Methods and Procedure for adjusting eccentric cones in INFN configuration Peter Amnuaypayoat 5/14/04.

Slides:



Advertisements
Similar presentations
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Advertisements

Some RF contacts and power transmission lines. Annual maintenance of RF power transmission lines in BA3 Philips plant Once per year, we have to dismount.
Alignment.
Control Arm Adjustment
Technical Committee Orlando, Florida July 25, 2007.
Inside-, Depth-, and Height-Measuring Instruments
5/12/20151 Exp.3: Micrometers &Feeler, Pitch, Radius and Dial gauges Exp.3.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Lathe.
Special Milling Operations
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
MACHINE TOOLS Dept. of Mech & Mfg. Engg..
Experiment 6 hydrate Operation of bunsen burner and crucible heating When ready, attach the bunsen burner to the gas jet(blue cap). Turn the burner tube.
Mounting, Removing, and Aligning Lathe Centers
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Cavity support scheme options Thomas Jones 25/06/15.
Design Progress Allen Ellis 18-September
GHP 2014 Avery Andrews Archish Chaturvedi Nandan Dave.
The Bunsen Burner Parts, Safety, Lighting Procedure
By: Stephanie H..  m+Corning+Ar&ie=UTF- 8&ei=zlX6UqWVLcidyQGN7YH4Ag&ved=0CAcQ_AUoAQ
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Vernier Calipers Unit 10.
Tim Marker Discussion of Burnthrough Test Method for Aircraft Thermal Acoustic Insulation Blankets FAA Technical Center.
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
The Centre Lathe. Produced by Neil Liggett.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
ME 4182 Conceptual Designs Team: Fantastic 5 3:00 pm February 01, 2006.
Multiplying Binomials
SSA Module Assembly ANNEX 0 - Assembly sequence
Annex 5 - Tower and Lock installation
Annex 4 - Moving Frame and Whiffletree assembly
Check the focal distance of the lens
Ladder Assembly All tools and jigs produced Glue dispensing works
Ladder Assembly All tools and jigs produced Glue dispensing works
Assembly procedure – Inner Region
Levels of Organization Ecology Flow
Installation step 4. (3 days)
Report on construction of LP2 spaceframe endplate
Integration issues at IHEP
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Horizontal Milling Operations
Proposed tools and methods for adjusting eccentric cones in INFN configuration Peter Amnuaypayoat 4/29/04.
Continuous Slot Well Screens.
CNC Machining.
What do you wonder about? “Find your passion and begin your journey.”
A. Author, A. Author, A. Author, A. Author, A. Author, A. Author,
זכויות סוציאליות.
(Preliminary) WIYN 0.9 Meter Collimation Procedure
GLAST Large Area Telescope:
Levels of Organization Ecology Flow
Topic of assignment. Shaper machine. Construction. Working principle.
XY Scanner Mount.
By Jasminder,Rhon,Aaron,Rozy & Zyrhon
Tracker to Tracker Clearance Reduction Contributors
Coil Fabrication Status
GEn-RP engineering & design Status
Presentation transcript:

Methods and Procedure for adjusting eccentric cones in INFN configuration Peter Amnuaypayoat 5/14/04

Procedure Adjust inner cone relative to outer cone Apply reference location(s) on clamping template(s) Attach clamping template to Flexure mount Align preset cones to clamping template Set cones

Adjustment of inner cone relative to outer cone Inner cone adjustment dial Template Inner and Outer Cones Slotted base for cone removal

Apply reference location(s) to clamping template Temporary reference location(s) Will be made on Template

Attach clamping template to flexure mount Align preset cones to clamping template Set cones Extract if needed Flexure mount Adjustment tool Template Preset inner-outer cones