PG&Es 2013 SmartAC Program Evaluation Dr. Stephen George DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014.

Slides:



Advertisements
Similar presentations
1 Case Study of Demand Response: Con Edison Business Program by Eileen Egan-Annechino Consolidated Edison Company of New York, Inc.
Advertisements

Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Load Impacts And Marketing Effectiveness from The Countrys Largest Dynamic Pricing Program Load Impacts And Marketing Effectiveness from The Countrys Largest.
Market Support Generation Workshop October 2, 2000.
RWTÜV Fahrzeug Gmbh, Institute for Vehicle TechnologyTÜV Mitte Group 1 GRB Working Group Acceleration Pattern Results of pass-by noise measurements carried.
Defaulting Customers onto CPP – Lessons from Actual Experience, 2009 Defaulting Customers onto CPP – Lessons from Actual Experience Josh Bode, FSC July.
Determining and Forecasting Load Reductions from Demand Side Programs September 11-12, 2007 Presented by: Bill Bland, V.P. Consulting, GoodCents Liza Thompson,
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Describing Data: Measures of Dispersion
1/9/2013 Sponge Mary purchased 6 apples for 1.26 and John purchased 8 for which person had the better rate? Show your work.
Alaska Accountability Adequate Yearly Progress January 2008, Updated.
I can count in decimal steps from 0.01 to
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Webinar: June 6, :00am – 11:30am EDT The Community Eligibility Option.
INVENTORY AND OVERHEAD
WIND INSIGHT a wind power forecasting tool for power system security management Dr Nicholas Cutler 21 March 2013
1 Heating and Cooling of Structure Observations by Thermo Imaging Camera during the Cardington Fire Test, January 16, 2003 Pašek J., Svoboda J., Wald.
OPEN ENROLLMENT Website Open and Close Dates OPENS at 12 am, October 21, 2013 CLOSES at 5 pm November 8, 2013 Members can go online as many times as they.
Connect Nevada Residential Technology Assessment Results.
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
Load Impact Estimation for Demand Response Resources Nicole Hopper, Evaluation Manager July 14, 2009 National Town Meeting on Demand Response and Smart.
Introduction Customer-Facing Subcommittee MA DPU Grid Modernization Subcommittee January 9, 2013 Tim Woolf | ©2013 Synapse Energy.
Vibrio vulnificus Calculator VMC/Gulf Regulators Conference Call August 1, 2008.
Why were PERA and SB7 passed? What will be the consequences? Dr. Richard Voltz, Associate Director Illinois Association of School Administrators.
Workshop for ‘Learning for Living and Work’ Summer Conference
Highlights From the Survey on the Use of Funds Under Title II, Part A
Input Development for SPSG Scenarios November 13, 2014 Arne Olson, Partner Nick Schlag, Sr. Consultant.
The Uninsured in Virginia: An Update Genevieve M. Kenney The Urban
Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
Energy Year 2014 Electricity Finnish Energy Industries.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
2013 Statewide BIP Load Impact Evaluation Candice Churchwell DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING ©2014 Navigant Consulting, Inc. May 7, 2014 Navigant Reference: Impact.
2013 SDG&E Summer Saver Load Impact Evaluation Dr. Stephen George DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
1 PG&E’s Operating Experience with TVP Rates Best Practices and Lessons Learned in Time-Variant Pricing R Residential Rate Workshop Gregory B.
Resource Adequacy Forecast Adjustment(s) Allocation Methodology
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Overview – Non-coincident Peak Demand
Presentation Overview
Colorado Rural Electric Association Energy Innovations Summit Demand Response: Are Customers Ready to Change Their Ways? Confidential October 27, 2014.
Coincident Peak Load Forecasting Methodology Prepared for June 3, 2010 Meeting with Division of Public Utilities.
EvergreenEcon.com ESA 2011 Impact Evaluation Draft Report Public Workshop #2 August 7, 2013 Presented By: Steve Grover, President.
2013 California Statewide Critical Peak Pricing Evaluation Josh L. Bode Candice A. Churchwell DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco,
CPUC Workshop on Best Practices & Lessons Learned in Time Variant Pricing TVP Pilot Design and Load Impact M&V Dr. Stephen George Senior Vice President.
CPUC Workshop on Best Practices & Lessons Learned in Time Variant Pricing TVP Load & Bill Impacts, Role of Technology & Operational Consideration Dr. Stephen.
Techniques for Evaluating Wildfire Smoke Impact on Ozone for Possible Exceptional Events Daniel Alrick 1, Clinton MacDonald 1, Brigette Tollstrup 2, Charles.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
FORECASTING (overview)
California’s Statewide Pricing Pilot Summer 2003 Impact Evaluation 17 th Annual Western Conference, San Diego, California Ahmad Faruqui and Stephen S.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
An Overview of Demand Response in California July 2011.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Building Blocks for Premise Level Load Reduction Estimates ERCOT Loads in SCED v2 Subgroup July 21, 2014.
Overview Review results Statewide Pricing Pilot Review results Anaheim Rebate Pilot Compare performance of models used to estimate demand response peak.
IMPACT EVALUATION OF BGE’S SEP PILOT Ahmad Faruqui, Ph. D. Sanem Sergici, Ph. D. August 12, 2009 Technical Hearings Maryland Public Service Commission.
2015 California Statewide Critical Peak Pricing Evaluation DRMEC Spring 2016 Load Impact Evaluation Workshop San Francisco, California May, 2016 Prepared.
LOAD FORECASTING. - ELECTRICAL LOAD FORECASTING IS THE ESTIMATION FOR FUTURE LOAD BY AN INDUSTRY OR UTILITY COMPANY - IT HAS MANY APPLICATIONS INCLUDING.
2013 Load Impact Evaluation Capacity Bidding Program (CBP) Steve Braithwait, Dan Hansen, and Dave Armstrong Christensen Associates Energy Consulting DRMEC.
DRMEC Spring 2016 Load Impacts Evaluation Workshop San Francisco, California May 10, SDG&E Summer Saver Load Impact Evaluation.
2015 SDG&E PTR/SCTD Evaluation DRMEC Spring 2016 Load Impact Workshop George Jiang May 11 th, 2016 Customer Category Mean Active Participants Mean Reference.
2013 Load Impact Evaluation of Southern California Edison’s Peak Time Rebate Program Josh Schellenberg DRMEC Spring 2014 Load Impact Evaluation Workshop.
2015 Load Impact Evaluation of Southern California Edison’s Peak Time Rebate Program May 11, 2016 Prepared by: Eric Bell Jenny Gai.
Customer Specific Regression Overview DRMEC Spring 2016 Evaluation and Enrollment Workshop – Session 3 Kelly Marrin, Director, Applied Energy Group.
Principal Load Profiling and Modeling
Davion Hill, DNV GL Elizabeth Endler, Shell
Emergency Response Service Baselines
Resource Adequacy Demand Forecast Coincidence Adjustments
Behavior Modification Report with Peak Reduction Component
Presentation transcript:

PG&Es 2013 SmartAC Program Evaluation Dr. Stephen George DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014

Agenda Program overview Ex post methodology and results Ex Ante methodology and results Relationship between ex post and ex ante Page 1

Overview of PG&Es SmartAC Program Page 2 AC load control through installation of control devices that limit the duty cycles of AC units Two types of devices: switches and PCTs Events called between May 1 st and October 31 st, up to 6 hours or less in each event, for a maximum of 100 hours per season: For testing purposes Based on an economic trigger For emergency or in anticipation of emergency conditions 151,000 residential accounts with 168,000 control devices Roughly 39,000 accounts and 43,000 devices dually enrolled in SmartRate – ex post impacts for this group are included in SmartRate evaluation but ex ante impacts on SmartAC only days included here 5,800 SMB accounts with 9,000 control devices Closed to new enrollment since 2011

Two test events were called in 2013 for residential SmartAC only accounts (none were called for SMB accounts) A series of one-hour test events on July 1, using different control and treatment groups for each hour, spanning the hours from 10 AM to 8 PM designed to assess how impacts differ for hours inside and outside the traditional resource adequacy (RA) window A one hour test event on September 9, from 2 to 3 PM Four events were called at the sub-LAP level in response to local emergency conditions East Bay on June 7 Los Padres on July 2 Geysers on July 3 North Coast on July 3 SmartAC ex post events in 2013 Page 3

Ex post impacts for test events were based on the difference in loads between large (~12,000), randomly chosen treatment & control groups that are near perfect clones Page 4 Loads for each randomly chosen group on July 11, 2012 event day

Hour Ending Treatment Group Reference Average Impact per Device Percent Aggregate Impact Average Temperature % % % % % % % % % % AverageN/A % Load impacts during the July 1 st multi-hour test events varied significantly across hours in the day Average impacts leading up to RA window were significantly less than during RA window Reference load between 11 AM and noon is ½ what it is from 5 to 6 PM and load impact is 1/6 of what it is from 5 to 6 Average impacts in later evening hours were comparable to those during the RA window PG&E plans to conduct more tests spanning these hours in 2014 RA Window (1 to 6 PM) Page 5

The ex ante load impact requirements are to produce forecasts for specified weather conditions and event window 1-in-2 year weather conditions 1-in-10 year weather conditions The basic approach is to use ex post impacts as input to a model describing the relationship between impacts and temperature Model was estimated on pooled data from 2011, 2012 and 2013 Future enrollment predicted to increase from 151,000 to 58,000 in 2015 and then stay constant until 2024 Similar methods were used for both residential and SMB Ex post impacts for SMB were taken from 2011 events since no test events were called in 2012 or 2013 Enrollment forecasted to decline steadily from around 5,000 in 2014 to roughly 3,800 in 2024 Page 6 Ex Ante Methodology

Four steps : Create weighted average ex post estimates combining SmartAC only and dually enrolled ex post estimates for each LCA for 2011, 2012 and 2013 using 2013 participant weights Regress 4-5 PM ex post impacts at LCA-level on LCA-specific customer- weighted average temperature from midnight to 5 PM (mean17) – a single regression was run pooling data across LCAs as testing showed that the relationship between mean17 and load impacts was consistent across LCAs Use regression to predict impacts from 4-5 PM under ex ante conditions Predict impacts for other hours (1-4 PM, 5-6 PM) based on observed ratios between impact at 4-5 PM and impact at each other hour (ratios are LCA- specific and vary with temperature) Commercial model is essentially the same, but makes concessions for smaller sample sizes LCA-specific temperatures, but one model across all LCAs using 2011 data Page 7

Ex Ante Methodology Page 8 Average Event Impacts From 4-5 PM Versus Mean17 Across All LCAs (2011, 2012 and 2013) Comparing ex ante and ex post estimates by LCA shows how often ex ante impacts are outside the historical range for some LCAs

SmartAC Residential Ex Ante Impacts Greatest aggregate load impact from 1 to 6 PM under 1-2 year conditions – 93 MW – is on the July system peak day The highest hourly impact under 1-in-2 year weather conditions is 125 MW Under 1-in-10 year weather conditions, the average impact from 1 to 6 pm – 109 – is also predicted to occur on the July system peak day The maximum hourly impact under 1-in-10 year conditions is estimated to equal 133 MW Estimates are about 10% lower than last years estimates Increase of dually enrolled from 18% to 26% reduces average Did not gross up 1 st hour for switch ramp in Aggregate Impacts Based on 2014 Projected Enrollment of 156,800 Weather Year Day Type Mean Hourly Per Customer Impact (kW) Max. Hourly Per Customer Impact (kW) Aggregate Mean Hourly Impact (MW) Aggregate Max Hourly Impact (MW) 1-in-2 Typical Event Day May Peak Day June Peak Day July Peak Day August Peak Day September Peak Day October Peak Day in-10 Typical Event Day May Peak Day June Peak Day July Peak Day August Peak Day September Peak Day October Peak Day Page 9

FactorAggregate Load Impact (MW) Explanation Ex post aggregate impact6.810% of SmartAC only population Scaled to full SmartAC population 81.7Combines SmartAC and dually enrolled for 100% of participant population Ex post weather, event conditions and enrollment, ex ante model 77.9Ex post is for 2012/2013 combined. Ex ante regression based on 2011, 2012 & 2013 data. 3 year model under predicts compared with two-year model below mean17 of 83°F. Ex post mean17 = 77°F. Ex post weather and enrollment, ex ante event window, ex ante model 67.7Ex ante event window from 1 to 6 PM reduces load impact by about 13%. Most ex post events were for much shorter window during hottest time of day. Ex post weather, ex ante window and enrollment (2014) residential enrollment was almost 4% less than 2014 projected enrollment 1-in-2 year weather74.6Mean17 for ex post events = 77.4; mean17 for 1-in-2 year weather = in-10 year weather98.5Mean17 for ex post events = 77.4; mean17 for 1-in-10 year weather = 83.6 Relationship Between Ex Post and Ex Ante Estimates Page 10

For comments or questions, contact: Stephen George Senior Vice President, Utility Services or Christine Hartmann Project Analyst Nexant, Inc. 101 Montgomery St., 15 th Floor San Francisco, CA