Ascending to IED compliance

Slides:



Advertisements
Similar presentations
Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
Advertisements

Best Available Techniques (BAT)
ADBA PERMITTING WORKSHOP 27 March 2013 Stephen Barnes, Technical Director, Wardell Armstrong.
EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
Industrial Pollution Control - Harmonization and Implementation in Bulgaria Slavitza Dobreva Ministry of Environment and Water Bulgaria Final Seminar.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
Kimberton, PA | Columbus, GA | Strategic Air Planning: Where Do We Grow From Here? Colin McCall |
Proposed Rule Accreditation of Third-Party Auditors/Certification Bodies
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
Contribution of European waste management industry to greenhouse gas reduction Alexander Wallisch Taskforce Greenhouse gas FEAD.
Atmosphere and Local Environment Preparation of a Guidance Document on Economic Instruments.
Implementation of IED Implications for industry, particularly those involved in waste management, and the influences it has on permitting Dynes Solicitors.
The Environment Agency Alasdair McKellar – PPC/COMAH Regulatory Officer.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Air Quality Governance in the ENPI East Countries Regulation of non-Annex I activities in the CR and UK Monika P ř ibylová.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Fichtner Consulting Engineers UK Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble.
UNEP Training Resource Manual Topic 11 Slide 1 Aims of EIA implementation and follow up are to: F carry out conditions of approval F ensure they work effectively.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Successful Application of SEP In Sitting Of Industries.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
BERCEN plenary meeting Sofia, March 18, 2005 Agenda item 8 Draft Scope and Proposed Location of BERCEN Training 2005 BERCEN Secretariat.
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
I RIS E NVIRONMENTAL Independent Review of Documents Pertaining to the Lehigh Southwest Cement Permanente Facility Rob Balas & John McLaughlin February.
The IED/ELVs as seen through the Eyes of a User of Combustion Plant Dr Tim Rotheray.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
ISO Session 3 Environmental Management and Ethics in Management.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
Brownfield Register Making Data Standards Work Kevin Flanagan April 2016.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Principal Investigator ESTCP Selection Meeting
Ascending to IED compliance
Legislation Carl James.
MJAC Founded 1928 December 2016
Civil Contractors Federation ‘2017 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
Public Meeting For Scoping Of An Environmental Impact Statement (EIS) For The Perham Resource Recovery Facility: Introductions Agenda Good evening, my.
EU’s CO2 Emissions Trading Scheme – Benchmarks for Free Allocation from 2013 Onwards 9 September 2010 Hans Bergman DG Climate Action European Commission.
First position of the Belgian industry about the
Principal Investigator ESTCP Selection Meeting
Rebecca Rhodes, Senior Associate, UVAC
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session The Road Accident Fund 06 August 2013.
Recommendations from the Stage 3 Trial Review
- Progress and planning- European Commission
Seed Dust Working Group
Outcross Resources - Services Overview
Forum for Air quality Modelling FAIRMODE ew. eea
Shaping the future of Laverstock and Ford Parish
Experience in the UK in implementing E-PRTR and Data Validation
Comprehensive Safety Analysis (CSA) 2010 Supplemental Slides to discuss Data Preview with Motor Carriers U.S. Department of Transportation Federal Motor.
ASSESSING THE ENVIRONMENTAL CONSEQUENCE OF POTENTIAL MAJOR ACCIDENTS
Relationship between World Bank and Romanian EA requirements
MSFD Com Dec 2010/ 477/ EU review Recommendations for D2
Pre Construction Risk Analysis
Study on non-compliance of ozone target values and potential air quality improvements in relation to ozone.
- Progress and planning- European Commission
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
Region 4 Air Directors Spring Meeting May 20, 2015
Finalisation of study report
DG ENV C3 Industrial Emissions, Air Quality and Noise 20 January 2012
Finalisation of study report
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

Ascending to IED compliance If you identified via our ‘Cones of Pain’ diagram / ‘IED: IN or OUT?’ guide that you need to comply with the Industrial Emissions Directive (because you have more than 50MWth combustion capacity), then we have put together this useful summary on the steps to compliance with IED. Once permitted, comply with on-going monitoring and reporting requirements and pay annual fees Step 4 – Submit the Application to the Environment Agency and pay EA fees The Application Application Form – Standard Environment Agency template forms Non-Technical Summary – Summarises key aspects and findings of the supporting information Best Available Techniques (BAT) Assessment – Technical assessment to establish the suitability of the activities on site against published technical guidance documents. Environmental Risk Assessment – risk assessment undertaken against set criteria. Atmospheric dispersion modelling assessment – to assess potential impacts on air quality from operation of generators under different conditions. Site Conditioning Report – to assess current conditions and provide a baseline document such that the condition of the land can be monitored. The Operator Risk Assessment assesses the risk of the proposed facility. This will inform the EA fees associated with the Permit. Step 3 – Prepare the Application and complete the OpRA Profile Step 2 – Identify the boundaries of your permitted facility (The Aggregation Rule) The Aggregation Rule All the combustion plant (i.e. generators) on site should be aggregated together to check if the ‘facility’ exceeds the 50MW thermal input threshold. The permitted ‘site’ could have different boundaries to that in CCAs or EU ETS if the combustion plant is scattered over an area. For example, two data centres operated by the same company on different sides of a road or campus could be an aggregated facility and therefore the operator would need to consider all combustion plant across the two sites to check whether the IED 50MWth threshold is exceeded. It is up to data centre companies to consider this rule and propose suitable boundaries in the permit. The EA is concerned with environmental impacts so they will be looking out for things at one data centre that could give rise to the same environmental impact at another. Step 1 – Notify the local Environment Agency Officer (directly or via techUK) Much better to let the EA you are addressing your compliance rather than them coming asking you why you’re not