Towards an Improved Proposal Development Process for VHT

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1392r0 Submission November 12, 2008 De Vegt (Qualcomm)Slide 1 Inputs for a VHT Selection Procedure Date: Authors:
Advertisements

Doc.: IEEE /0237r0 Submission February 12, 2009 Rolf de Vegt (Qualcomm)Slide 1 Inputs for a ac Spec Framework Methodology Date:
Doc.: IEEE /1294r0 Submission September 2011 Rolf de Vegt, QualcommSlide 1 Spec Framework Text for.11ah Bandwidth Modes Date: Authors:
Doc.: IEEE /1167r0 Submission November 2009 Osama Aboul-Magd (Samsung)Slide 1 TGac Ad Hoc Group Operation and Chair Selection Procedure Date:
Doc.: IEEE /0184r0 Submission January 2011 Rolf de Vegt (Qualcomm)) Slide ah Spec Development Discussion Document Date: Authors:
Doc.: IEEE 11-14/1432r1 Submission Nov Minho Cheong, ETRISlide 1 Proposed ax Specification Framework - Background Date: Authors:
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
Doc.: IEEE /0707r0 Submission May 2011 Minyoung Park, Intel Corp.Slide 1 Overview on TGah Specification Framework Development Date:
Doc.: IEEE /1296r3 Submission September 2011 Rolf de Vegt, QualcommSlide 1 Potential Channelization for ah Date: Authors:
Doc.: IEEE /0147r0 Submission January 2012 Rolf de Vegt (Qualcomm)) Slide ai Spec Development Process Update Proposal Date:
Doc.: IEEE /0025r1 Submission January 2012 Rolf de Vegt (Qualcomm)) Slide ai Spec Development Discussion Document Date: XX Authors:
Doc.: IEEE /0294r2 Submission March 2012 Jonathan Segev (Intel)Slide 1 Active Scanning Reply Window Date: Authors:
Doc.: IEEE /0548r2 Submission May 2013 Rolf de Vegt, QualcommSlide 1 Strawpolls Regarding HEW Study Group Leadership Structure Date:
11ac 80MHz Transmission Flow
A Proposed Timeline for IEEE ba TG
Resolving Deadlocks in Comment Resolution
Month Year doc.: IEEE yy/xxxxr0 May 2012
Requirements Discussion
TGac Ad-hoc lifecycle model
TGac Documents and Timeline
80MHz Tone Allocation Date: Authors: Month Year Month Year
<month year> doc.: IEEE < e>
Preamble Parameters Date: Authors: Slide 1.
Proposed Modification to the Draft ad Selection Procedure
Towards an Improved Proposal Development Process for VHT
VHT SG September 2008 Closing Report
doc.: IEEE <doc#>
<month year> doc.: IEEE < e>
Guidelines for Internal TGad Comment Submission and Resolution
TGe “Fast-Track” Proposal
TGac Ad-hoc lifecycle model
Guidelines for Internal TGad Comment Submission and Resolution
Below 6GHz 11vht PAR scope and purpose discussion
Proposed Specification Framework for TGac – Introductory Comments
Light Communications Task Group BB Progress Document
TGac Ad-hoc lifecycle model
Proposed Scope for Tgac Ad Hoc Groups
Listen to Probe Request from other STAs
Submission Title: [TGn Liaison Report] Date Submitted: [20Jan2006]
Proposed Specification Framework for TGac – Introductory Comments
Avoiding unnecessary delays in the WG Letter Ballot process
Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005]
802.11ai Spec Development Process Update Proposal
Coexistence of CMs with different decision making algorithms
Submission Title: [TGn Liaison Report] Date Submitted: [17Nov2005]
Proposed Specification Framework for TGac – Introductory Comments
February 19 March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: RFID-SG Closing Report for Orlando,
Options for TGaa Proposal Selection Procedures
Proposed work items and timeline for the LC SG
Proposed Specification Framework for TGac – Introductory Comments
Proposed Modifications to VHT60 PAR
Single User MCS Proposal
VHT SG November 2008 Closing Report
Bits Consideration for SIGNAL fields
802.11ax Spec Development Process Proposal
VHT SG January 2008 Closing Report
19 September 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PHY Subcommittee Scottsdale Report]
Timeline for the Light Communications TG
11ac Explicit Sounding and Feedback
VHT SG March 2008 Closing Report
11ac 80MHz Transmission Flow
Strawmodel ac Specification Framework
Bits Consideration for SIGNAL fields
Spec Framework Decision Process Alternatives
Month Year doc.: IEEE yy/xxxxr0 May 2012
TGac January 2009 Closing Report
Proposed Scope for Tgac Ad Hoc Groups
802.11ax Spec Development Process Proposal
Discussion on The EHT Timeline and PAR Definition
Presentation transcript:

Towards an Improved Proposal Development Process for VHT Month Year doc.: IEEE 802.11-yy/xxxxr0 May, 2008 Towards an Improved Proposal Development Process for VHT Date: 2008-05-12 Authors: Rolf de Vegt, Qualcomm, Inc. John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 May, 2008 Towards an Improved Proposal Development Process for VHT May 12, 2008 Submission for the May 2008 IEEE 802.11 VHT Study Group Meeting in Jacksonville Rolf de Vegt, Qualcomm, Inc. 2 John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 May, 2008 IEEE 802.11 Abstract This submission is a contribution for the 802.11 VHT Study group. This contribution contains an outline for a possible approach to be used in the VHT taskgroup(s) for development of the technical specification. Rolf de Vegt, Qualcomm, Inc. John Doe, Some Company

Context and Introduction Month Year doc.: IEEE 802.11-yy/xxxxr0 May, 2008 Context and Introduction The Selection Procedure used for 802.11n and other 802.11 is based on a process of continuous down selects of competing proposals The use of this down-select procedure has contributed to considerable delays in the standardization process This brief presentation introduces a possible alternative approach to be used by the VHT Taskgroup(s) This presentation is a first draft, and collaboration on further development of the concept with other participants is highly appreciated Rolf de Vegt, Qualcomm, Inc. John Doe, Some Company

Outline of an Alternative Process Month Year doc.: IEEE 802.11-yy/xxxxr0 Outline of an Alternative Process May, 2008 Taskgroup develops consensus around a framework for spec elements Aim is to achieve consensus, potentially using simple majority voting when needed See next slides for examples from .11n Taskgroup votes to approve a document that describes all spec elements, with the intent that this solidifies the scope of the new specification Participants create proposals for one or more spec elements Could in theory cover all Spec Elements (i.e. ‘Complete Proposal’) but not necessarily Once the Taskgroup has a coherent enough solution for all spec elements, a vote takes place to send the draft spec out for Letterballot Rolf de Vegt, Qualcomm, Inc. John Doe, Some Company

Example of Framework for Spec Elements (.11n PHY) Month Year doc.: IEEE 802.11-yy/xxxxr0 May, 2008 Example of Framework for Spec Elements (.11n PHY) Illustrative Encoder Puncturer Parser Interleaver QAM Mapper Antenna Mapper iFFT Window & GI RF Pilot Preamble Agreed upon Under discussion Rolf de Vegt, Qualcomm, Inc. John Doe, Some Company

Example of Framework for Spec Elements (.11n MAC) Month Year doc.: IEEE 802.11-yy/xxxxr0 May, 2008 Example of Framework for Spec Elements (.11n MAC) Illustrative Rolf de Vegt, Qualcomm, Inc. John Doe, Some Company

Key Benefits of Proposed Approach Month Year doc.: IEEE 802.11-yy/xxxxr0 May, 2008 Key Benefits of Proposed Approach Emphasis on consensus building Technology selection based on technical merits Fair and balanced consideration of which elements to include in the spec Equal access for all participants to contribute technically sound elements to the specification Decision process favors a single solution for a problem over multiple alternative solutions Rolf de Vegt, Qualcomm, Inc. John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 May, 2008 Proposed Next Steps Follow up sessions with individuals who are interested in further developing the concept Ensure that alternative selection procedures are not excluded from the PAR and 5C documents Rolf de Vegt, Qualcomm, Inc. John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 May, 2008 Strawpoll, May 2008 Strawpoll: do you support further development of the proposal process outlined in 08/579? Yes: 33 No: 4 Abs: 25 Rolf de Vegt, Qualcomm, Inc. John Doe, Some Company