Keller Group Global D-Wall Workshop Equipment selection.

Slides:



Advertisements
Similar presentations
Kalpakjian Schmid Manufacturing Engineering and Technology © 2001 Prentice-Hall Page L3-1 Threading Die Figure (a) Straight chasers for cutting threads.
Advertisements

Loading and Hauling.
Excavating and Lifting Part 2
Present Procedure for cutting stuck casing on Drilling PLATFORM
Environmental Drilling By: Josh Humphreys October 8,2006.
Cairo Metro Line3 / Medinah Car Park II
© Easy Guides Australia An excavator means a self-propelled crawler or wheeled machine with an upper structure capable of up to a 360º rotation, which.
Diaphragm Wall Construction
3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine.
Lecture 4 Excavating and Lifting
Draglines and Clamshells
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Tunnelling Methods.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
Micrometer Sizes range from 0 to 1 inch up to 12 inches.
Road Traffic Accident Procedures (2) Service Delivery 2.
Basic Coring Device: Components: Head Tube Cable Piston The Head attaches to the top of the tube. The piston is inside the tube and attaches to the cable.
Excavating and Lifting Part 2
Drilling, Boring, Reaming, and Tapping
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
BASIC MUD LOGGING.
AASHTO LRFD Section 11 Abutments, Piers, and Walls
Excavation Methods  In order to set up a permanent habitat on the moon, trenches will need to be dug in order to cover important cables, protecting them.
Author: Loïc Lambert Support : Juan Carlos PEREZ 31 October TE-MSC-MDT Mechanical facilities in Group TE-MSC MDT Mechanical Workshop Machining.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Lesson 4 Drilling Cost & Drilling Rate
Drilling Holes Unit 42.
Drilling operation to get subsurface data. Why subsurface drilling is needed? As we cant look into subsurface directly, drilling is done to bring the.
P14119 Rochester Roots Adaptable High Tunnel Abstract Rochester Roots, a non-profit in Rochester, NY, uses urban agriculture as a tool for social and educational.
CONSTRUCTION TECHNOLOGY & maintenance
1 Chemical Rod Features of Chemical Rod Provides Low Impedance Earth Ideal for installations with limited space Product description LYTECH’s Chemical Rod.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Flexible Manufacturing 1 Copyright © Texas Education Agency, All rights reserved. Machining Skills.
Alwest Steering Replacement: As originally built, Catherine Ann (a 1972 Alwest 370 with flybridge) had cable steering much like that seen in older runabouts.
Step-by-step assembly instructions
Lecture 2 Introduction to Earthmoving
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Powerhouse Prodigy Compact Utility Loader
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. PowerPoint to accompany Krar Gill Smid Technology of Machine.
Ventilation Skill Drills.
IPC-2221 Connectors and Interconnects
2015 International Petroleum Environmental Conference
Joints for Diaphragm Walls
Rotating System Students: DINESH JOSHI RAJNISH VERMA RAMDEEN BISHNOI
MECHANISED BALLAST CLEANING DYNAMIC TRACK STABILISATION & UNIMAT
DIAPHRAGM WALLS.
INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA.
GROUND IMPROVEMENT BY P. VENKATESH REDDY. WHY GROUND IMPROVEMENT IS NECESSARY? Subsurface conditions can vary greatly within a single job site and the.
Machining Skills Flexible Manufacturing.
Overview of Petroleum Industry Chapter 4B – Drilling Operations
H, I & PLUS BEAM FABRICATION LINE WITH MATERIAL HANDLING
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Centripetal Acceleration
Diaphragm Wall: Construction and Design
EXCAVATION, LATERAL RESTRAINMENT FOR IT AND DEWATERING
Hydraulics Motor.
Threading Die Figure (a) Straight chasers for cutting threads on a lathe. (b) Circular chasers. (c) A solid threading die.
Powerhouse Prodigy Compact Utility Loader
SERVICES, LLC 1 1.
Step-by-step assembly instructions
From: Improved Ease of Use Designs for Rapid Heart Cooling
Contractor Safety Forum Submission January 16, 2018
Chapter 23 Machining Processes: Turning and Hole Making
How to Frame & Display Your Artwork
CONSTRUCTION METHODS & TECHNOLOGY
Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.
Activity 4.2.8d Satellite Flight Path Construction Guide
Presentation transcript:

Keller Group Global D-Wall Workshop Equipment selection

D-wall equipment selection  D-wall excavation equipment types: o Mechanical clamshell. o Hydraulic clamshell:  Free hanging.  Partial or full Kelly attachment. o Hydromill / Hydrofraise / Cutter

D-wall equipment selection  Free hanging cables operated mechanical clamshell: o Round or square jaws, depending upon type of end-stops system used. o Upper body frame used as guide to ensure vertical excavation. o Upper body frame weight will dictate capability of excavating dense soils. o Operator skills and experience are critical with this bucket type to control its swinging and guarantee vertical excavation. o Can be equipped with gyroscope type device for verticality control,

D-wall equipment selection  Free hanging cables operated mechanical clamshell: Low headroom clamshell

D-wall equipment selection  Hydraulic clamshell: o Free-hanging or attached to a Kelly-bar frame. o Round or square jaws, depending upon type of end- stops system used. o Kelly-bar frame will ease control and insertion of bucket into the guide-walls. o Kelly-bar frame will limit excavation capabilities into dense and hard soils. o Free-hanging hydraulic clamshell similar to mechanical bucket, but extremely powerful in dense soils (when not supported on full length Kelly). o Can be equipped with gyroscope type device for verticality control. o Operator “friendly” tools.

D-wall equipment selection  Hydraulic clamshell: Cable suspended Cable suspended & telescopic Kelly for GW ease of insertion and guidance

D-wall equipment selection  Hydraulic clamshell: Full length Kelly grabTelescopic Kelly grab

D-wall equipment selection  Hydromill / Hydrofraise / Cutter: o Reverse circulation rig. o Cut soils and rock into 3” size particles which are pumped with the drilling fluid and send to a large capacity desanding plant. o Desanding plant will separate the spoils from the drilling fluid and return the cleaned fluid to the excavation trench. o Will excavate into hard rock. o Equipment can be controlled and monitored in real-time as excavation progresses to great accuracy. o Can be used to great depth.

D-wall equipment selection  Hydromill / Hydrofraise / Cutter:

D-wall equipment selection  Hydromill / Hydrofraise / Cutter:

D-wall equipment selection  Hydromill / Hydrofraise / Cutter: Soilmec’s 250 m deep hydromill test

D-wall equipment selection  Hydromill / Hydrofraise / Cutter:

D-wall equipment selection  Hydromill / Hydrofraise / Cutter:

D-wall equipment selection  Bucket excavation monitoring: o Gyroscope / Inclinometer in bucket. o Records bucket path during excavation. o When bucket is out of panel, data sent to on- board computer for visual information to operator. o Some grabs are equipped with real-time monitoring and action on side flaps allows for verticality correction. o Use of Koden sonar caliper during and / or after excavation completion is recommended to final verification.

D-wall equipment selection  Bucket excavation monitoring:

D-wall equipment selection  Hydromill excavation monitoring: o Gyroscope / Inclinometer in hydromill body. o Records path during excavation and information is displayed real-time to the operator who can “steer” the hydromill and correct its path. o Use of Koden sonar caliper during and / or after excavation completion is recommended to final verification.

D-wall equipment selection  Hydromill excavation monitoring:

D-wall equipment selection  Koden sonar caliper verification:

D-wall equipment selection  Proposed selection guidelines: Equipment typeSoils Verticailty tolerance % BedrockDepth in m (ft) ClamshellAny0.5 to 1.0Weak / Weathered110 (330) Clamshell + Chisel-Medium110 (330) Kelly Grab soft to medium dense 0.5No55 (180) Hydraulic Clamshell Medium to very dense 0.5Medium70 (230) HydromillAny*< 0.5Hard to very hard ( ) * Performance in clay is limited and requires specific cutting wheels