement 5. Deconstruction & flexibility five principles

The design review process

Use existing design team meetings RIBA stage C Facilitated workshop Review design review process

3 sessions Awareness Creativity Reasoning design review process

next steps Decide on options Allocate responsibilities Review at meetings Record in SWMP design review process

Tools and resources

design guidance

case studies

Net Waste Tool

Achieving good practice in regeneration projects reclaimed materials

Achieving good practice in regeneration projects Reclaimed products guide reclaimed materials

recycled content Recycled products guide

recycled content Recycled products guide Rules of thumb

SWMP template

Summary

WRAPs approach How to Design out Waste – key principles – design review process Tools and resources summary

Questions