Thursday 09:30 VdM scan for CMS, standard ADT gain.

Slides:



Advertisements
Similar presentations
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Advertisements

Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Wednesday 5 th December until this morning 06:59 Stable beams fill #3375, L ~ 6.8e33 cm-2s-1. 10:40 Beam dump, trip of RD2.R5. Integrated L 72 pb-1 in.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Friday 15th June 01:11 Injection.
Wednesday September 14th
Summary week 23 Luminosity production
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Fri 15th – Sun 16th June Friday Saturday Sunday Monday
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Friday 31st August & night
Thursday 10th May - morning
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday Loss maps in the night:
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Thursday :00: Physics fill from the night shift
Not the most productive 24 hours on record
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
LHC Morning Meeting - G. Arduini
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Programme for Saturday 10 July
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Summary week 18 Intensity ramp up & production
Saturday 3rd November - morning
Saturday Nov Stop proton operation. Switch back to ions
Tue/Wed 12/ :00 Probe beam back again
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Friday morning 08:00 Stable beams with 840b.
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Monday 27th August & night
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Friday :47 stable beams fill 3273
Saturday Luminosity production 1380 bunches
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Friday 1st October : Van der Meer scans
Mon 8/8 – Tue 9/8 Stable beams #2009
Presentation transcript:

Thursday 09:30 VdM scan for CMS, standard ADT gain. First scan with +- 3 sigma TOTAL separation (we were not sure about the GUI). Then 2 scans with +- 6 sigma TOTAL separation. No problems, no losses. 9/23/2018 LHC 8:30 meeting

Thursday 10:15 Test with reduced ADT H gain. Separation in IR1 & IR5. Increased activity on tune with reduced ADT gain and with separation. Activity on the batches of 72 bunches (B1 &B2) on the ADT side, losses on a few isolated bunches of B1. 9/23/2018 LHC 8:30 meeting

ADT test BBQ activity ADT gain Separation 9/23/2018 LHC 8:30 meeting

ADT test Losses, B1 9/23/2018 LHC 8:30 meeting

Thursday Beam dump due to patrol loss/access door in PM56, with 200 pb-1 integrated in the fill. The door (YCPS01=PM45) opened because it was not properly closed (but seen closed by the LASS contacts). Probably the effect of a pressure change… This situation can actually be detected, but no info in the CCC. Asked GS to get a simple view to detect such situations. Another door in Pt2 was in the same state  went in to close it. Patrol in PM56, access for ALICE, cryo in Pt8. 15:00 Filling again. ½ ADT modules trip during filling – vacuum. Managed to switch on after a few minutes. Gauge trips after vacuum spikes. Recurrent problem  exchange in TS2. 9/23/2018 LHC 8:30 meeting

Thursday evening 17:00 Stable beams fill 2710, 6.4E33 cm-2s-1. 19:45 Beam dump, electrical perturbation – FMCM and RQ4.L3 trip. 52 pb-1 integrated luminosity. RQ6.R7B2 trip when moving to start of ramp-down. Recovering some RF lines that had tripped required rebooting a number of crates. Perturbation on D1 : 0.6 A / 380 A 9/23/2018 LHC 8:30 meeting

Thursday evening+ Refill delayed to 21:00 due to PS mains problem. 22:50 Stable beams fill 2712, 6.6E33cm-2s-1. Problem with the heating system of the current lead of RQ7.R1. Access required in RR17 today at the end of the fill. Keep this fill until ~10:00-10:30, then access for cryo. From a few minutes to 1-2 hours. 9/23/2018 LHC 8:30 meeting

Pending Impact of TETRA on hump / beam. 30 mins at injection with probe bunches. SPS Q20 extraction tests to TI2/8 downstream TED. During LHC downtime – would need Pt2/8 closed, injection OK from ALICE/LHCb. Accesses: RQ7.R1 lead heating. TCLIB.6R2.B1 electronics and LVDT sensor MAD PM15: motors of inner doors not working RQTL11.R7B2 temp DFBAN spikes affecting cryo start but not CM (~3 to 5 hours). BI in Pt4 (3-4 hours, working hours). MKA test in Pt4 (1-2 hours). TOTEM vacuum gauge (3 hours). MCBV18.L4B1 to repair. 9/23/2018 LHC 8:30 meeting

For discussion – Leap second Saturday 30th June at 23:59:59 a leap second will be added to the UTC time. This will shift NTP time distributed over the network from the UTC time distributed by the timing systems (all machines). Question from timing team: Can the re-synch be done Mo 2nd July (all machines) or does it have to be done in the night of 30th June? Clearly the logging from difference source will be out of step. 9/23/2018 LHC 8:30 meeting