IEC Ed. 2 Conformance Testing Best Practice

Slides:



Advertisements
Similar presentations
EIDE System Requirements and Specification Documents
Advertisements

Enabling Secure Internet Access with ISA Server
CT-KIP Magnus Nyström, RSA Security OTPS Workshop, October 2005.
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 Richard Schimmel ENERGY First Experiences with IEC 6185 Ed2 testing 1 DNV KEMA is now DNV GL.
IEC Substation Configuration Language and Its Impact on the Engineering of Distribution Substation Systems Notes Dr. Alexander Apostolov.
AMA ServerSim-G Use Cases (UC). AMA-SYSTEMS GmbH D Pforzheim August 2014 AMA ServerSim-G Use Cases Page 2 Content  AMA-Systems GmbH.
1 CMPT 275 Software Engineering Requirements Analysis Process Janice Regan,
Robert Horn, Agfa Corporation
Herbert Falk UCA IOP Group Meeting April 1, 2011 UCA Paris 2011 IOP Results Report ©2011 UCAIug Paris 2011 IOP Results - IEC UCAIug Pv1 1.
Configuration Management Supplement 67 Robert Horn, Agfa Healthcare.
1 Preparing a System Security Plan. 2 Overview Define a Security Plan Pitfalls to avoid Required Documents Contents of the SSP The profile Certification.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
לירן קציר Connectivity in Computers IEC TC 57 - Power system management and associated information exchange Established in 1964 – with focus.
Distributed Systems: Concepts and Design Chapter 1 Pages
Scalable Systems Software Center Resource Management and Accounting Working Group Face-to-Face Meeting October 10-11, 2002.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
(Business) Process Centric Exchanges
IETF 60 – San Diegodraft-ietf-mmusic-rfc2326bis-07 Magnus Westerlund Real-Time Streaming Protocol draft-ietf-mmusic-rfc2326bis-07 Magnus Westerlund Aravind.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Session Peering Protocol over SOAP I-D ( draft-ietf-drinks-spp-over-soap-01) draft-ietf-drinks-spp-over-soap-01 0 Presenter: Vikas Bhatia (On behalf of.
ESafe Open Modules Overview Open modules implementing the eSafe document exchange protocol.
SIP working group IETF#70 Essential corrections Keith Drage.
Submission doc.: IEEE 14-22/0098r0 July 2014 Slide 1 P PAR and CSD Comment Resolution Date: Authors:
IETF-90 (Toronto) DHC WG Meeting Wednesday, July 23, GMT IETF-90 DHC WG1 Last Updated: 07/21/ :10 EDT.
© NOKIAMSF Paris drieft-ietf-grmp-04.PPT / 28 March, 2000/ ADo page: 1 Review of draft-ietf-gsmp-04 Avri Doria, Nokia Fiffi Hellstrand, Nortel Networks.
© 2012 IBM Corporation 3 rd Party Registration & Account Management 1 1 SMT Post R 4.3 Potential Enhancements.
ASP-2-1 SERVER AND CLIENT SIDE SCRITPING Colorado Technical University IT420 Tim Peterson.
Submission doc.: IEEE 14-22/0098r0 July 2014 Slide 1 P PAR and CSD Comment Resolution Date: Authors:
F2F April 7, Enumeration & Connection Management presented by Chris Pane.
Multiple Interfaces (MIF) WG documents status MIF WG IETF 80, Prague Problem statement and current practices documents.
IETF 83 CloudLog Gene Golovinsky March 25-30, 2012.
Nokia Internal Use Only Outline Status of the PAWS protocol document Open Issues – Review extensibility and IANA registries.
CH9. HOST CONTROLLER INTERFACE AND COMMANDS CH10. LOGICAL LINK AND ADAPTATION PROTOCOL(L2CAP) RTLAB YuJin Park.
Doc.: IEEE /2179r0 Submission July 2007 Steve Emeott, MotorolaSlide 1 Summary of Updates to MSA Overview and MKD Functionality Text Date:
Jaringan Telekomunikasi, Sukiswo ST, MT Sukiswo
Architecture Review 10/11/2004
Application Layer Functionality and Protocols Abdul Hadi Alaidi
Testing Technical Committee Paris, France August 24, 2010
Enabling Interoperability for the Utility Enterprise
Open issues with PANA Protocol
OGF PGI – EDGI Security Use Case and Requirements
CS408/533 Computer Networks Text: William Stallings Data and Computer Communications, 6th edition Chapter 1 - Introduction.
PANA Issues and Resolutions
Physical Data Model – step-by-step instructions and template
CONTENT MANAGEMENT SYSTEM CSIR-NISCAIR, New Delhi
MAF&MEF Interface Specification discussion of the next steps
Chapter 2: System Structures
Single Point of Entry (SPOE)
Testing and Certification according to ISO and ISO 17065
Outline Introduction Switchgear Modeling in IEC 61850
Joe Clarke (presenting)
Migration-Issues-xx Where it’s been and might be going
Lesson 16-Windows NT Security Issues
Configuring Internet-related services
27-31 August 2018 Palais de Congrès
27-31 August 2018 Palais de Congrès
AES The Alliance's name for the proposal is OCA 1.4.
Proposal for Extensible Security
Chapter 2: Operating-System Structures
SNMP (Simple Network Management Protocol) based Network Management
Business Process Management
EIDE System Requirements and Specification Documents
Network Services Interface
Web-based Imaging Management System Working Group - WIMS
PSS0 Configuration Management,
Chapter 2: Operating-System Structures
CSPA Templates for sharing services
CSPA Templates for sharing services
Presentation transcript:

IEC 61850 Ed. 2 Conformance Testing Best Practice Maurizio Scavazzon TÜV SÜD Product Service GmbH Smart Grid Services UCAIug booth #370, Level 3, CIGRÉ 2014 Exhibition, Palais des Congrès, Paris, France UCAIug booth #370, Level 3, CIGRÉ 2014 Exhibition, Palais des Congrès, Paris, France CIGRÉ 2014, Paris, France Maurizio Scavazzon

What‘s new in IEC 61850 Edition 2? - 1 Device models – added many logical nodes which extend the usage outside the substation domain Expanded the length of object names to 128 characters Many paragraphs have been clarified with more and more precise text Expanded use of the configuration language to allow bottom-up system design and multiple projects Added “service tracking” Defined communication redundancy for systems (PRP/HSR) Address security mechanism for 61850 through the IEC 62351 Standard Clarified error responses when “things go wrong” CIGRÉ 2014, Paris, France Maurizio Scavazzon

What‘s new in IEC 61850 Edition 2? - 2 Added many mechanisms to deal with testing, simulation, and system maintenance Standard Scope changed from “substation …” to “power utility …” to recognize use outside of substations Defined named enumeration distinct from countable integers (big step forward) Many other minor changes including data types and data objects New SCL file extension (.iid, Instantiated IED description, .sed, System Exchange Description) CIGRÉ 2014, Paris, France Maurizio Scavazzon

References for Testing IEC 61850 Edition 2 parts 6, 7-x, 8-1, 10 Conformance Test Procedures for Server Devices with IEC 61850-8-1 Edition 2 interface, Revision 1.0 Test Procedures Change List (TPCL) version 1.0 for IEC 61850 Edition 2 server test procedures revision 1.0 “IntOp2” TISSUES SCL schema, version 2007B UCA Quality Assurance Program for IEC Device Implementation Testing and Test System Accreditation and Recognition Quality Assurance Program Addendum for IEC 61850 Specific Product Testing CIGRÉ 2014, Paris, France Maurizio Scavazzon

Actual Status of UCAIug Test Procedures IEC 61850 Ed 1 Ed 2 Test Procedure TPCL Server 2.3 1.8 1.0 Client 1.1 1.2 - 9-2LE Publisher GOOSE performance 1.4 TPCL: Test Procedure Change List CIGRÉ 2014, Paris, France Maurizio Scavazzon

IEC 61850 Ed. 2 Conformance Testing - 1 CIGRÉ 2014, Paris, France Maurizio Scavazzon

IEC 61850 Ed. 2 Conformance Testing - 2 CIGRÉ 2014, Paris, France Maurizio Scavazzon

Relevant documents for certification PICS (Protocol Implementation Conformance Statement) MICS (Model Implementation Conformance Statement) PIXIT (Protocol Implementation eXtra Information for Testing) TICS (TISSUES Implementation Conformance Statement) SCL File (ICD) CIGRÉ 2014, Paris, France Maurizio Scavazzon

Example of Doc Checking Failure Example from a Customer ID Description Value / Clarification As1 Maximum number of clients that can set-up an association simultaneously 5 As2 TCP_KEEPALIVE value …-seconds As3 Lost connection detection time As4 Is authentication supported N As5 What association parameters are necessary for successful association Transport selector Y/N Session selector Y/N Presentation selector Y/N AP Title Y/N AE Qualifier Y/N As6 If association parameters are necessary for association, describe the correct values e.g. Transport selector 0001 Session selector 0001 Presentation selector 00000001 AP Title <value> AE Qualifier <value> As7 What is the maximum and minimum MMS PDU size Max MMS PDU size 45000 Min MMS PDU size … As8 What is the maximum start up time after a power supply interrupt 10 seconds <additional items> FAIL FAIL FAIL FAIL CIGRÉ 2014, Paris, France Maurizio Scavazzon

IEC 61850 Conformance Testing – dynamic tests SELECT FIRST Test Case EXECUTE SELECT NEXT Test Case BUG FIX FIRMWARE UPDATE FAIL ? TEST COMPLETE ? CERTIFICATE START NO YES VENDOR TESTER CIGRÉ 2014, Paris, France Maurizio Scavazzon

2. Example 2 of TC as enhancement of Ed.1 sSgN1 Setting group selection services with wrong parameters  Passed  Failed  Inconclusive IEC 61850-7-2 Subclause 16.2, 16.3 IEC 61850-8-1 Subclause 16.2 PIXIT Expected result DUT sends SelectActiveSG response- with data access error=object-value-invalid DUT sends GetEditSGValue response- with data access error=object-non-existent DUT sends GetSGCBValues response- with data access error=object-non-existent Test description Client requests SelectActiveSG with null or NumOfSg+1 setting group If GetSGValues is supported, client requests GetEditSGValue(FC=SG/SE) with unknown object Client requests GetSGCBValues with unknown object Comment Expected result a), b), c) Specify in more detail the expected result CIGRÉ 2014, Paris, France Maurizio Scavazzon

Differences between Ed1 and Ed2 Certificates Example of Ed 1 Certificate CIGRÉ 2014, Paris, France Maurizio Scavazzon

Differences between Ed1 and Ed2 Certificates Example of Ed 2 Certificate CIGRÉ 2014, Paris, France Maurizio Scavazzon

Maurizio Scavazzon Global Product Manager Communication Protocols Any questions? Maurizio Scavazzon Head of Smart Grid Services Phone: +49 89 5008-4747 Fax: +49 89 5155-2444 maurizio.scavazzon@tuev-sued.de www.tuev-sued.de/smartgrid TÜV SÜD Product Service GmbH Smart Grid Services Barthstr. 16 / 3.OG 80339 Munich Germany Maurizio Scavazzon Global Product Manager Communication Protocols antonello.gaviano@tuev-sued.de Phone: +49 89 5791-2693 Fax: +49 89 5791-3437 22/09/2018 V-INM